Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 29, 2021 SAM #7272
SOLICITATION NOTICE

C -- EHRM Infrastructure Upgrades Design NOLA New Orleans, LA 629-22-700

Notice Date
10/27/2021 1:04:03 PM
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
PCAC HEALTH INFORMATION (36C776) INDEPENDENCE OH 44131 USA
 
ZIP Code
44131
 
Solicitation Number
36C77621R0191
 
Response Due
11/5/2021 11:00:00 AM
 
Archive Date
02/12/2022
 
Point of Contact
Kara A. Evert, Procurement Technician, Phone: (216) 447-8300
 
E-Mail Address
kara.evert@va.gov
(kara.evert@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Awardee
null
 
Description
The purpose of this mod to previous pre-sol is to provide responses to the technical questions received and provide updates to two SOW attachments. SOW Attachment 03 has been revised to include the most recent Design Alert 6. SOW Attachment 12 is new COVID-19 guidance for Federal Contractors. The Final SOW has been revised to reflect these updated documents. Question 1: An Industrial Hygienist should not be needed as the facility was recently constructed and all existing site HAZMAT was fully abated. Can the requirement for an Industrial Hygienist as a key position / discipline be removed? VA Response: The requirement for an Industrial Hygienist has been rescinded. Question 2: A Structural Engineer should not be needed as no new external construction should be expected and the facility is not in a seismic zone. Can the requirement for a Structural Engineer as a key position / discipline be removed? VA Response: The requirement for a Structural Engineer has been rescinded. Question 3: The RFQ states, ""All projects provided must be completed ...."" Please provide the definition of a completed project. For example, is delivery of Construction Documents considered a completed design project, or is some other level of design maturity considered a completed project? VA Response: Factors 2 and 4 both contain the sentence All projects provided in the SF 330 must be completed by a firm, office, branch, or individual team member proposed to perform work under this contract. This sentence is not specifying a required level of completion. Completed in this sense means that the work on example projects being used to show experience must have been performed by a firm, office, branch, or individual team member proposed for this project.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/edd9f8a0686842c9baa122d4110a5f9b/view)
 
Place of Performance
Address: Southeast Louisiana Veterans Health Care System New Orleans VAMC 2400 Canal Street, New Orleans, LA 70119, USA
Zip Code: 70119
Country: USA
 
Record
SN06165425-F 20211029/211027230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.