Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 31, 2021 SAM #7274
SOLICITATION NOTICE

15 -- 15--STABILIZER,HORIZONT - AND OTHER REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Notice Date
10/29/2021 3:23:45 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038321RH382
 
Response Due
11/29/2021 12:00:00 AM
 
Archive Date
12/14/2021
 
Point of Contact
Telephone: 2156972560
 
E-Mail Address
JULIANA.STACK@NAVY.MIL
(JULIANA.STACK@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19| | | | | | | | | | | | | | | | | | | | TIME OF DELIVERY (JUNE 1997)|20| | | | | | | | | | | | | | | | | | | | | STOP-WORK ORDER (AUG 1989)|1| | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|invoice and receiving report (combo)| |HQ0339|N00383|S2606A|S2606A|SEE SCHEDULE|0PXV4| | | | | | | | | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| | EQUAL OPPORTUNITY (SEP 2016)|2| | | SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2| | | EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4| | | | | WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|SEE BOA TERMS & CONDTIONS|SEE BOA TERMS & CONDITIONS| | | | | SMALL BUSINESS SUBCONTRACTING PLAN (JUN 2020)|4| | | | | SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999)|9| | | | | | | | | | EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | | TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2| | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3| | | | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13| ||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3| | | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1| | ROYALTY INFORMATION (APR 1984)|1| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250| | | | | | | | | | | | TYPE OF CONTRACT (APR 1984)|1| | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2| |X| NAVSUP WSS IS SOLICITING FOR A NOT-TO-EXCEED ORDER TO BE PLACED AGAINST BOA N00383-17-G-A301. TERMS & CONDITIONS WILL BE IN ACCORDANCE WITH BOA N00383-17-G-A301. Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected intheAction Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business dayafter receipt and the Action Date entered in CAV must be dated to reflect theactual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in the subsequent contract. Required RTAT: SEE ATTACHMENT A Throughput Constraint: Contractor must provide a throughput Constraint foreachNSN(s). Total assets to be repaired monthly after initial deliverycommences X/month (contractor fill in #). A throughput of ##____ per monthreflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer.Such prices are based on the Contractor meeting the RTAT requirementsdescribed within the schedule page. If the Contractor does not meet theapplicable RTAT requirement, consideration will be assessed and subject tonegotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARECONSIDERED TO BE ""ISSUED"" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITEDIN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCEMETHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'SPROPOSAL CONSTITUTES BILATERAL AGREEMENT TO ""ISSUE"" CONTRACTUAL DOCUMENTS ASDETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1. SCOPE ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 4. QUALITY ASSURANCE ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;FAT; testing sample. ^ Block 14: Make submission to ;PCO NAVSUP WSS CODE N23 NAVAIR DCMA; . Block 13: Second submission required if the process/operation changes after approval of ;FAT; test. ^^ Block 14: Make submission to ;DCMA PCO NAVAIR NAVSUP WSS N23; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;FAT; testing sample. ^ Block 14: Make submission to ;NAVAIR NAVSUP WSS N23 DCMA PCO; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized, separate certifications are required. BLOCK #5: Contract Reference: ;Evaluate assembly IAW Statement of Work (SOW) and all associated repair/overhaul documents and requirements contained within SOW. All repairs are to be completed IAW SOW. For manufacturing purposes, all subassembly parts contained within P/N 74A172004-1009/1010 are controlled by their respective P/N blueprint drawings and associated JDRS CIM criticality determinations. Processes (during inspection, repair, and/or overhaul): 1. All critical processes contained within SOW will be certified and approved through successful completion of First Article Inspection/Test (FAI/FAT) by F18 FST Structures Engineering.F18 FST Structures Engineering will witness FAI/FAT.The capability to successfully complete FAI/FAT demonstrates overhaul/repair facilities ability to process P/N 74A172004-1009/1010. ; DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION. 1. SCOPE ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 4. QUALITY ASSURANCE ALL REPAIR/INSPECTION MUST BE PERFORMED IAW STATEMENT OF WORK (HARDCOPY) DATED 20 DECEMBER 2018 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE Reference folder 18305-0015: the 1st delivery shall be no later than 24 months ARO at a delivery rate of 8 per month. Tom Strain, x5806. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;FAT; testing sample. ^ Block 14: Make submission to ;PCO NAVSUP WSS CODE N23 NAVAIR DCMA; . Block 13: Second submission required if the process/operation changes after approval of ;FAT; test. ^^ Block 14: Make submission to ;DCMA PCO NAVAIR NAVSUP WSS N23; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;FAT; testing sample. ^ Block 14: Make submission to ;NAVAIR NAVSUP WSS N23 DCMA PCO; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized, separate certifications are required. BLOCK #5: Contract Reference: ;Evaluate assembly IAW Statement of Work (SOW) and all associated repair/overhaul documents and requirements contained within SOW. All repairs are to be completed IAW SOW. For manufacturing purposes, all subassembly parts contained within P/N 74A172004-1009/1010 are controlled by their respective P/N blueprint drawings and associated JDRS CIM criticality determinations. Processes (during inspection, repair, and/or overhaul): 1. All critical processes contained within SOW will be certified and approved through successful completion of First Article Inspection/Test (FAI/FAT) by F18 FST Structures Engineering.F18 FST Structures Engineering will witness FAI/FAT.The capability to successfully complete FAI/FAT demonstrates overhaul/repair facilities ability to process P/N 74A172004-1009/1010.; DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS THE STATEMENT OF WORK IS A HARD COPY. PLEASE CONTACT THEO WILLIAMS N231 FOR THIS DOCUMENT 3. REQUIREMENTS THE REPAIR STAATEMENT OF WORK IS HARDOPY. PLEASE CONTACT MR.THEO WILLIAMS N231 FOR HARD COPY. 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term ""contract"" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: STABILIZER,HORIZONT ;74A211001-1025; P/N, ;1560-01-618-3519; NSN, ;AS INDICATED IN THE STATEMENT OF WORK; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the ""prime contractor"" or the ""actual manufacturer"" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the ""Government Designated Agency"" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. STABILIZER,HORIZONT ;NORDAM GROUP; Company Name , ;11200 EAST PINE STREET TULSA, OKLAHOMA.74116; Address , ;29957; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE A TEAM FROM NAVSUP WSS, DCMA, AND FRCSW MUST WITNESS THE FIRST ITEM REPAIRED (FIRST ARTICLE TEST). PRIOR TO THE TEM VISIT, AT LEAST 30 DAYS, THE CONTRACTOR MUST PROVIDE COPIES OF THE COMPLETE REPAIR PROCESS, INCLUDING BUT NOT LIMITED TO: 1.RECEIVING AND INSPECTION REPORT 2.COMPLETE REPAIR PROCESS DOCUMENTATION AS INDICATED IN THE REPAIR MANUALS. 3.COMPLETE INSPECTION DOCUMENTATION. 4.ALL OTHER DATA RELEVANT TO THE RECEIPT AND REPAIR OF THE PART. COMPLIANCE WITH ALL REPAIR PUBLICATIONS AND STATEMENT OF WORK 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ Block 6: Forward additional copy to ASO code cited in Block 10.A on page 1. 1. This Data Item Description (DID) contains the format, content and preparation instructions for the data product resulting from the work task described in paragraph 5.4.3.4 or 5.4.8.3.3 of MIL-STD-973. 2. Copies of the Request for Waiver form are available from the DODSSP, Standardization Documents Order Desk, Building 40, 700 Robbins Avenue, Philadelphia, PA 19111-5094 3. Format an Content: The request for Deviation format and content shall be in accordance with Appendix E of MIL-STD-973
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/8971a048892b4a2d87e6591cd512094b/view)
 
Record
SN06167442-F 20211031/211029230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.