SAMDAILY.US - ISSUE OF NOVEMBER 03, 2021 SAM #7277
MODIFICATION

Z -- US Forest Service_ Delta National Forest 717 Culvert Replacement

Notice Date
11/1/2021 6:31:20 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA-FS, CSA EAST 11 Atlanta GA 303092449 USA
 
ZIP Code
303092449
 
Solicitation Number
12445122Q0001
 
Response Due
12/1/2021 5:00:00 AM
 
Archive Date
12/16/2021
 
Point of Contact
Cynthia Granderson, Phone: 6019651619, RIchard Huffman, Phone: 5013215324
 
E-Mail Address
cynthia.granderson@udsa.gov, richard.huffman@usda.gov
(cynthia.granderson@udsa.gov, richard.huffman@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This Request for Quote (RFQ) is issued pursuant to FAR 13 �by the United States Department of Agriculture (USDA), Forest Service� (FS), on behalf of the Delta National Forest, Holly Bluff, Mississippi. (Sharkey County 39088). Type of Contract: This is an Invitation for Bid (IFB) which will result in award of a firm-fixed price contract.� Award will be made to the lowest priced responsive/responsible bidder.� Set Aside: The project is set-aside 100% for small businesses. The associated NAICS of this acquisition is 237310 - Highway, Street, and Bridge Construction. PSC Code Z2LB �- Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways Magnitude: In accordance with FAR 36.204, the magnitude of this project is: magnitude of this project is: (c) Between $100,000 and $250,000 Location: Project Name and Location: Project Name and Location: The project location is 2.5 miles west of Holly Bluff, Mississippi. (Sharkey County 39088). 32.831348, -90.759575 ; https://www.google.com/maps/place/32%C2%B049'52.9%22N+90%C2%B045'34.5%22W/@32.831353,-90.7596206,100m/data=!3m1!1e3!4m14!1m7!3m6!1s0x8629717108f29ed3:0x75fdce7b9952b10e!2sHolly+Bluff,+MS+39088!3b1!8m2!3d32.8211746!4d-90.7083136!3m5!1s0x0:0x0!7e2!8m2!3d32.8313479!4d-90.7595746?hl=en Scope of Work: The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and supervision required to complete the work per the plans, specifications, and terms of the contract.� See the SOW for specific details not included under this paragraph This project will replace two 60� x 40� corrugated metal pipe culverts with two 60� x 68� 16 gage polymer coated corrugated metal pipe culverts on Road 717 on the Delta National Forest. Road 717, an aggregate surfaced road, is located on the county line between Sharkey and Yazoo Counties, Mississippi. Four culverts in the roadside ditches will be replaced to provide access to the adjacent land. The basins at each end of the 60� culverts will be armored with riprap and new 30� X 50� roadside ditch culverts will be installed to empty into those basins. The project location is 2.5 miles west of Holly Bluff, Mississippi. Remove the existing culverts and properly dispose of them off national forest property. Remove the existing gate and posts to the northwest of the culverts, taking care not to damage them, and place them in the adjacent wooded area outside the construction limits. Install the 60� culverts at the same alignment as the existing culverts (about a 6� left forward skew looking north), with invert elevations as shown on the plans. Install the 30� roadside ditch culverts as shown in the plans. Supplement the suitable excavated material with select borrow as needed and backfill the culverts as shown on the plans. Armor the inlet and outlet basins as shown in the plans with 200 lb. riprap over geotextile filter fabric. Any excavated material not suited for backfill is to be properly disposed of off national forest property. Place a 6� compacted layer of #610 (crusher run) crushed limestone aggregate over the excavated area of the roadbed to a width of 16�. Grade the edges to pull all aggregate back into the travel way and leave a straight, uniform edge, and grade the aggregate to create a smooth, uniform surface and compact. There will be no surfacing over the 30� culverts. On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acre, 13-13-13 fertilizer at 500 pounds per acre, and straw mulch at 3,200 pounds per acre. No tackifier is required on the mulch. If seeding is done from September 15 to March 15, in addition to the above spread rye grass seed at the rate of 80 pounds per acre. Applicable specifications may be found in FHWA�s FP-14 and the attached supplemental specifications. Benchmark: N.I.B. 8� Red Oak tree, 105� NW of the intersection of the CL of the road and CL of the existing culverts. Elevation = 89.56�. Dates: �� Issuance of the Request for Quotation (RFQ) �������������� ����������� 11/01/2021; Site(s) Visit/Pre-Bid Conf (if needed)���������� NA������������������������������ Date for Questions��������������������������������� 11/23/2021; Bid Submittal Deadline ��������������������������� 12/01/2021 / 0800 ET Award Date������������������������������������������ 12/06/2021 Completion Date 90 Days after NTP Solicitation and Documents: The solicitation and related documents will be available for download at http://beta.sam.gov �on or about 11-01-2021. No hard copies of the solicitation will be mailed out
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a8655f72f9854acfa652c2978ea36ef4/view)
 
Place of Performance
Address: Holly Bluff, MS 39088, USA
Zip Code: 39088
Country: USA
 
Record
SN06167976-F 20211103/211101230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.