Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 04, 2021 SAM #7278
SOLICITATION NOTICE

Y -- UT FLAP 2500(1) Taylor Mountain Road

Notice Date
11/2/2021 1:16:27 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF21B000017
 
Response Due
11/19/2021 1:00:00 PM
 
Archive Date
12/04/2021
 
Point of Contact
CFL Contracts
 
E-Mail Address
cflcontracts@dot.gov
(cflcontracts@dot.gov)
 
Description
THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. THIS IS A FULL AND OPEN COMPETITION. PROJECT DESCRIPTION: The UT FLAP 2500(1), Taylor Mountain Road project is located approximately 6 miles north of Vernal, UT in northeastern Utah. The project begins at the intersection of 2500 W and 3500 N and continues north for 6.67 miles to just past the Ashley National Forest (USFS) boundary. The existing roadway provides access to businesses, private residences, and the Ashley National Forest. The route is categorized as a rural minor collector in rolling terrain and is maintained by Uintah County. This project consists of the rehabilitation, restoration, and resurfacing (3R) of approximately 4.95 miles and reconstruction (4R) of approximately 1.71 miles of road. Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes (bedrock and soil), embankment, deep patch embankment stabilization, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including large pipes, deep pipes, and concrete headwalls), pavement markings, and updating signing. Select parking/pullouts and access road intersections will also be rehabilitated or reconstructed. SIGNIFICANT QUANTITIES (Schedule A): 20101-0000 Clearing and Grubbing: 41 ACRE 20420-0000 Embankment Construction: 18,000 CUYD 30101-0000 Aggregate Base: 19,000 TON 30401-5300 Full Depth Reclamation: 5.0 MILE 40101-0600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 16,000 TON Estimated total cost is $6,000,000 to $8,000,000.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/8a1350f6bb2b40fdb5b6fd697271191b/view)
 
Place of Performance
Address: Vernal, UT 84078, USA
Zip Code: 84078
Country: USA
 
Record
SN06169133-F 20211104/211102230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.