SOLICITATION NOTICE
Z -- Coos Bay North Jetty Repair
- Notice Date
- 11/3/2021 4:02:23 PM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
- ZIP Code
- 97204-3495
- Solicitation Number
- W9127N21B0022
- Response Due
- 9/1/2021 2:00:00 PM
- Archive Date
- 09/16/2021
- Point of Contact
- Harron Elloso, Phone: 503-808-4618, Kristina K. Morrow
- E-Mail Address
-
harron.e.elloso@usace.army.mil, Kristina.K.Morrow@usace.army.mil
(harron.e.elloso@usace.army.mil, Kristina.K.Morrow@usace.army.mil)
- Description
- 03 November 2021 The Bid Abstract is attached. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment 0005 The purpose of this amendment is to extend the deadline for bid submission. The new deadline is September 01, 2021 at 2PM PDT. ----------------------------------------------------------------------------------------------------- Amendment 0004 The purpose of this amendment is to: 1) Update Section 01 11 00.00 25 Page 3, 2) Update SEction 35 31 26.40 25, and 3) Update FAR Clause 52.211-10. -------------------------------------------------------------------------------------------------------- Amendment 0003 The purpose of this amendment is to provide updated specifications, specifically Section 35 31 26.40 25 Jetty Repairs. --------------------------------------------------------------------------------------------------------- Amendment 0002 The purpose of this amendment is to incorporate the date/time the pre-bid conference will be held. The Pre-Bid Conference will be held on August 9, 2021 at 2PM PST. ---------------------------------------------------------------------------------------------------------- Amendment 0001 - The purpose of this amendment is to: 1) Provide instructions for the pre-bid conference, and 2) Update the language in the responsibility determination. ------------------------------------------------------------------------------------------------------------ The U.S. Army Corps of Engineers Portland District intends to award a firm, fixed-price (FFP) Invitation for Bids contract for the Coos Bay North Jetty Repair project. The Coos Bay North Jetty is located on the southern end of the Coos Bay North Spit on the south-central Oregon coast near Charleston, Coos County, Oregon. Proposed Coos Bay North Jetty mandatory work includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,000 feet of the jetty trunk and head.� These sections will be constructed with a crest width of 30 to 40 feet, side slopes of 1V:2H to 1V:2.5V, and a crest elevation of +24.5 feet NAVD88.� The estimated stone volume required for the repairs is approximately 24,430 cubic yards with minimum stone densities between 175 and 180 pounds per cubic foot.� The jetty head repair includes construction of a toe berm with a crest width and height of 14 feet with side slopes of 1V:2H, and an elevation that varies with the relic stone base elevation.� A jetty access ramp may be constructed on the north side of the jetty adjacent to a staging area and above the mean higher high water elevation.� A temporary material off-loading facility may also be constructed in an area north of Log Spiral Bay on the east shoreline of the North Spit. Five areas totaling over 56 acres are available for material and equipment staging and storage, although no more than 20 acres can be used at any one time.� Optional work includes repairs to 3,000 feet of jetty trunk and root to a crest width of 20 to 30 feet, side slopes of 1V:1.5H to 1V:2H, and crest elevations ranging from +15.5 to 25.5 feet NAVD88.� The estimated stone volume for the optional repairs is 33,770 cubic yards with minimum stone densities between 167 and 175 pounds per cubic foot. Access to the north jetty is from the Trans-Pacific Highway to the North Spit roads that are single-lane, unmaintained dirt/sand roads.� Portions of these roads are unlikely to support heavy construction vehicles and equipment and the transport of materials without road improvements. The access roads will be closed to the public.� During construction, the contractor must maintain locked gates and provide barriers and signage to prevent public access to work areas. FINAL CONSTRUCTION PHYSICAL COMPLETION DATE for all jetty work: October 31, 2023 for the Base and September 30, 2024 for the Optional CLINs.� CONTRACT END DATE: December 31, 2023 if only the Base is awarded or December 31, 2024 if any Optional CLINs are awarded. The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000 for all base and optional CLINs. This requirement is an Unrestricted, Full and Open Competition. The NAICS Code for this procurement is 237990.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/bdd48880f1204619b9d9325d4550d662/view)
- Place of Performance
- Address: Charleston, OR, USA
- Country: USA
- Country: USA
- Record
- SN06170034-F 20211105/211103230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |