Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 12, 2021 SAM #7286
MODIFICATION

48 -- VALVE,GLOBE

Notice Date
11/10/2021 12:13:02 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010419QFE86
 
Response Due
11/15/2021 12:00:00 AM
 
Archive Date
11/30/2021
 
Point of Contact
Telephone: 7176053229
 
E-Mail Address
JOEL.CURTIS@NAVY.MIL
(JOEL.CURTIS@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See section C and E | INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-alone receiving report- certifications Combo-receiving report and invoice - material |Inspection at destination and acceptance at other-certifications Inspection at source and acceptance at source -materi al |TBD|N00104|TBD|N39040-certifications S4306A-material |N50286|TBD|Code 133.2|N/A|N/A|N39040|N/A|N/A|See applicable DD 1423 Data Items || NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery |one year from date of delivery ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|one|0001|30|270|NAVSUP WSS N743.13 5450 Carlisle Pike Mechanicsburg, PA 17055-0788|||60|x|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2019)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS CERTIFICATE (NOV 2014)|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2018)|12|332919|750||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| EVALUATION OF FIRST ARTICLE TESTING|5|||||| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| amendment issued for quantity change. closing date extended to 15 Nov 2021. amendment issued for quantity change. 1. Quantity changed from 6 EA to 4 EA. 2. Closing dated extended to 02 JAN 2020. \ 1. Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. NAVSUP WSS Mech will be considering past performance in the evaluation of Offers IAW 13.106. 3. Submission of all certification DD1423 Data Contract Data Requirements Lists(CDRLs) will be on or before 20 days prior to delivery. PNSY Review/Acceptance of certifications CDRLs 6 working days after receipt of certification DD1423 CDRLs. Final delivery of material will be on or before 480 days after contract effective date. 4. Consistent with FAR 52.216-18, all contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. 5. CDRL timeline: WELD PROCEDURE AND QUAL DATA 120 DAYS ADC LT APPROVAL OF WELD PROCEDURES AND QUAL DATA 60 DAYS AFTER RECEIPT RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS ADC DD APPROVAL OF RADIO RSS 30 DAYS AFTER RECEIPT PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RSS DD APPROVAL OF PR 30 DAYS AFTER RECEIPT FAT REPORT 270 DAYS AFTER APPROVAL OF PR LT APPROVAL OF FAT REPORT 60 DAYS AFTER RECEIPT \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3 Specification Revisions - The specification revisions listed under ""Docu ments References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;9510-038 57574 H B P2-42788-G01 57574 K B; DRAWING DATA=2177141 |80064| N| |D|0001 | N|49998|0298402 DRAWING DATA=2177141 |80064| N| |D|0002 | N|49998|0252131 DRAWING DATA=2177141 |80064| N| |D|0003 | N|49998|0344760 DRAWING DATA=2177141 |80064| N| |D|0004 | N|49998|0354467 DRAWING DATA=2177141 |80064| N| |D|0005 | N|49998|0154878 DRAWING DATA=2177141 |80064| N| |D|0006 | N|49998|0158996 DRAWING DATA=2177141 |80064| N| |D|0007 | N|49998|0156609 DRAWING DATA=2177141 |80064| N| |D|0008 | N|49998|0155674 DRAWING DATA=2177141 |80064| N| |D|0009 | N|49998|0158881 DRAWING DATA=2177141 |80064| N| |D|0010 | N|49998|0110663 DRAWING DATA=2177141 |80064| N| |D|0011 | N|49998|0177604 DRAWING DATA=2177141 |80064| N| |D|0012 | N|49998|0108121 DRAWING DATA=2177141 |80064| N| |D|0013 | N|49998|0104919 DRAWING DATA=2177141 |80064| N| |D|0014 | N|49998|0100504 DRAWING DATA=2177141 |80064| N| |D|0015 | N|49998|0117630 DRAWING DATA=2177141 |80064| N| |D|0016 | N|49998|0108643 DRAWING DATA=2177141 |80064| N| |D|0017 | N|49998|0089056 DRAWING DATA=2177141 |80064| N| |D|0018 | N|49998|0115567 DRAWING DATA=2177141 |80064| N| |D|0019 | N|49998|0221561 DRAWING DATA=2177141 |80064| N| |D|0020 | N|49998|0135619 DRAWING DATA=2177141 |80064| N| |D|0021 | N|49998|0091448 DRAWING DATA=2177141 |80064| N| |D|0022 | N|49998|0116349 DRAWING DATA=2177141 |80064| N| |D|0023 | N|49998|0082591 DRAWING DATA=2177141 |80064| N| |D|0024 | N|49998|0133573 DRAWING DATA=2177141 |80064| N| |D|0025 | N|49998|0076110 DRAWING DATA=2177141 |80064| N| |D|0026 | N|49998|0116758 DRAWING DATA=2177141 |80064| N| |D|0027 | N|49998|0077673 DRAWING DATA=2177141 |80064| N| |D|0028 | N|49998|0089880 DRAWING DATA=2177141 |80064| N| |D|0029 | N|49998|0111468 DRAWING DATA=2177141 |80064| N| |D|0030 | N|49998|0074731 DRAWING DATA=2177141 |80064| N| |D|0031 | N|49998|0284720 DRAWING DATA=253450 |43689| V|1N |D|0001 | V|49998|0084204 DRAWING DATA=253450 |43689| V|1N |D|0002 | V|49998|0061262 DRAWING DATA=253450 |43689| V|1N |D|0002.A | V|49998|0027979 DRAWING DATA=253450 |43689| V|1N |D|0003 | V|49998|0018854 DRAWING DATA=253450 |43689| V|1N |D|0004 | V|49998|0068718 DRAWING DATA=253450 |43689| V|1N |D|0005 | V|49998|0038985 DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-A182 | | |A |160901|A| | | DOCUMENT REF DATA=ASTM-A216 | | | |160301|A| | | DOCUMENT REF DATA=ASTM-A479 | | |A |160501|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Complete 3 Inch IPS In line throttle valve with Buttweld Schedule 80 end connections per Newport News Drawing 253450 Line 4 shall be in accordance with NAVSHIPS drawing 803-2177141 and assembly 803-2177141-372AF modified for LIMITORQUE SMB00-15 operator to Velan drawing 9510-038 and drawing P2-42788-G01 item 002, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;BODY;PIECE 1 ON DRAWING 803-2177141; Material - ;ASTM-A216 GRADE WCB; Part - ;BONNET; PIECE 3 ON DRAWING 803-2177141; Material - ;FORGED ASTM-A182 GRADE F11, CLASS 2, Normalized and Tempered; Part - ;STEM; PIECE 81 ON VELAN DRAWING 9510-038; Material - ;ASTM-A479, condition 3, type 410 with mechanical properties listed in general notes 4.A and 5.T of drawing 2177141; 3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;Dye Penetrant Inspection; Item - ;ALL HARD FACED SEATING SURFACES (AFTER FINAL MACHINING); Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;Magnetic Particle Inspection; Item - ;Forged Bonnet: piece 3 on drawing 803-2177141, stem: piece 81 on Velan drawing 9510-038 and Body: piece 1 on drawing 2177141; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - ;All applicable pressure tests; Item - ;Each Valve assembly; Performance - ;GENERAL NOTE 1.B OF DRAWING 803-2177141; Acceptance - ;GENERAL NOTE 1.B OF DRAWING 803-2177141; 3.4 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. 3.5 Radiography is required on ;the cast body, Piece 1; . 3.5.1 Sample radiography is required for certain cast pieces per the drawing. Submission of RSS and Production Radiography is not required for sample radiography on these Non-Certified piece parts. 3.6 ;General note 5.O of drawing 2177141 does not apply.; 3.7 Internal Threads - All internal threads shall be formed by cutting. Cold forming of internal threads is not acceptable. 3.8 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887056120X; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type ""C"" on brass or Type ""H"" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.9 ;The NSN for this item must be stamped on the name plate, piece 26.; 3.10 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required. 3.11 Heat Treat Requirements - Mechanical properties (via tension testing and hardness testing if hardness is required by the applicable material specification) are required for each heat in each heat treat charge for ASTM-A234, ASTM-A403, ASTM-A182, and ASTM-A105 material. 3.11.1 If heat treatment is performed in continuous-type furnaces with suitable temperature control and equipped with recording pyrometers so that complete heat-treatment records are available, a heat-treatment charge shall be considered as any continuous run not exceeding an 8-hr duration. One tension test shall be taken from one forging per heat in each heat treatment charge at a minimum of every 8 hours. 3.11.2 Certification of Mechanical Properties (Mechanical Analysis, Tension Testing) shall include the condition furnished. The contractor shall maintain a complete record on file of the heat treatment given each piece, including stress relief. The contractor shall provide either the record of the final heat treatment or a heat treatment certification statement. The certification statement shall be signed by the heat-treater and include the date of heat treatment, duration and temperature of heat treatment operations and quenching medium (if required). 3.12 Welding or Brazing - When welding, brazing, and allied processes are required, they shall be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.13 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.13.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners shall be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.14 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.14.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.14.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.14.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.15 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor shall prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.16 Mercury Free - Mercury and mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested shall be furnished along with a copy of the test results. Certification shall include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments shall be identified to weld joint and layer. 3.18 See CDRLs DI-MISC-80875 (Welding Procedures) and DI-MISC-80876 (Weld Procedure Qualification Data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data shall be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below shall be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.18.1 Approval of the Contractor's qualification data shall be obtained prior to performing any welding (production or repair). 3.18.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract shall be submitted at the same time. Welding procedures and qualification data shall be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor shall state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ""WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC."" ""WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.""). Authority for the repair of Special Repairs in castings and authority for the repair of wrought or forged material shall be obtained from the Procurement Contracting Officer. This request shall describe the defect; including size, depth, location, and a description of the proposed repair. This request for NAVSUP-WSS Contracts shall be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.18.3 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 48 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 48 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.18.4 When drawings require hard facing surface Iron content (Nickel for Monel valves) not to exceed 5%, the contractor shall verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results shall be submitted as part of the qualification data. 3.18.5 Qualification requirements for production hardfacing: The maximum qualified thickness for hardfacing shall be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT (Non-Destructive Testing) and any additional drawing requirements. The minimum qualified thickness is the final machined thickness at which hardness testing, NDT, macro-etch, and any additional drawing requirements are satisfactorily performed. 3.18.6 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs) shall be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution shall be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.18.7 Qualification requirements for production cladding: The maximum qualified thickness for cladding shall be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT and any additional drawing requirements. The minimum qualified thickness is the final machined thickness at which NDT, side bends, macro-etch testing, and any additional drawing requirements are satisfactorily performed. 3.18.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.18.9 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and shall include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.18.10 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein shall be passed down to the subcontractor. 3.19 Radiography (RT) - Radiography shall be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level Iper the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable. 3.19.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing theradiography shall be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketches are not required for radiography of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend only on the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this datahas been previously approved by a Navy activity, the original approval letter shall be submitted at the same time as RT film and reader sheet submittal. 3.19.2 All pieces radiographed shall be permanently marked with ""RT"" and a unique RT serial number. (The unique RT serial number must be directly traceable tothe RT film.) 3.19.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiographyrequires final acceptance by the Navy. The items listed below shall be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection. (a) Film (b) RSS/RSSS (c) RS (d) DD250 (with unique RT serial numbers traceable to the RT film) 3.20 See CDRL DI-NDTI-80809 (First Article Testing) - First Article Test/Inspection (Contractor) - The Contractor shall conduct ;non-destructive; First Article Test/Inspection on ;1; unit(s) in accordance with requirements ;of General Note 7 of Drawing 803-2177141; . 3.21 Quality System Requirements - The Contractor furnishing items under this contract/purchase order shall provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.21.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.21.2 The Contractor's quality system shall be documented and shall be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor shall, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.21.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.21.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.21.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.22 Contractor Inspection Requirements - The Contractor shall maintain adequate records of all inspections and tests. The records shall indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records shall be traceable to the material inspected. 3.22.1 The supplier's gages, measuring and test equipment shall be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel shall be made available for operations of such devices and for verification of their accuracy and condition. 3.22.2 All documents and reference data applicable to this contract shall be available for review by the Government representative. Copies of documents required for Government inspection purposes shall be furnished in accordance with the instructions provided by the Government representative. 3.23 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents shall be annotated with the following statement: ""A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."" 3.23.1 The prime contractor's program shall include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.23.2 Each sub-tier supplier of material or services for items in Section 3 of this contract shall be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.23.3 The prime contractor shall ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product shall be dependent upon the effect of the purchased product on the end item represented by this contract. 3.23.4 The prime contractor shall evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation shall be established. Records of this effort shall be available for r...
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/bb8c0e066fc14aa788d6b4e49131997b/view)
 
Record
SN06174871-F 20211112/211110230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.