Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 12, 2021 SAM #7286
SPECIAL NOTICE

Y -- DRAFT-Phase I DB RFP

Notice Date
11/10/2021 11:45:01 AM
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT FT WORTH FORT WORTH TX 76102-6124 USA
 
ZIP Code
76102-6124
 
Solicitation Number
W9126G21R0097
 
Response Due
11/29/2021 9:59:00 PM
 
Archive Date
11/30/2021
 
Point of Contact
Benjamin Aldrich, Phone: 8178861181
 
E-Mail Address
CESWF-IIS@usace.army.mil
(CESWF-IIS@usace.army.mil)
 
Description
US Army Corps of Engineers Southwestern Division, Interagency and International Services El Paso Veterans Administration (VA) New Health Care Center DRAFT � Phase I DB RFP NOTICE:� This is not a solicitation for proposals and no contract will be awarded from this notice; therefore, no proposals are required at this time.� No reimbursement will be made for any costs associated with providing information to this notice nor any follow-up information requests.� The US Army Corps of Engineers, Fort Worth District has been tasked to solicit for and award a project for vertical construction services to construct a New Health Care Center for the Department of Veterans Affairs (DVA) Office of Construction and Facility Management (CFM). The proposed project is planned as a Design-Build (DB) contract. The DRAFT Phase I DB RFP is available for comment through ProjNet www.Projenet.org/ utilizing Key Access #: 7X7AN4-V465BD.� The comment period closes Monday 29 November 2021 at 11:59PM CT.�� Comments received will be evaluated for incorporation into the final Phase I RFP.� PROJECT DESCRIPTION: The work will consist of the design and construction of a new health care center with approximately 492,996 square feet to replace the existing Department of Veterans Affairs (DVA) health care center for the El Paso Veterans Affairs Health Care System (EPVAHCS), including construction of a new central utility plant. Construction will be located on Fort Bliss adjacent to the new William Beaumont Army Medical Center (WBAMC). Primary facility will include the complete health care center replacement, consisting of ambulatory care, outpatient clinics, ancillary services, building information systems and special foundations, utilizing Evidence Based Design (EBD). Supporting facilities will include site work, surface parking, utilities, storm water infrastructure and associated improvements necessary to support the new health care center. Disposition of the existing facility is not included.� The project will be designed in accordance with the DVA Technical Information Library (TIL) as well as with applicable Unified Facilities Criteria (UFC). Operations and maintenance manuals, commissioning, and comprehensive building and furnishings related interior design services are required. Air Conditioning (Estimated 3,500 Tons). The El Paso VA New Health Care Center project magnitude is estimated at >$500 million and will have a period of performance of approximately 1,530 days.� The El Paso VA New Health Care Center project is still under development, so these estimates may change. Project Schedule Milestones: Jan 2022 � Presolicitation Notice Mar 2022 � Phase I DB RFP Solicitation Apr 2022 � Phase I Proposal Receipt Jun 2022 � Phase I Down Select Approved Jul 2022 � Phase II Draft DB RFP Shared with Down Selected Offerors Aug 2022 � Phase II DB RFP Solicitation Nov 2022 � Phase II Revised Proposal Receipt Mar 2023 � Award CONTACT INFORMATION: Benjamin Aldrich CESWF-IIS@usace.army.mil
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b2bee40dc12a495aa2a795ef0d3135e6/view)
 
Place of Performance
Address: Fort Bliss, TX, USA
Country: USA
 
Record
SN06174928-F 20211112/211110230051 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.