15 -- 15--AILERON, IN REPAIR/MODIFICATION OF

Notice Date
11/12/2021 3:23:11 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038322RH034
 
Response Due
12/13/2021 12:00:00 AM
 
Archive Date
12/28/2021
 
Point of Contact
Telephone: 2156970288
 
E-Mail Address
MACKENZIE.CANNATARO@NAVY.MIL
(MACKENZIE.CANNATARO@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELIVERY OF UNIT|45 DAYS AFTER THE DEFECT WAS FOUND||||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2021)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)|13|336413|1250|||||||||||| TYPE OF CONTRACT (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in theAction Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receiptand the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 90 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commencesX/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACUTAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS, AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE ""ISSUED"" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO ""ISSUE"" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. EARLY AND INCREMENTAL DELIVERIES ACCEPTED. 1. SCOPE ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 27 JUNE 19 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 2. APPLICABLE DOCUMENTS ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 27 JUNE 2019 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 3. REQUIREMENTS ITEM WILL BE REPAIRED / OVERHAULED IN ACCORDANCE WITH HARD COPY STATEMENT OF WORK (SOW) REV BASIC, 27 JUNE 2019 CONTACT N231 THEOTIS WILLIAMS FOR HARD COPY SOW 4. QUALITY ASSURANCE SEE PARAGRAPH 5.0 IN STATEMENT OF WORK FOR FIRST ARTICLE INSPECTION REQUIREMENTS 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;AS REQUIRED ; testing sample. ^ Block 14: Make submission to ;PCO NAVSUP WSS NAVAIR; . Block 13: Second submission required if the process/operation changes after approval of ;AS REQUIRED; test. ^^ Block 14: Make submission to ;PCO NAVSUP WSS NAVAIR; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;AS REQUIRED; testing sample. ^ Block 14: Make submission to ;PCO NAVSUP WSS NAVAIR; . ^^ Block 14: Make submission to ASO codes at time of contract completion. Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submittal of ;1M; testing sample(s). Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized, separate certifications are required. BLOCK #5: Contract Reference: ;Certifications of the following: (26512) 123CS10008-601 1. Certification of Material: a) In accordance with the Statement of Work and the applicable repair overhaul publication for the subject item (see paragraph I). 2. Certification of Process: a) In accordance with the Statement of Work and the applicable repair / overhaul publication for the subject item (see paragraph II). b.All hinge points must be positioned and aligned by Northrop Grumman approved fixture (drawing P-92669) or NAVAIR approved equivalent fixture. c.Note Code 46: Flag Note - Weight & Movement about hinge axis is to be taken with all weights, static wicks and skins in place and painted. Final balance to be static -20 to +10 inch-pound, such that positive balance is trailing edge heavy. d.Aileron balance checked on Northrop Grumman approved fixture P-95345 and 123CS10008-1-2CF) or NAVAIR approved equivalent fixture. 3.Certification of Inspection: a) In accordance with the Statement of Work and the applicable repair overhaul publication for the subject item (see paragraph III).b.Nondestructive Inspection IAW NAVAIR 01-1A-16-1 and NAVAIR 01-1A-16-2; DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a14fb3b6f7a44e448c4595b10b19bb72/view)
 
Record
SN06175993-F 20211114/211112230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.