SOLICITATION NOTICE
R -- Depot Maintenance Plant Equipment (DMPE) 23
- Notice Date
- 11/15/2021 6:42:32 AM
- Notice Type
- Presolicitation
- NAICS
- 339999
— All Other Miscellaneous Manufacturing
- Contracting Office
- DLA LAND AT ABERDEEN ABER PROV GRD MD 21005 USA
- ZIP Code
- 21005
- Solicitation Number
- DMPEFO23
- Response Due
- 11/29/2021 1:00:00 PM
- Archive Date
- 11/29/2021
- Point of Contact
- Johnny Woods, Phone: 4436861913
- E-Mail Address
-
johnny.woods@dla.mil
(johnny.woods@dla.mil)
- Description
- Synopsis ADD-ON The purpose of this Synopsis, in accordance with FAR 5.201, is to announce the Government�s intent to issue a Task Order against contract SPRBL1-15-D-0017.� Our market research suggests that Raytheon is the sole approved source capable of providing the services detailed below. SPRBL1-15-D-0017 is a nine (9) year Indefinite-Delivery Indefinite Quantity (IDIQ) contract providing for the support of Depot Level Repairable (DLR) and consumable spare parts as well as repair and engineering services provided by Raytheon that are associated with sole-source Raytheon manufactured system components. The contract was awarded on 28 September 2015. The period of performance includes a six (6) year base period followed by one (1), three (3) year re-determinable option period. The contract maximum ceiling is $495.6M. Furthermore, a modification was issued on 6 July 2020 that increased the ceiling to $8B. This modification also extended the ordering period from 27 September 2024 to 26 September 2025. Task Order: Following issuance of the aforementioned contract modification, it is the Government's intent to issue a Task Order under Contract SPRBL1-15-D-0017 for the Depot Maintenance Plant Equipment (DMPE) 23. The requirement is to provide continued repair, maintenance, and logistical support, and increase the reliability and quality of the DMPE stations used in support of the PATRIOT Missile Systems. Per DLAD 52.216-9006 (AUG 2005), Addition/Deletion of Items, the add-on procedures under this clause will be followed. There will be no separate solicitation issued for this action. This acquisition is for DMPE services against items for which the Government does not possess specifications or a technical data package; therefore, the Government intends to contract only with approved sources under the authority of 10 U.S.C. 2304 (c) (I). Approved Source(s): Raytheon Company (CAGE 05716). The projected period of performance for the subject Task Order will be November 2022 through October 2027. The security clearance and safeguarding level for this task order is Secret. Please note that this is not a Request for Proposal. This notice is provided for planning purposes and is not to be construed as a commitment by the U.S. Government. Requirement: The Governments� requirement is: - to procure, integrate, and test software and hardware necessary to upgrade the P2261, P2271, and P2275 Radar Test Stations located on the Letterkenny Radar Test Site.� The test station computer shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand 2013).� The contractor shall update the Test Software to be compatible with system updates while retaining all test capability for Post Deployment Build 8 software.� - to provide 960 hours of technical support and advice on the installation, checkout, maintenance and repair of existing DMPE located at LEAD.� The assistance effort shall include travel cost based on 4 maintenance assistance plus 8 quarterly Information Assurance assistance trips to LEAD.� Total of 12 engineering team trips with each trip consisting of a 2 person team staying for 5 days. - to procure, integrate, and test software and hardware necessary to deliver a second Launcher Test Station and upgrade the station currently in use.� The test station computers shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand).� The contractor shall include a recommended list of spare parts for the depot to maintain the test stations.� The upgrades shall include implementation of Information Assurance and Cyber Controls established in DMPE 21. - to procure, integrate, and test software necessary to deliver a new Portable DITMCO Cable Tester for use in maintenance of cables used on the P2258 and PAT244M.� The test station computer shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand).� The contractor shall include a recommended list of spare parts for the depot to maintain the test station.� The upgrades shall include implementation of Information Assurance and Cyber Controls established in DMPE 21. - to procure, integrate, and test software and hardware necessary to upgrade the PAT244M, PAT247M, and PAT248 with Chiller System replacement, and the Programming Station located at Building 370.� The test station computer shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand 2013).� The contractor shall update the Test Software to be compatible with system updates.� The contractor shall include a recommended list of spare parts for the depot to maintain the test stations.� The upgrades shall include implementation of Information Assurance and Cyber Controls established in DMPE 21. - to procure, integrate, and test software and hardware necessary to deliver a replacement for the legacy P2259 test station.� The test station computer shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand).� The contractor shall include a recommended list of spare parts for the depot to maintain the test station.� The upgrades shall include implementation of Information Assurance and Cyber Controls established in DMPE 21. - to procure, integrate, and test software and hardware necessary to upgrade Field Test Kits (FTK).� The test station computer shall run the latest commercially available and contractor approved Operating System (i.e. Microsoft Windows 10) and host software (i.e. National Instruments LabVIEW Developer Suite with Test Stand).� The contractor shall include a recommended list of spare parts for the depot to maintain the test stations.� The upgrades shall include implementation of Information Assurance and Cyber Controls established in DMPE 21. - to procure, and test hardware necessary to deliver spare parts for legacy test stations based on requirements established by Letterkenny personnel
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/c64d9ef930df4d9288870d6263487f47/view)
- Place of Performance
- Address: Aberdeen Proving Ground, MD 21005, USA
- Zip Code: 21005
- Country: USA
- Zip Code: 21005
- Record
- SN06176727-F 20211117/211115230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |