SOURCES SOUGHT
99 -- Miter Gate Hydraulics Upgrades, Emsworth Locks and Dams, Ohio River, Pennsylvania
- Notice Date
- 11/16/2021 11:47:42 AM
- Notice Type
- Sources Sought
- Contracting Office
- US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN22SSMGHU
- Response Due
- 12/3/2021 10:00:00 AM
- Archive Date
- 12/18/2021
- Point of Contact
- Emma Coble, Phone: 4123957478, Fax: 4123957110, Janie L. Roney, Phone: 4123957474
- E-Mail Address
-
Emma.N.Coble@usace.army.mil, janie.l.roney@usace.army.mil
(Emma.N.Coble@usace.army.mil, janie.l.roney@usace.army.mil)
- Description
- This is a Sources Sought and is a Request for Information (RFI) only. This is not a solicitation�announcement, nor is it a Request for Proposal (RFP). No solicitation is currently available. This�request does not obligate the Government in any contact award. The Government will not pay for the�provision of any information, nor will it compensate any respondents for the development of such�information. Response to this notice is strictly voluntary and will not affect any firm's ability�to submit a proposal if and when a solicitation is issued. The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is conducting market research to�determine the business size and capabilities of potential sources for the construction of a secant�pile wall as identified below. Description of Requirement: The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the upgrade of�the miter gate hydraulics systems at Emsworth Locks and Dams, Ohio River, PA. The contract�generally includes the installation of four (4) dedicated hydraulic power units (HPU) on the main�chamber with new variable frequency drive (VFD) motor control centers (MCC), installation of a new�central HPU for the auxiliary chamber, demolition of the existing central HPU, and demolition of�existing hydraulic pipes and valves associated with the main chamber. �The major features of the�requirements are identified below: The contract specifically includes: a. � Installation of additional shutoff valves on the middle wall oil piping to enable removal of�the main chamber miter gate operating machinery from the existing central hydraulic network. b. � Testing of existing fiber optic network and production of network map. c. � Furnishings and installation of four dedicated HPU, including raised concrete pads,�protection, associated electronics and hardware, and hydraulic oil, by each of the miter gate�locations on the main chamber. d. � Furnishing and delivery of spare dedicated HPU. e. � Furnishing and installation of VFD control MCCs on the land and middle walls. f. � �Furnishing and installation of new auxiliary chamber HPU on middle wall, including all�associated electronics and hardware. g. � Furnishing and delivery of spare motor and pump for auxiliary HPU. h. � Furnish and install new miter gate position feedback sensors. i. � �Modification of existing control software to allow for automated miter gate operation and HPU�monitoring j. � �Demolition and disposal of existing HPU located in the middle wall operation building. This�includes all motors, pumps, reservoir, raised skid, associated piping, and proper disposal of�hydraulic oil. k. � Demolition and removal of all existing hydraulic oil lines on the land wall, including all�lines for pressure, return, drain, and filling, valving, and proper disposal of hydraulic oil. l. � �Integration of new system with existing fiber optic communication cabling. Removal and proper disposal of hydraulic oil will be required. �Removal and proper disposal of�electrical equipment will be required. Ferrous and all other construction waste material will be�disposed of at commercially permitted facilities licensed to accept waste or recyclable materials�as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam�gates. The existing lock chambers and dams are currently operated and staffed by Government�personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at�the approval of Government. INTERESTED SOURCES MUST PROVIDE THE FOLLOWING INFORMATION: (1) Company name and address (2) Company point of contact, telephone number, and email address (3) Company CAGE Code (4) Company business size, to include designation as large business, small business, HUBZone, 8(a), Services Disabled Veteran Owned Small Business, Small Disadvantaged Business or Women-Owned Small�Business (5) Details of the company experience and/or capabilities in completing the listed requirements All responses to this RFI shall be emailed to Emma Coble at Emma.N.Coble@usace.army.mil by 1:00 pm�ET on December 3, 2021. TELEPHONE INQUIRES WILL NOT BE ACCEPTED. �
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/840ebcb45cb7446196d4deb49a6de875/view)
- Place of Performance
- Address: Pittsburgh, PA 15202, USA
- Zip Code: 15202
- Country: USA
- Zip Code: 15202
- Record
- SN06178625-F 20211118/211116230127 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |