SOLICITATION NOTICE

N -- Steam Double Block and Bleed Valve Amendment A00003

Notice Date
11/17/2021 2:12:38 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
241-NETWORK CONTRACT OFFICE 01 (36C241) TOGUS ME 04330 USA
 
ZIP Code
04330
 
Solicitation Number
36C24122Q0061
 
Response Due
11/19/2021 11:00:00 AM
 
Archive Date
01/18/2022
 
Point of Contact
Joshua.Gallien@va.gov, Joshua Gallien, Phone: 413-584-4040 X6460
 
E-Mail Address
Joshua.Gallien@va.gov
(Joshua.Gallien@va.gov)
 
Awardee
null
 
Description
** AMENDMENT A00003 West Haven Steam Double Block and Bleed Valve Contractor Questions and Government Responses. Please confirm receipt of ALL Amendments within your RFQ Submission package ** Question 1 Since the VA does not have any drawings for the existing line that the block and bleed system is being integrated into, how was the piping size and schedule validated? Can the flange markings to the right of the block and bleed location be verified? The markings should include the SA/A specification, size, B16 rating, # rating, flange style, etc. The material specification can also be used to ensure proper welding is performed per the Welding Procedures and Welder Qualifications.  Answer 1 There were markings on the flange to the right of the location that were hard to read due to location but had a noted 8-150 STD SA before being unreadable. Question 2 The flange to the right of the block and bleed location does not have any thread protrusion through the nut faces. Is the contractor(s) liable for any part of this area or other adjacent areas that may not conform to good engineering practices?  Answer 2 Anything outside of the area of the block and bleed are not of your concern. Existing connections are to remain. The contractor is responsible only if they break the existing connection between the flanges, for example. Question 3 Since schedule 80 piping is required, are 300# flanges also required? Answer 3 The minimum pound flanges are 250#. If they are unavailable then 300# is the next best, then they shall be required. Question 4 Are OS&Y valves the only valves that can be used for the 8' valves?    Answer 4 Please see revised drawing. The previous drawing switched the OSY and Gate valves. The 8 OSY change to 8 Gate, and the 1 Gate change to 1 OSY. Let it be clear that the expected tie in for condensate would be to the near 5 line. Question 5 In addition to the 10% radiographed welds, are the remaining 90% of welds required to be inspected by a Certified Welding Inspector? Answer 5 Of all the welds, each shall require 10% x-ray review. Question 6 Under 13.C.F.R. 125.6, do all subcontractors have to be certified in VIP if the Prime Contractor is certified in VIP? Answer 6 Subcontractors are not required to be verified in VIP, but vendors who are not verified in VIP cannot be considered as Service-Disabled Veteran Owned or Veteran Owned small businesses.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/707fedb3fba64ac7b4ddf0ea6f2aa587/view)
 
Place of Performance
Address: West Haven VAMC 950 Campbell Ave, West Haven 06516-2770
Zip Code: 06516-2770
 
Record
SN06179090-F 20211119/211117230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.