Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 20, 2021 SAM #7294
MODIFICATION

Z -- Project # 583-21-513 - Replace Pipe Insulation

Notice Date
11/18/2021 12:44:38 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
250-NETWORK CONTRACT OFFICE 10 (36C250) DAYTON OH 45428 USA
 
ZIP Code
45428
 
Solicitation Number
36C25022B0010
 
Response Due
12/22/2021 7:00:00 AM
 
Archive Date
03/22/2022
 
Point of Contact
Luke Turner, Contract Specialist
 
E-Mail Address
luke.turner@va.gov
(luke.turner@va.gov)
 
Awardee
null
 
Description
Description of purpose work nature and volume: Uninsulated diffusers, uninsulated VAV s, and failing duct insulation have created issues in clinical areas throughout the facility with failing ceiling tiles due to excessive condensation. The scope is to replace all steel/aluminum 24 x24 HVAC diffusers with plastic insulated 24 x24 diffusers, replace all steel/aluminum 10 x48 HVAC slot diffusers with 24 x24 plastic insulated diffusers and replace up to 15000 linear feet including VAV s and access panels. The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. The magnitude of construction project is estimated to be between $250,000 and $500,000. Location of the work: All work to be performed, according to the drawings and specifications, at the Cincinnati VA Medical Center, 3200 Vine Street, Cincinnati, Ohio 45220-2637. Tentative dates for issuing invitations, opening bids, and completing contract performance: The Invitation for Bids (IFB) should be posted on/about 11/15/2021 and the Bid Opening should be within 30-45 days thereafter. After award, Contractor will have 154 days from the receipt of Notice to Proceed to complete all work, to include checklist items, controls installation and configuration, testing and balancing, painting, site cleanup and equipment disposal, etc. Plans will be available for inspection without charge: The specification and drawings will be available with the IFB when released. Date by which requests for the invitation for bids should be submitted: There is no need to request anything as the IFB and all associated documents will be posted through GPE. Set-Aside: This solicitation will be set aside for Service-Disabled Veteran-Owned Small Business concerns. Amount to be charged for solicitation documents: Not Applicable.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/49664698adc94cd3b3eebc9756f9cc56/view)
 
Record
SN06180000-F 20211120/211118230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.