Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 20, 2021 SAM #7294
SOLICITATION NOTICE

N -- 626-22-1-4123-0124 Parking Access Gate Upgrade

Notice Date
11/18/2021 6:29:16 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238290 — Other Building Equipment Contractors
 
Contracting Office
249-NETWORK CONTRACT OFFICE 9 (36C249) MURFREESBORO TN 37129 USA
 
ZIP Code
37129
 
Solicitation Number
36C24922Q0032
 
Response Due
11/23/2021 6:00:00 AM
 
Archive Date
03/02/2022
 
Point of Contact
Ayslin Kennett, Contract Specialist, Phone: 615-225-6772
 
E-Mail Address
Ayslin.Kennett@va.gov
(Ayslin.Kennett@va.gov)
 
Awardee
null
 
Description
Upgrade 11 Parking gates remove existing controllers and replace with new Parking Pro-M gates and controllers? There are no gates made by magnetic by that name, can you confirm model number please? We currently have 3M gates and they are outdated and can no longer get parts for them. We are looking at Parking Pro-M gates from Magnetic Autocontrol. Not sure what the model number is but the web site is www.ac-magnetic.com/usa then look at Parking Pro. Are the arms for operators straight arms or articulated for low height use? We currently have 3M gates and they are outdated and can no longer get parts for them. We are looking at Parking Pro-M gates from Magnetic Autocontrol. Not sure what the model number is but the web site is www.ac-magnetic.com/usa then look at Parking Pro. What length or arms are you looking for 10 12 ? 10 Straight Do you have any pictures of existing gate operators and locations? No I am hoping to find out if there is an incumbent contractor currently performing these services, if similar services have been performed in the past, or if this is a new requirement. If this is a follow-on requirement, could you please provide the previous contract or task order number? We currently have 3M gates and they are outdated and can no longer get parts for them. We are looking at Parking Pro-M gates from Magnetic Autocontrol. Not sure what the model number is but the web site is www.ac-magnetic.com/usa then look at Parking Pro. Does the government have pictures and model information available to send contractor for the existing gates? No Are Pro-M Gates the only approved solution or would a comparable product from another manufacturer be approved? No Is the contractor reconnecting existing card access controls or remote gate releases or installing new? Connect existing Card access Are there any milestones, important dates, or time constraints? No What are some potential obstacles that could arise and cause delays for the contractor? None Is the contractor required to check in with site representative daily, upon arrival and exiting job site? Yes Should changes in agreed upon design occur during project, how should the contractor address those with the client? Yes, email Contracting Officer Is there a COVID-19 protocol that the contractor should be aware of? Yes, checking in with COVID reps. Will the contractor and team be required to take a COVID-19 test daily or weekly? Will have to ask COVID reps. Will the contractor be given authorization to store materials onsite? Yes In order to give you an accurate estimate, we need access to the property. Please advise if you are going to have a scheduled site visit or who to contact at the facility in order to make arrangements for an inspection by our team. We would like to accomplish the visit this week because of the tight RFI and due dates? Please accept my invitation to stop by and look at the site anytime. Just give me a call when you arrive. My phone number is 615-968-9558. Thanks  Are there parking lot drawings that are available? No there are no drawings of the gate but if they want to stop by that is fine. There appear to be 13 total electric traffic arms at the Nashville VAMC campus. Please clarify which 11 systems in Section B.1 should be replaced through this solicitation, or if all 13 should be replaced. All 13 Are the electric and signal pathways and wires to all traffic arms still intact? Should contractors assume reuse of existing wire in their bids? Yes, Yes   There appear to be 2 access control system circuit boards in many of the current traffic arm enclosures.  Will the offeror be responsible for removing and reinstalling existing access control equipment to the new traffic arm controllers and integrating it with the new traffic arms? No, using existing wires What is the desired traffic arm length? Are all traffic arms the same length? 10 Straight   We understand that the West Security Booth traffic arms both have 2 loops (2 per arm) that need to be replaced, to include bringing new lead wire to the traffic arm.  Please confirm that the contractor is not responsible for the replacement of any other roadway loops. true What response time is desired for technical support (Paragraph B1.3)? Is on-site presence required to meet this requirement? One year and possible extension Please confirm that all traffic arms are controlled by access control devices (card swipe and/ or keypads) at each location, and that this equipment must be integrated with the new traffic arms. Yes Please confirm that all traffic arms are centrally controlled from a remote panel that will not be replaced but must be integrated with the new traffic arms. Yes Please confirm that the 2 traffic arms near the intersection of Highland Ave and 24th Ave S require new fiber optic cable installed for communications since the existing CAT5 cable is too long to provide reliable communication along with the appropriate media converters at the traffic arms and the central control station. Yes Is on-site material storage available for contractors? Yes Are LED lighting strips required for the traffic arms? No Is a specific color or paint scheme required for the arms or the base units (operators)? No Does each traffic arm need to provide a position signal to the central remote-control panel for both the up and down position, or is just reporting whether it is down or not sufficient? Just when arms are up or down Do you want the card readers and intercoms replaced also? Just replace controller
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b102867afeea4a37b470211e437b4162/view)
 
Record
SN06180216-F 20211120/211118230123 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.