SOLICITATION NOTICE
99 -- COMPRESSOR UNIT,CEN
- Notice Date
- 11/22/2021 8:15:32 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010422RFA65
- Response Due
- 12/6/2021 12:00:00 AM
- Archive Date
- 12/21/2021
- Point of Contact
- Telephone: 7176054056
- E-Mail Address
-
TAMMY.LITTLE@NAVY.MIL
(TAMMY.LITTLE@NAVY.MIL)
- Description
- ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|2|270|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source|TBD|N00104|TBD|Certifications - N45404 Material - S0507A|Certifications - N45404 M aterial - TBD|TBD|N/A|N/A|N/A|Certifications - N45404|N/A|N/A|See DD form 1423|port_ptnh_wawf_notification@navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|If Applicable || INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|1 Year after contract completion |1 Year after completion of contract||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2021)|4|if applicable |||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (JUN 2020))|7|||||||| LIST OF AWARD ATTACHMENTS|5|||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (SEP 2021)|13|333914|1250|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| 1. This is an Advanced Equipment Repair Program (AERP) requirement. 2. This is a sole-source (3R) requirement to Curtiss-Wright Electro-MechanicalCorp. (CAGE 830R7). The Government does not own the data or the rights to thedata needed to purchase this part from additional sources. It has beendetermined to be uneconomical to buy the data or the rights to the data. It isuneconomical to reverse engineer the part. 3. Proposal is to be submitted as an Estimated, Not-To-Exceed Price for thefull repair effort of the requirement. Vendor will have 120 days to complete ateardown and evaluation of the carcasses and submit a Repair Report andFirm-Fixed Price Proposal. 4. When submitting a proposal, make sure you specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations,Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes orrequests for changes after award will have consideration costs deducted fromunit price. 5. Include in Estimated/Not-To-Exceed Repair Price all costs associated withreceipt and complete repair of material that may be in unwhole condition,missing hardware, damaged, handling damage, missing parts, wear damage, andCAV reporting. Also, please provide the following: a. Teardown and Evaluation rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: - PRICE REDUCTIONS Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. This adjustment will be implemented via aReduction Modification at the end of contract performance. Price reductionsmade pursuant to this section shall not limit other remedies available to theGovernment for failure to meet required RTATs, including but not limited tothe Government's rights to terminate for default. - RECONCILIATION A reconciliation modification will be issued after final inspection and acceptance of all assets included under this contract. The parties have agreedto a price (shown on the schedule page) for each unit at the negotiated RTAT.Such prices are based on the Contractor meeting the RTAT requirementsdescribed within the schedule page. If the Contractor does not meet theapplicable RTAT requirement, the price adjustment as stated shall be applicable. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 6. All transportation to/from repair site shall be paid for by the US navy. 7. All contractual documents (i.e. contracts, purchase orders, delivery order,and modifications) related to the instant procurement are considered to be'issued' by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce method such asemail. The Government's acceptance of the contractor's proposal constitutesbilateral agreement to 'issue' contractual documents as detailed herein. 8. If supplies will be packaged at a location different from the Offeror address, the Offeror will provide the Name, Street Address, and CAGE of thePackaging Facility. 9. If you are not the manufacturer of the material called out in the requirement, the actual manufacturer must be stated (Name and CAGE) and be able to provide traceability documentation if requested. Examples oftraceability documentation include but are not limited to the following: - Purchase order/Invoice between you and the manufacturer identifying thepart number, revision level and quantities - Manufacturer's packing slip or certification identifying the part number,revision level and quantities 10. This requirement utilizes Government Furnished Property (GFP). Any GFP located at the vendor's facility in storage that can be used for the repair ofthe requirement shall be utilized and called out within the proposal. 11. Offerors must have a valid U.S. security clearance of CONFIDENTIAL or higher in order to respond to this RFP N00104-22-R-FA65, because RFPN0010422RFA65 includes and annex (information) classified at the CONFIDENTIAL level which will be released only to the offerors possessing the appropriateclearance. All classified material must be handled in accordance with theNational Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M)and Industrial Security Regulation (DoD 5220.22-R). 12. This requirement will be contracted under Basic Ordering Agreement (BOA)N00104-18-G-BH01. 13. The final delivery date for this requirement shall be on or before 9 November 2023. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the COMPRESSOR UNIT,CEN . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;42280; , drawing ;15-0181; ,and the applicable SUBMEPP Repair Instruction ;RI 5300-012-0715 REV D Chg-3 (CSD0281); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD281; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/b738239bc3b14d2cb3d812f52acc53bd/view)
- Record
- SN06183531-F 20211124/211122230120 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |