SOURCES SOUGHT

Z -- Z--GCD- LEFT & RIGHT PP TRANSFORMER REPL.

Notice Date
11/23/2021 10:24:51 AM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
PACIFIC NW REGION PN 6615 BOISE ID 83706 USA
 
ZIP Code
83706
 
Solicitation Number
140R1022R0003
 
Response Due
12/30/2021 2:00:00 PM
 
Archive Date
11/22/2022
 
Point of Contact
Dyer, Rachel, Phone: 2083785110, Fax: 208-378-5080
 
E-Mail Address
RDyer@usbr.gov
(RDyer@usbr.gov)
 
Description
SOURCES SOUGHT NOTICE THIS IS NOT A REQUEST FOR QUOTE (RFQ) INVITATION FOR BID (IFB) OR REQUEST FOR PROPOSAL (RFP) Purpose of Notice: To obtain a source list of interested/capable contractors to aid in market research, establishment of a method of procurement, basis for award, and or other procurement information useful to the Government�s requirement. Project Title: Grand Coulee Dam Left and Right Powerplants Transformer Replacements, Columbia Basin Project, Washington Work is located at the left and right powerplants at Grand Coulee Dam, adjacent to the Cities of Grand Coulee and Coulee Dam, Washington, approximately 90 miles west of Spokane, Washington, in Grant and Okanogan Counties. The Bureau of Reclamation (Reclamation) is conducting market research for the left and right transformer replacement, Columbia Basin Project. The left and right powerplants consist of 24 hydroelectric power generation units. Principle components of the work consist of removing and disposing existing power transformers as well as furnishing and installing replacement power transformers. Estimated period of performance: July 1, 2022 � June 30, 2027 Estimated Order of Magnitude: Between $25,000,000 and $50,000,000 Estimated NAICS: 237990 Other Heavy and Civil Engineering Construction Size Standard: $39.5 Million Estimated Contract Type: Firm Fixed Price (FFP) Construction/Supply Hybrid, Indefinite Delivery Indefinite Quantity (IDIQ) Estimated Principal Components of work to be performed includes the following: Removing and disposing in service generator step-up power transformers Furnishing and installing in service generator step-up power transformers Removing and disposing spare generator step-up power transformers. Furnishing and installing spare generator step-up power transformers. Furnishing and installing new anchorage systems for the transformers ordered. Modifying the fire protection system for the transformers ordered. Making isolated phase bus modifications for final connections to the transformers ordered. The intent of this notice is to identify potential interested offerors for the Left and Right powerplants transformer replacement, Columbia Basin Project. Reclamation is seeking qualified, experienced firm capable of providing the labor, equipment, and materials necessary to accomplish the Principal Components of Work identified above and as identified within the project specifications and drawings (specifications and drawings are not available at this time). Interested offerors are invited to submit the following information: Statement of interest as a prime and/or subcontractor Construction bonding level, aggregate and per contract Point of contact information Size status and/or SBA certification program for NAICS 237990 Other Heavy and Civil Engineering Construction Firm�s capability to successfully manage complex requirements Recent projects similar in size, scope, and or magnitude Responses to this Sources Sought are due No Later Than December 30, 2021. This market research is for informational purposes only. This announcement does not constitute a commitment, implied or otherwise, that a procurement action will be issued, and shall not be construed as a Request for Quote, Request for Proposal, or Invitation for Bid, or as an obligation on the part of the Government. No entitlement to payment will arise as a result of the submission of contractor information. Any questions regarding this announcement should be sent to Rachel Dyer at rdyer@usbr.gov. Phone calls or facsimile Requests for Information (RFI) will not be accepted
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/17136dab998643a5b9fb73eab85ff952/view)
 
Record
SN06184643-F 20211125/211123230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.