SOLICITATION NOTICE
Z -- US Forest Service_ Delta National Forest 717 Culvert Replacement
- Notice Date
- 11/30/2021 11:36:33 AM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- USDA-FS, CSA EAST 11 Atlanta GA 303092449 USA
- ZIP Code
- 303092449
- Solicitation Number
- 12445122Q0001
- Response Due
- 12/8/2021 10:00:00 AM
- Archive Date
- 12/23/2021
- Point of Contact
- Cynthia Granderson, Phone: 6019651619, RIchard Huffman, Phone: 5013215324
- E-Mail Address
-
cynthia.granderson@udsa.gov, richard.huffman@usda.gov
(cynthia.granderson@udsa.gov, richard.huffman@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Amendment 00002: Extension of quote submittal deadline to 12/08/2021, 1300hrs EST; pending further technical clarifications. Amendment 00001: correction to the Notice to� Bidders, page 38 of� 12445122Q0001 Package.� Sum of changes: - No public opening - POC for quote submittal: Richard.huffman@usda.gov with cc: Cynthia.Granderson@usda.gov - Time and date for quote submittals is unchanged. This Request for Quote (RFQ) is issued pursuant to FAR 13 �by the United States Department of Agriculture (USDA), Forest Service� (FS), on behalf of the Delta National Forest, Holly Bluff, Mississippi. (Sharkey County 39088). Type of Contract: This is an Invitation for Bid (IFB) which will result in award of a firm-fixed price contract.� Award will be made to the lowest priced responsive/responsible bidder.� Set Aside: The project is set-aside 100% for small businesses. The associated NAICS of this acquisition is 237310 - Highway, Street, and Bridge Construction. PSC Code Z2LB �- Repair or Alteration of Highways, Roads, Streets, Bridges, and Railways Magnitude: In accordance with FAR 36.204, the magnitude of this project is: magnitude of this project is: (c) Between $100,000 and $250,000 Location: Project Name and Location: Project Name and Location: The project location is 2.5 miles west of Holly Bluff, Mississippi. (Sharkey County 39088). 32.831348, -90.759575 ; https://www.google.com/maps/place/32%C2%B049'52.9%22N+90%C2%B045'34.5%22W/@32.831353,-90.7596206,100m/data=!3m1!1e3!4m14!1m7!3m6!1s0x8629717108f29ed3:0x75fdce7b9952b10e!2sHolly+Bluff,+MS+39088!3b1!8m2!3d32.8211746!4d-90.7083136!3m5!1s0x0:0x0!7e2!8m2!3d32.8313479!4d-90.7595746?hl=en Scope of Work: The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and supervision required to complete the work per the plans, specifications, and terms of the contract.� See the SOW for specific details not included under this paragraph This project will replace two 60� x 40� corrugated metal pipe culverts with two 60� x 68� 16 gage polymer coated corrugated metal pipe culverts on Road 717 on the Delta National Forest. Road 717, an aggregate surfaced road, is located on the county line between Sharkey and Yazoo Counties, Mississippi. Four culverts in the roadside ditches will be replaced to provide access to the adjacent land. The basins at each end of the 60� culverts will be armored with riprap and new 30� X 50� roadside ditch culverts will be installed to empty into those basins. The project location is 2.5 miles west of Holly Bluff, Mississippi. Remove the existing culverts and properly dispose of them off national forest property. Remove the existing gate and posts to the northwest of the culverts, taking care not to damage them, and place them in the adjacent wooded area outside the construction limits. Install the 60� culverts at the same alignment as the existing culverts (about a 6� left forward skew looking north), with invert elevations as shown on the plans. Install the 30� roadside ditch culverts as shown in the plans. Supplement the suitable excavated material with select borrow as needed and backfill the culverts as shown on the plans. Armor the inlet and outlet basins as shown in the plans with 200 lb. riprap over geotextile filter fabric. Any excavated material not suited for backfill is to be properly disposed of off national forest property. Place a 6� compacted layer of #610 (crusher run) crushed limestone aggregate over the excavated area of the roadbed to a width of 16�. Grade the edges to pull all aggregate back into the travel way and leave a straight, uniform edge, and grade the aggregate to create a smooth, uniform surface and compact. There will be no surfacing over the 30� culverts. On all disturbed areas, spread Bahia grass seed at the rate of 20 pounds per acre, 13-13-13 fertilizer at 500 pounds per acre, and straw mulch at 3,200 pounds per acre. No tackifier is required on the mulch. If seeding is done from September 15 to March 15, in addition to the above spread rye grass seed at the rate of 80 pounds per acre. Applicable specifications may be found in FHWA�s FP-14 and the attached supplemental specifications. Benchmark: N.I.B. 8� Red Oak tree, 105� NW of the intersection of the CL of the road and CL of the existing culverts. Elevation = 89.56�. Dates: �� Issuance of the Request for Quotation (RFQ) �������������� ����������� 11/01/2021; Site(s) Visit/Pre-Bid Conf (if needed)���������� NA������������������������������ Date for Questions��������������������������������� 11/23/2021; Bid Submittal Deadline ��������������������������� 12/01/2021 / 0800 ET Award Date������������������������������������������ 12/06/2021 Completion Date 90 Days after NTP Solicitation and Documents: The solicitation and related documents will be available for download at http://beta.sam.gov �on or about 11-01-2021. No hard copies of the solicitation will be mailed out
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/aa24837a9bc646ccbbe25dc1516f6ae3/view)
- Place of Performance
- Address: Holly Bluff, MS 39088, USA
- Zip Code: 39088
- Country: USA
- Zip Code: 39088
- Record
- SN06187650-F 20211202/211130230129 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |