MODIFICATION
Y -- FY19 P-9030/PAF19030 APSI-CARGO PAD W/TAXIWAY EXT, FY19 P-9040/PAF189040 APSI-MAINT SUPPORT FACILITY, FY20 P-9010/PAF189010 APSI-FUEL TANKS W/RECEIPT PIPELINE & HYDRANT SYSTEM & FY20 P-9021/PAF189021 APSI- AIRFIELD DEV-ROADS TINIAN INTL AIRPORT CNMI
- Notice Date
- 12/7/2021 7:18:07 PM
- Notice Type
- Solicitation
- NAICS
- 237120
— Oil and Gas Pipeline and Related Structures Construction
- Contracting Office
- NAVAL FAC ENGINEEERING CMD PACIFIC JBPHH HI 96860-3134 USA
- ZIP Code
- 96860-3134
- Solicitation Number
- N6274222R1306
- Response Due
- 4/12/2022 5:00:00 PM
- Archive Date
- 04/27/2022
- Point of Contact
- Leslie Takayama
- E-Mail Address
-
leslie.m.takayama.civ@us.navy.mil
(leslie.m.takayama.civ@us.navy.mil)
- Description
- This project is for construction of: P-9030 Cargo Pad with Taxiway Extension, Tinian International�Airport, Tinian, CNMI is for the construction of a Cargo Pad using Portland�Cement Concrete (PCC) including taxiway connections to the airfield�runway and other taxiways, NAVAIDS (e.g., lighting and markings),�water/electrical utilities, cargo staging area with biosecurity control, and all�necessary supporting facilities for a complete and usable facility. The�facility must comply Seismic Zone 3 design criteria. Facilities will be�designed as permanent construction in accordance with the DoD Unified�Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This�project will comply with DoD antiterrorism/force protection requirements�per UFC 4-010-01. P-9010 Fuel Tanks with Receipt Pipeline & Hydrant System, Tinian�International Airport, Tinian, CNMI is for the construction of a jet fuel�system including harbor fuel receipt, pipeline, fuel storage, and high flow�rate fuel delivery to parking apron hydrants as well as to truck stands. Fuel�storage tanks include one 100K barrel (BBL) aboveground storage tank�(AST) and two 60K BBL ASTs. The system will include carbon steel�pipelines, additization station, seaport pump station, operational pump�station at airport, truck fill stands, fire protection, spill control facility,�emergency generators, and parking for fuel related vehicles. P-9021 Airfield Development Phase I Roads, Tinian International�Airport, Tinian, CNMI is for the repair/improvement of the haul route from�the seaport to the airfield. P-9040 Maintenance Support Facility, Tinian International Airport,�Tinian, CNMI is a pre-priced option for the construction of a maintenance�support facility with a slab on grade foundation, cast in place, tilt up or precast�concrete walls with typhoon shutters and a cast in place or pre-cast�concrete roof. The facility must be able to withstand 190 mile per hour�winds for structural elements and Seismic Zone 3 design criteria. The�project includes site improvements, pavements, utilities, environmental�remediation, archeological monitoring, and explosive safety monitoring as�well as all other supporting work necessary for a complete and usable facility. In accordance with FAR 52.217-7 Option for Increased Quantity-�Separately Price Line Item, the Government may exercise the option by�written notice to the Contractor within 365 calendar days of contract�award. Three (3) pre-priced planned modifications will also be included, for�Munitions and Explosives of Concern (MEC) / Material Potentially�Presenting an Explosive Hazard (MPPEH) for projects P-9030, P-9010 and P-�9021.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/f2a2b1375e764bc9838c644cc81808dc/view)
- Record
- SN06192392-F 20211209/211207230105 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |