SOLICITATION NOTICE
J -- CGC PENOBSCOT BAY Calibration Services Of Panel Meters
- Notice Date
- 1/3/2022 10:27:52 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
- ZIP Code
- 94501
- Solicitation Number
- 70Z08522QIBC40900
- Response Due
- 1/8/2022 5:00:00 AM
- Archive Date
- 01/23/2022
- Point of Contact
- Anthony J. Andaluz, William A. M. Sword
- E-Mail Address
-
anthony.j.andaluz@uscg.mil, william.a.swordjr@uscg.mil
(anthony.j.andaluz@uscg.mil, william.a.swordjr@uscg.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. Past performance will be considered in the selection of the awarded vendor. SEE ATTACHED SCOPE OF WORK FOR FULL DETAILS: POP:�17-30 Jan 2022 or 21-27 Feb 2022 3.1� General.� The Contractor shall provide skilled technicians, portable instrument standards and all necessary equipment to calibrate all meters and gauges identified in the work item.� The Contractor may remove the meters and gauges from the vessel to a shoreside calibration facility.� If this is done the Contractor shall exercise extreme care in transporting and reinstalling the meters and gauges to ensure they remain in calibration. 3.2� Electrical wiring.� Electrical wiring temporarily removed to facilitate calibration shall be isolated and secured to eliminate shock hazard to personnel.� Wiring removed from ammeters, KW meters or power factor meters fed from current transformers shall be shorted together to eliminate shock hazards. 3.2.1� Prior to disconnecting meter wiring leads, record and retain the connection information for use in later reconnection.� Disconnected meter leads powered by current transformers (ammeter, wattmeter, power factor meter, etc.) shall be temporarily joined together or connected to a bypass meter(s) to maintain continuity of the current loop.� Meter lead bare conductors shall be insulated when not connected to the meter.� Any removed meter mounting hardware shall be retained for later reinstallation. 3.2.2� Provide all necessary lighting during the accomplishment of this work.� Provide and install a temporary Ammeter to monitor the shore power while the normal Ammeter is removed for calibration. 3.3� Electric Meter Calibration. 3.3.1� Disconnect and remove each meter listed in the Table 1. 3.3.2� Record wiring data and retain mounting hardware. 3.3.3� Inspect lead wires and insulation, broken or partially broken lead wires shall be cut back to remove damaged portion of wires and install new terminal end to the wire. 3.3.4� Remove existing illegible wire marker and install new wire markers.� Install new wire markers where missing.� New wire markers shall be white marked with indelible ink. 3.3.5� Disassemble and clean meter to remove loose paint and foreign matter. 3.3.6� Remove existing meter and install new components where missing or defective. 3.3.7� Free-up and adjust moving parts. 3.3.8� Restore electric meter case to original condition. 3.3.9� Install new seals/gasket conforming to manufacture�s specification. 3.3.10� Calibrate and adjust each meter including associated accessories to manufacture�s specification using appropriate calibration procedure and test equipment.� Calibration laboratories shall be accredited by Commercial Accreditation or Certified in accordance with the ANSI/NCSL Z540.3. 3.3.11� Re-install each meter after calibration and connect each meter including associated accessories and mounting hardware. 3.3.12� Remove previous calibration labels.� Affix a new calibration label to each meter showing date of calibration, due date for next calibration and name of the calibration activity or company.� The label shall be placed on exterior (front or back) of the meter so that it is clearly visible without interfering with meter readings.� Place transparent tape over any paper labels. 3.4� Option for renewal or repair.� Within 24 hours of testing, the Contractor shall notify the COTR of all gauges and meters which did not pass calibration.� If a change request has been released and authorized by the KO, the Contractor shall renew or repair the failed gauge(s) and meter(s). INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO ANTHONY.J.ANDALUZ@USCG.MIL COST BREAKDOWN OF QUOTE INCLUDING BUT NOT LIMITED TO LABOR COST PER HOUR AND MATERIALS IS REQUIRED.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/274296d8b4d2476f87409ddf86ea859c/view)
- Place of Performance
- Address: Bayonne, NJ 07002, USA
- Zip Code: 07002
- Country: USA
- Zip Code: 07002
- Record
- SN06207603-F 20220105/220104201320 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |