Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 13, 2022 SAM #7348
SPECIAL NOTICE

Z -- Advanced Notice- Maintenance Dredging of New York and New Jersey Harbor � Kill Van Kull Federal Navigation Project

Notice Date
1/11/2022 9:39:22 AM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS22B0004
 
Response Due
1/26/2022 1:00:00 PM
 
Point of Contact
sandra schenning, Phone: 9177908177, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
sandra.l.schenning@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil
(sandra.l.schenning@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil)
 
Description
Synopsis of Proposed Dredging - Maintenance Dredging of New York and New Jersey Harbor � Kill Van Kull Federal Navigation Project. Background Information The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York and New Jersey Harbor � Kill Van Kull Federal Navigation Project to a depth of -50 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable over-depth. The proposed maintenance dredging would remove approximately 280,000 cubic yards (CY) of critical shoals from the Kill Van Kull Channel with subsequent placement at the Historic Area Remediation Site (HARS). The dredged material from Kill Van Kull Channel is expected to consist of 0.0% gravel, 26.7% sand, 52.6% silt, and 20.7% clay. Due to restrictions in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed utilizing a mechanical dredge with a closed clamshell environmental bucket. Additionally, multiple scows and tugboats will be needed to perform the work during the dredging, and placement operations. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of material. The presence of dredging equipment in the channel will impact vessel traffic and it is necessary to maintain this production rate while minimizing the duration of this impact. Liquidated damages of $2,350.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. The proposed work is anticipated to take place between June and November 2022. The work is estimated to cost between than $1,000,000 and $5,000,000.00. This is an unrestricted procurement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/69fbd2ecf50042c1a615d04d8e0e1c04/view)
 
Place of Performance
Address: Staten Island, NY 10301, USA
Zip Code: 10301
Country: USA
 
Record
SN06214172-F 20220113/220111230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.