Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 20, 2022 SAM #7355
SOLICITATION NOTICE

Y -- F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB

Notice Date
1/18/2022 12:55:02 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
 
ZIP Code
23510-1096
 
Solicitation Number
W9123621R2003
 
Response Due
1/21/2022 11:00:00 AM
 
Archive Date
02/05/2022
 
Point of Contact
Axel F. Doody, Phone: 7572017712, Katya Oxley, Phone: 7572017026
 
E-Mail Address
axel.f.doody@usace.army.mil, ekaterina.oxley@usace.army.mil
(axel.f.doody@usace.army.mil, ekaterina.oxley@usace.army.mil)
 
Description
ONLY THOSE OFFERORS THAT SUBMITTED PROPOSAL RESPONSES TO FACTORS 1 AND 2 BY THE ORIGINAL RESPONSE DATE, ARE ALLOWED TO SUBMIT PROPOSALS FOR FACTORS 3 AND 4. REFER TO THE SOLICITATION AS AMENDED FOR FURTHER DETAILS. 1/18/2022 Amendment 0014 is issued to extend the closing date to 21 January 2022 and to include the new wage determination. 01/12/2021 Amendment 0013 is issued to provide the following: 1) correction to the spec section 01 35 26; 2) Update Wage Determination. REFER TO ATTACHED SF30 for additional details. This is a the final amendment. 01/07/2021 Amendment 0012 is issued to provide the following: 1) extend prposal due date to 19 Jan 2022; 2) estimates for Dominion Virginia Power; 3) Delete a spec section 00 22 13.00 20, 4) revised Attachment 8 - CLIN Schedule; 5) Update solicitation CLINs to allign with Attachment 8; 6) Provide a response to an inquiry received; 7) Updates to clauses 52.217-7, 52.211-10 and 252.236-7001. REFER TO ATTACHED SF30 for additional details. 12/22/2021: Amendmnet 0011 is issued to provide the following: 1) technical changes to the drawings and specifications; 2) incorporate projnet responses into the solicitation. Refer to SF30 and accomponying attachments for further details. 12/17/2021 Amendment 0010 is issued to provide the following: 1. Changes to drawings and specifications (Refer to Continuation page and attachments) 2. Wage Determination updated on 12 November 2021 (refer to continuation pages) 3. Provide Construction Security Plan (Refer to Attachment 16) 4. Provide Installation Restoration Program Background check document (Refer to Attachment 17) 5. Update Contract Specialist information 6. Proposal response date for Factors 3 and 4 Refer to SF30 and accomponaying attachmnents. Due date for responses to Factors 3 and 4 remains Jan 12, 2021 at 1400 EST.� 12/13/2021 - Amendment 0009 -�The purpose of this amendment is to: 1. �Extend the period of proposal acceptance for Factors 1 and 2. 2. �Remove DFARS Clause 252.233-7999, Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) 12/06/2021 - Amendment 0008 to provide the following: 1. Change the submission approach to a bifurcated approach. Only Factors 1 and 2 are requested at this time. 2. Extend acceptance of Pre-Proposal Inquiries (PPIs). 11/24/2021 - Amendment 0007 -�The purpose of Amendment 0007 is issued to provide the following:� 1. To amend the source selection procedures and remove Factor 3, Schedule, in its entirety.� 2. To provide changes to the technical documents.� 3. To provide revised drawings and specifications.� 4. To extend the solicitation response date. 11/9/2021� upload Amendment 0006.� �To update specification Section 08 71 00 (see attachment 7 and the continuation sheet of the amendment) 10/26/2021 - Site Visit Sign-In Log Added to Attachments. 10/19/2021 Amendment 0005:� The purpose of this amendment is to: 1. To provide RTA drawings and specifications; 2. Incorporate additional contract clauses 252.204-7000 and 252.211-7003. ***RTA Drawings and specifications are uploaded as of 10/19/2021, a revised SF30 is pending due to system issues and will be posted once available. Original Attachments: Attachment 10 - COMH - Final Design Drawings Part 1 of 3.pdf Attachment 11 - COMH - Final Design Drawings Part 2 of 3.pdf Attachment 12 - COMH - Final Design Drawings Part 3 of 3.pdf Attachment 13 - COMH Final Design Specifications Part 1 of 1.pdf Replaced with: Attachment 10 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21.pdf, dated 03/07/2021, 157 pages� Attachment 11 - COMH_RTA_Design Drawings_Part 1 of 3_17MAR21, dated 03/07/2021, 161 pages� Attachment 12 - COMH_RTA_Design Drawings_Part 3 of 3_17MAR21.pdf, dated 03/07/2021, 225 pages� Attachment 13 - COMH_RTA_Specifications part 1 of 1_17MAR21, dated 03/07/2021, 2924 pages� Attachment 14 - COMH - RTA FFE_17MAR21.pdf, dated 03/07/2021, 58 pages� Attachment 15 - COMH - RTA SID_17MAR21, dated 03/07/2021, 32 pages Amendment 0004 -�The purpose of this amendment is to: 1. To update selection recency element under Factor 1; 2. Incorporate 252.233-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) Amendment 0003. USACE has received authority to continue with the acquisition of this construction project. Due to the programmatic pause, this amendment permits new offerors to submit proposals in order to reasonably promote competition.� All offerors, including those that submitted proposals in response to the initial solicitation, are afforded equal consideration throughout the source selection process. The purpose of this amendment is to provide the following: (See Continuation Page for Details) 1. To establish a new proposal due date;� 2. Extend the proposal validity for additional 180 days;� 3. Permit potential offerors who did not respond initially to submit a proposal in response to all factors; 4. Require the submission of all 5 factors. 5. Afford an opportunity for offerors to revise their proposal submission for Factors 1 and 2; 6. Afford an opportunity for offerors to withdraw their proposals;� 7. Provide proposal due date; 8. To update selection recency element under Factor 1 and 2; 9. To update wage determination; 10. Provide intent to include sole source items; 11. Provide update on door hardware schedule; 12. Provide site visit information. Amendment 0002 - �Extends the period for acceptance of proposals for Technical Factors 1 and 2. - Amendment provided in posting Attachments.� No other changes. Amendment 0001 - Provides responses to ProjNET questions - Amendment provided in posting Attachments.� No other changes. This is the solicitation for F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB, W9123621R2003. Provide a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base. Construction includes compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house hangar bays, staff administration, propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms/showers/lockers, and building systems support. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. The project will demolish Facility 753 (7,400 Square Meters). Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum antiterrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 150 Tons The project duration is 700 calendar days from the notice to proceed, unless CLIN 0013 is exercised in which case the contract completion date will become 565 calendar days from notice to proceed. Refer to the solicitation document for further details.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/3769cff8c4b64eb0b2f788882dac895d/view)
 
Place of Performance
Address: Langley AFB, VA 23665, USA
Zip Code: 23665
Country: USA
 
Record
SN06219073-F 20220120/220118230104 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.