Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 20, 2022 SAM #7355
SOLICITATION NOTICE

43 -- 43--COMPRESSOR UNIT,REC, IN REPAIR/MODIFICATION OF

Notice Date
1/18/2022 9:11:43 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010422RFA67
 
Response Due
2/24/2022 9:00:00 PM
 
Archive Date
03/12/2022
 
Point of Contact
Telephone: 7176052982
 
E-Mail Address
BRITTANY.A.LANGLETZ@NAVY.MIL
(BRITTANY.A.LANGLETZ@NAVY.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|1|400|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source|TBD|N00104|TBD|Certifications - N45404 Material - S0507A|Certifications - N45404 M aterial - TBD|TBD|N/A|N/A|N/A|Certifications - N45404|||See form DD1423|| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|N/A| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (NOV 2021)|4||||| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (SEP 1999))|9|||||||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7|||||||| LIST OF AWARD ATTACHMENTS|5||||x|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2021)|13|333914|750|||||||||||| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1|| TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JUN 2019))|1|| The purpose of this amendment is to extend the offer period to 25 FEB 2022. The purpose of this amendment is to extend the solicitation period to 24 JAN 22.POC is brittany.a.langletz.civ@us.navy.mil. 1. This is an Advanced Equipment Repair Program (AERP) requirement. 2. This is a sole-source (3R) requirement to Curtiss-Wright Electro-MechanicalCorp. (CAGE 0UBG9). The Government does not own the data or the rights to thedata needed to purchase this part from additional sources. It has beendetermined to be uneconomical to buy the data or the rights to the data. It isuneconomical to reverse engineer the part. 3. Proposal is to be submitted as an Estimated, Not-To-Exceed Price for the full repair effort of the requirement. Vendor will have 120 days to complete ateardown and evaluation of the carcasses and submit a Repair Report andFirm-Fixed Price Proposal. A Firm Fixed price would be acceptable. 4. When submitting a proposal, make sure you specify any exceptions, i.e. MIL-STD packaging, MIL-STD Labeling, Inspection and Acceptance Locations,Packaging Houses, Surplus Material, etc. If no exceptions are indicated or received, award will be based upon solicitation requirements. Changes orrequests for changes after award will have consideration costs deducted fromunit price. 5. Include in Estimated/Not-To-Exceed Repair Price all costs associated withreceipt and complete repair of material that may be in unwhole condition,missing hardware, damaged, handling damage, missing parts, wear damage, andCAV reporting. Also, please provide the following: a. Teardown and Evaluation rate: b. RTAT: c. Throughput Constraint: d. Induction Expiration Date: - PRICE REDUCTIONS Any assets for which the contractor does not meet the required RTAT will incura price reduction of XXXX per unit. This adjustment will be implemented via aReduction Modification at the end of contract performance. Price reductionsmade pursuant to this section shall not limit other remedies available to theGovernment for failure to meet required RTATs, including but not limited tothe Government's rights to terminate for default. - RECONCILIATION A reconciliation modification will be issued after final inspection and acceptance of all assets included under this contract. The parties have agreedto a price (shown on the schedule page) for each unit at the negotiated RTAT.Such prices are based on the Contractor meeting the RTAT requirementsdescribed within the schedule page. If the Contractor does not meet the applicable RTAT requirement, the price adjustment as stated shall beapplicable. The resultant award of this solicitation will be issuedb bilaterally, requiring the contractor's written acceptance prior to execution. 6. All transportation to/from repair site shall be paid for by the US navy. 7. All contractual documents (i.e. contracts, purchase orders, delivery order,and modifications) related to the instant procurement are considered to be'issued' by the Government when copies are either deposited in the mail,transmitted by facsimile, or sent by other electronic commerce method such asemail. The Government's acceptance of the contractor's proposal constitutesbilateral agreement to 'issue' contractual documents as detailed herein. 8. If supplies will be packaged at a location different from the Offeror address, the Offeror will provide the Name, Street Address, and CAGE of the Packaging Facility. 9. If you are not the manufacturer of the material called out in therequirement, the actual manufacturer must be stated (Name and CAGE) and be able to provide traceability documentation if requested. Examples oftraceability documentation include but are not limited to the following: - Purchase order/Invoice between you and the manufacturer identifying thepart number, revision level and quantities - Manufacturer's packing slip or certification identifying the part number,revision level and quantities 10. This requirement utilizes Government Furnished Property (GFP). Any GFPlocated at the vendor's facility in storage that can be used for the repair ofthe requirement shall be utilized and called out within the proposal. 11. Offerors must have a valid U.S. security clearance of CONFIDENTIAL orhigher in order to respond to this RFP N00104-22-R-FA67, because RFPN0010422RFA67 includes and annex (information) classified at the CONFIDENTIALlevel which will be released only to the offerors possessing the appropriateclearance. All classified material must be handled in accordance with theNational Industrial Security Program Operating Manual (NISPOM) (DoD 5220-22-M)and Industrial Security Regulation (DoD 5220.22-R). 12. This requirement will be contracted under Basic Ordering Agreement (BOA)N00104-17-G-AS01. 13. The final delivery date for this requirement shall be on or before 12 Feb 2023 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the COMPRESSOR UNIT,REC . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;200134AE 93236 D D; 2.1.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;93236; , drawing ;200134AE; ,and the applicable SUBMEPP Repair Instruction ;5130-012-0682 Rev H CHG 2 (CSD278); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD278; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fc144a30231b4276a0ee5fc27a3c9c82/view)
 
Record
SN06219246-F 20220120/220118230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.