Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 21, 2022 SAM #7356
SOLICITATION NOTICE

Y -- CA NP GOGA 469(1) China Beach Access Road

Notice Date
1/19/2022 11:48:15 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000006
 
Archive Date
03/30/2022
 
Point of Contact
Leslie Karsten, Sheri Walsh
 
E-Mail Address
CFLContracts@dot.gov, CflContracts@dot.gov
(CFLContracts@dot.gov, CflContracts@dot.gov)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A HUBZONE SET ASIDE. PROJECT DETAILS: CA NP GOGA 469(1) China Beach Access Road PROJECT DESCRIPTION:� The project scope includes reconstructing the parking lot for the access to China Beach in San Francisco, California.� The project also includes constructing new retaining walls along the trail from the parking lot to Chin Beach, sewer and water utility work, and landscaping.� The project is within lands owned by the National Park Service (Golden Gate National Recreation Area) and the City of San Francisco. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): �1 Acre, Clearing and grubbing 716 Cubic Yards of Roadway Excavation 8,771 Square Feet of Soil nail retaining walls 1,392 Cubic Yards of Roadway Aggregate 230 Tons of Asphalt Concrete Pavement 234 Square Yards of 6� concrete pavement 296 Square Yards of 6� colored concrete pavement 311 Linear Feet of colored concrete curb 1 Domestic and Fire Water System Irrigation system, Lump Sum Sanitary Sewer System, Lump Sum Pump and Sump Pit Sanitary System, Lump Sum 289 Square Yards of colored concrete sidewalk 164 linear feet of fence 1 Gate ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in March, 2022. Construction is anticipated between May, 2022 and May, 2023. ENGINEER�S ESTIMATE:� The proposed project is estimated at a cost between $5 million and $10 million.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a3303ca6f5f343e1aa131b3258c8900b/view)
 
Place of Performance
Address: San Francisco, CA, USA
Country: USA
 
Record
SN06220143-F 20220121/220119230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.