SOLICITATION NOTICE
Y -- NV FLAP US50(1) Round Hill Pines Access
- Notice Date
- 1/19/2022 10:06:19 AM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF22B000005
- Archive Date
- 03/01/2022
- Point of Contact
- Leslie Karsten, Sheri Walsh
- E-Mail Address
-
CflContracts@dot.gov, CflContracts@dot.gov
(CflContracts@dot.gov, CflContracts@dot.gov)
- Description
- THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS FULL AND OPEN COMPETITION WITH HUBZONE PRICE PREFERENCE. PROJECT NUMBER:� NV FLAP US50(1) PROJECT NAME: �Round Hill Pines Access PROJECT DESCRIPTION:� The NV FLAP US50(1), Round Hill Pines Access project is located approximately 0.5 miles south of Zephyr Cove, NV near Lake Tahoe. The project is proposing to widen US 50 and construct a new access road to the Round Hill Pines Beach Resort. The purpose of the project is to increase safety and improve accessibility for visitors entering and exiting the Round Hill Pines Beach Resort from US 50. The current US 50 entrance configuration into the Round Hill Pines Beach Resort has safety concerns due to the limited sight distance for vehicles traveling in both directions along US 50 and unprotected turning movements across US 50 for vehicles accessing the resort. SCOPE OF THE WORK:� The project consists of 0.34 miles of construction on US 50 and 0.13 miles of new entrance to the Round Hill Pines Beach Resort (Round Hill Pines Access Road). US 50 work includes widening to accommodate a median left turn lane and acceleration lane, as well as a mill and overlay of existing US 50. Round Hill Pines Access Road work involves new roadway construction of the access road between the new intersection with US 50 and the Forest Service parking area. Large fills up to approximately 30 feet are anticipated near the intersection of US 50 and the Round Hill Pines Access Road. Other improvements include roadway drainage improvements, signing, and striping. SIGNIFICANT QUANTITIES: 20420-0000 Embankment Construction: 50,400 CUYD 40301-0100 Asphalt Concrete Pavement, Type 1: 2,850 TON 61401-0000 Lean Concrete Backfill: 330 CUYD 63506-0500 Temporary Traffic Control, Flagger: 3,500 HOUR ANTICIPATED SCHEDULE: Advertisement: February 2022 Contract Award: April 2022 Notice to Proceed: April 2022 Construction Complete: October 2022 ENGINEER�S ESTIMATE: The proposed project is estimated at a cost between $1 million and $5 million. MISCELLANEOUS: Tree removals on United States Forest Service land are anticipated to occur prior to start of this project. The contractor will be responsible for disposal of removed trees from the project site. This project will tie into a United States Forest Service project that will be completed prior to start of this project. TRPA grading season for the project area is May 1 � October 15. The contractor will be required to provide a qualified biologist to conduct surveys in the construction limits for active bird nests within 10 days prior to vegetation removal from March 1 � August 31. If active nests are identified, notify the CO and delay vegetation removal.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/aa562cb7e018471da17df133fc98b42d/view)
- Place of Performance
- Address: Zephyr Cove, NV, USA
- Country: USA
- Country: USA
- Record
- SN06220146-F 20220121/220119230106 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |