Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 28, 2022 SAM #7363
SOLICITATION NOTICE

Y -- P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DC

Notice Date
1/26/2022 1:48:26 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NAV FAC ENGINEERING CMD WASHINGTON WASHINGTON NAVY YARD DC 20374-5018 USA
 
ZIP Code
20374-5018
 
Solicitation Number
N4008021R3502
 
Response Due
2/8/2022 11:00:00 AM
 
Archive Date
01/19/2023
 
Point of Contact
Lindsay Brown, Phone: 2026853192, Cornelia Ruffin, Phone: 20206853282
 
E-Mail Address
lindsay.naill@navy.mil, cornelia.ruffin@navy.mil
(lindsay.naill@navy.mil, cornelia.ruffin@navy.mil)
 
Awardee
null
 
Description
P-5001 DBB, JOINT AIR DEFENSE OPERATIONS PHASE II, JOINT BASE ANACOSTIA-BOLLING, WASHINGTON, DCThis acquisition will result in the completion of the Joint Air Defense Operations Center permanent facility by providing the second phase of the Military Construction: Construct a two-story Joint Air Defense Operations Center. Construction includes concrete slab-on-grade foundation with Concrete spread footings under steel columns, structural steel frame, concrete masonry unit shear walls, and roofing system with sloping roof deck. Includes pavements, all utilities, site improvements, passive force protection measures, security fencing, and diverse communication routing to eliminate single points of failure and ensure constant connectivity. Special Construction Requirements include Controlled Space in accordance with Intelligence Community Directive/Intelligence Community Standard 705 and use of special exterior finishes to meet Joint Base Anacostia Bollings architectural design requirements. The facility shall be compatible with applicable Department of Defense, Air Force, and Joint Base design standards. In addition, local materials and construction techniques shall be used where cost effective. Facilities will be designed as permanent construction in accordancewith the Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N4008021R3502' to obtain more details.*
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/42c7dda6d61e44778810c1b794f06a76/view)
 
Record
SN06225236-F 20220128/220126230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.