Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 30, 2022 SAM #7365
SOLICITATION NOTICE

J -- Reverse Osmosis System Upgrade Mayaguez Out Patient Clinic

Notice Date
1/28/2022 11:04:49 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
221310 — Water Supply and Irrigation Systems
 
Contracting Office
248-NETWORK CONTRACT OFFICE 8 (36C248) TAMPA FL 33637 USA
 
ZIP Code
33637
 
Solicitation Number
36C24822Q0382
 
Response Due
2/4/2022 7:00:00 AM
 
Archive Date
03/06/2022
 
Point of Contact
Cynetra Moore, Contract Specialist, Phone: 813-972-7535
 
E-Mail Address
cynetra.moore@va.gov
(cynetra.moore@va.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Questions and Answers Is the RFQ for the Mayaguez VA Clinic located in Puerto Rico? Int. PR-No.2 and Algarrobos, K.M 149.9, Bo. Sabanetas, Mayagüez PR 00680 (18.236973, -67.159475) Are you having RO / DI water quality (purity degradation) issues? No, the existing system has not been started yet. The purpose of the project is to recondition/upgrade the described RO System to comply with AAMI TIR 34. Are you having RO / DI water contamination (CFU count) issues? No, the existing system has not been started yet. The purpose of the project is to recondition/upgrade the described RO System to comply with AAMI TIR 34. Does your 902 GETINGE unit require 9 GPM flow? Flow requirements need to be confirmed with the equipment manufacture s specifications. Does your 904 RINSE/DRYER unit require 9 GPM flow? Flow requirements need to be confirmed with the equipment manufacture s specifications. What is the GPM flow requirement for the 559 CART WASH unit? No Cart Wash unit on site. For list of equipment to be supplied, reference attached Drawings (3x Three Bay Sink, Rinse/Dryer 2460-RD, Ultrasonic Cleaner 2460-UC, 46-5 Getinge Washer/Disinfector Model 46 and AER Medivator Advantage Plus). Is the line pressure in your RO / DI piping between 65 - 85 PSI? System was never started. Line pressures need to be per the RO System Pump rating and/or RO Manufacturer s Specifications Can you meet all required volumes / flows with your existing system? No, as such is stipulated in the attached report a change of pump and an addition of a second. Are you interested in ensuring Type-1 water quality at the point of service? Water Quality as per AAMI TIR 34, including the required lab testing to ensure that all parameters are as per the AAMI TIR 34. Note: 1. RO Storage Tank may be needed to be increased in size. An inventory assessment, based on the listed equipment consumptions, is required to ensure that appropriate inventory volume is available. 2. Proposal shall include that the existing supply RO line might need to be modified to supply all the required points, as per Page 12 of attached Drawings.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7552e33099be4361a884280e5991b8e6/view)
 
Place of Performance
Address: VA CARIBBEAN CLINICS 00921, USA
Zip Code: 00921
Country: USA
 
Record
SN06227374-F 20220130/220129201523 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.