Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 30, 2022 SAM #7365
SOLICITATION NOTICE

Z -- Whitney Power House Glazed Wall Restoration

Notice Date
1/28/2022 1:02:01 PM
 
Notice Type
Solicitation
 
NAICS
236210 — Industrial Building Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT FT WORTH FORT WORTH TX 76102-6124 USA
 
ZIP Code
76102-6124
 
Solicitation Number
W9126G22R0053
 
Response Due
2/4/2022 12:00:00 PM
 
Archive Date
02/19/2022
 
Point of Contact
Shayla Lucas, Phone: 8178861188, Robert M. Duran, Phone: 817-886-1070
 
E-Mail Address
shayla.j.lucas@usace.army.mil, robert.m.duran@usace.army.mil
(shayla.j.lucas@usace.army.mil, robert.m.duran@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Please See Amendment 01 (attachment)�For Current�Changes to this Solitication. This project includes the removal of existing single-pane glass units and existing paint system to base steel. Existing paint contains lead and will require specialized removal and disposal as defined in specifications. Removal and disposal of lead contaminated debris shall be in compliance with Society for Protective Coatings (SSPC) GUIDE 6 and Society for Protective Coatings (SSPC) Guide 7 which can be found at www.sspc.org . Corrosion and pack rust shall be removed from the steel structure and edges of the built-up members shall be seal welded. Debris in openings of built-up members of wall and doors shall be removed. Pins in the door hinges shall be removed and the hinges disassembled to be cleaned from paint, pack rust and corrosion. Welds of the door hinges shall be tested for cracks using Non-Destructive Test (NDT)methods. If the welds are deemed unacceptable, they shall be grinded out and re-welded. Door latch systems shall also be disassembled, and removed of any paint, pack rust and corrosion. Openings at ends of built-up members shall be closed with steel plates welded on to prevent future debris build-up. Weep holes shall be drilled at specified locations on built-up members. Each door shall be profiled such that it does not make contact with the wall frame when being opened and closed. Door latch insert holes shall be modified to allow door to be latched when fully closed without slamming or excessive manipulation of doors. Doors when fully closed and latching rods extended shall have minimal movement. The door hinges and latching systems shall be re-assembled, reinstalled and lubricated after paint, corrosion, and rust are completely removed. The steel wall and door structures, including hinges and latching systems, shall be repainted with a new paint system. New single-pane safety glass units shall be installed in place of existing glazing. The bottom two rows of glass units in the wall and doors shall be laminated safety glass to protect power plant personnel. Paint shall be retouched as necessary to provide an adequate coating. Weep holes shall be cleaned out if new paint is clogging exits. Options to the contract will be installing a single-point lubrication system at a specified location and using laminate reinforcing for all new glass units. This magnitude of construction of the proposed work is between $500,000 - $1,000,000 in accordance with (IAW) FAR 36.204.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a81339de9f1b4b72a14cddac1717832d/view)
 
Place of Performance
Address: Clifton, TX 76634, USA
Zip Code: 76634
Country: USA
 
Record
SN06227524-F 20220130/220129201524 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.