Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 06, 2022 SAM #7372
SOLICITATION NOTICE

P -- Demolition of Various Facilities - Shaw AFB

Notice Date
2/4/2022 1:05:45 PM
 
Notice Type
Presolicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
FA4803 20 CONS LGCA SHAW AFB SC 29152-5125 USA
 
ZIP Code
29152-5125
 
Solicitation Number
FA480322R0005
 
Response Due
2/11/2022 11:00:00 AM
 
Point of Contact
Daniel Naebeck, Duaita Roseboro
 
E-Mail Address
daniel.naebeck@us.af.mil, duaita.roseboro.2@us.af.mil
(daniel.naebeck@us.af.mil, duaita.roseboro.2@us.af.mil)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Description
DEMOLITION VARIOUS FACILITIES SITE VISIT LOCATION: SHAW AFB DATE/TIME:�14 February 2022 @ 9:00 AM EST INTERESTED CONTRACTORS MUST R.S.V.P. TO: duaita.roseboro.2@us.af.mil or daniel.naebeck@us.af.mil INFORMATION REQUIRED: Company's name, Number of Attendees, Name of Attendees, ID required for base access ANY ADDITIONAL INFORMATION WILL BE PROVIDED ONCE R.S.V.P. IS RECEIVED. ------------------------------------------------------------------------------- This notice is to advertise the upcoming contract opportunity to Demolish Various Facilities on Shaw AFB. The solicitation will be issued as a Request for Proposal (RFP) construction project, which is competed as a 100% HUBZone SB set-aside. All offerors must be registered on www.sam.gov. The NAICS Code is 238910, Site Preparation Contractors, with size standard $16.5 million applies. The magnitude for this project is $500,000 to $1,000,000. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the demolition and site repair of 13 facilities and areas.�� Contractor�s responsibilities shall include, but not be limited to, the following: 1. Removal and disposal of the building structure, (roof, exterior/interior walls, foundation, footings, grade beams, ceilings, electrical systems, mechanical systems, etc.) 2. Removal and disposal of pavements and sidewalks associated with the facility and/or identified on the plans. 3. Removal of existing slab(s) and associated landscaping. 4. Cutting and capping utilities. � � a. Provide GPS location of capped or end of cut lines. � � b. Electric: Remove and dispose of lines to transformer(s). Disconnect buried high voltage lines at transformer(s) and distribution� � � � � point(s) prior to transformer. Remove and dispose of all disconnected lines above ground and remove and dispose of� � � � � � � � � � � � transformer(s). � � c. Water: Demolish and cap lines back to the tie in point at the main water line. � � d. Wastewater: Demolish and cap lines back to the tie in point at the main wastewater line or first junction. 5. Restore site to a neat, professional appearance. � � �a. Backfill excavated areas, fine grade with positive drainage to existing storm drains and provide a six (6) inch layer of clean� � � � � � � �topsoil. � � �b. Hydro seed entire site. Water as needed until growth is established with no more than one square-foot (1 SF) of a bald area. � � �c. Water until grass is established. � � �d. Repair to pre-existing condition any damaged surrounding areas. � � �e. All loose and visible debris shall be completely removed. 6. Perform destructive asbestos surveys (IAW DHEC regulations). Based on the age of the buildings, it is not expected that asbestos is present. If asbestos is found, abatement will be a modification to this contract. 7. Dispose of all demolition debris. � � �a. Take into account special treatment of hazardous waste as well as the environmental implications related to building� � � � � � � � � � � � �demolition management (i.e. mercury and fluorescent lighting tubes, batteries, recapturing refrigerant and quantity annotated,� � � � � �mercury thermostats, etc.). � � �b. Contractor shall fill out and submit the refrigerants form to the Government. � � �c. The Contractor shall notify CE at least 72 hours before any refrigerants will be removed � � �d. The Contractor shall recycle eligible materials during demolition.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/919e11fdb4974370815fcd90adb4e02b/view)
 
Place of Performance
Address: Shaw AFB, SC 29152, USA
Zip Code: 29152
Country: USA
 
Record
SN06233565-F 20220206/220204230108 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.