SOLICITATION NOTICE
Y -- USACE SPK ARCF LAR Project 2 - Erosion Control, Bank Protection, and Stabilization Sites 2-2 and 2-3 - Sacramento, CA
- Notice Date
- 2/17/2022 10:40:29 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
- ZIP Code
- 95814-2922
- Solicitation Number
- W9123822B0006
- Response Due
- 3/17/2022 9:00:00 AM
- Archive Date
- 04/01/2022
- Point of Contact
- Jennifer Wheelis, Contract Specialist
- E-Mail Address
-
Jennifer.L.Wheelis@usace.army.mil
(Jennifer.L.Wheelis@usace.army.mil)
- Description
- The�U.S.�Army Corps of Engineers�(USACE), Sacramento District�(SPK),�anticipates a potential requirement�to provide bank protection and stabilization at Sites 2-2 and 2-3 at the American River Parkway.�� The American River Common Features (ARCF) Erosion Control, Lower American River (LAR) Project 2 is located at sites 2-2 and 2-3 along the right (east) bank of the American River Parkway in Sacramento, California. Site 2-2 is approximately 1,200 feet long and is located under the Howe Avenue Bridge. Site 2-3 is approximately 6,600 feet long and extends from the downstream side of the Campus Commons Golf Course to about 1,300 feet upstream of the Guy West Pedestrian Bridge. The anticipated project includes roughly 7,800 feet of stream bank protection and stabilization of the existing riverbank and levee to protect critical infrastructure against the effects of erosion during large flood events. Most vegetation will be cleared from the project footprint prior to construction. At Site 2-2, the Contractor will be required to clear remaining vegetation and stumps, grub, and strip the project footprint, place soil and rock revetment on the riverbank and levee face beneath Howe Avenue bridge, place soil fill and erosion control netting to construct planting benches, place instream wood structures, and plant and seed placed material. At Site 2-3, the Contractor will be required to clear remaining vegetation and stumps, grub and place soil and rock revetement on the levee face near H-Street, and seed placed material. Along the riverbank through Site 2-3, the Contractor will be required to excavate the bank to a specified flatter slope, excavate ten (10) feet deep into the finished grade to place approximately 79 rock tiebacks by placing rock revetment in 12-foot-wide trenches extending 60 feet to 90 feet in length, backfill with soil fill to finished grade, and place sections of continuous soil-filled rock protection. After excavation and placement, the Contractor will be required to place erosion control netting over planting benches, place instream wood structures on the planting benches, and plant and seed the finished grade. Most of Site 2-2 will require working in the active channel of the American River to place material, while the majority of Site 2-3 will be working in the floodplain above the active channel, with limited areas of the site requiring work in the active channel. The project will require import and placement of approximately 52,500 tons of rock riprap meeting the FHWA Type III gradation, approximately 49,000 tons of rock riprap meeting the FHWA Type IV gradation, approximately 4,500 tons of rock riprap meeting the FHWA Type V gradation, approximately 12,000 tons of bedding material to be imported and placed, approximately 365,000 cubic yards of soil excavation to be off hauled from the site over public roads and stockpiled at a specified stockpile location within 10 miles of the project, approximately 295 trees to be imported and placed as instream woody material, and approximately 4,700 live cuttings to be imported and planted on-site.� Work will be performed over two (2) construction seasons as indicated in the plans and specifications. The solicitation, plans,�and specifications are available for inspection without charge when accessed through the GPE or�when�requested and delivered�by electronic�mail and/or�data interchange.�� In accordance�with Defense�Federal Acquisition Regulation Supplement (DFARS)�236.204(ii),�the�Government currently estimates the�magnitude of�construction�for this project�to be�between $25,000,000 and $100,000,000.� The ONLY Interested Vendors / Plan Holders / Bidders List is available through beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this�Solicitation�or coordinate partnering arrangements between parties. Contractors should check beta.SAM.gov frequently for changes to the interested vendors list and this notice.�� PLEASE NOTE:�THIS PROJECT�AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION�MAY BE�CHANGED,�DELAYED,�OR�CANCELED AT ANY TIME.� SAM Posting Amendment 1 - corrects the bid closing date to 17 March 2022, as stated on the SF 1442.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/da36996c69264bcb8772a58c9d54c38e/view)
- Place of Performance
- Address: Sacramento, CA 95825, USA
- Zip Code: 95825
- Country: USA
- Zip Code: 95825
- Record
- SN06245818-F 20220219/220217230102 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |