Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 20, 2022 SAM #7387
SOLICITATION NOTICE

Z -- 575 -22-104 Replace 4th Floor Flooring

Notice Date
2/18/2022 1:49:52 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NETWORK CONTRACT OFFICE 19 (36C259) Greenwood Village CO 80111 USA
 
ZIP Code
80111
 
Solicitation Number
36C25922Q0165
 
Response Due
3/14/2022 1:00:00 PM
 
Archive Date
04/13/2022
 
Point of Contact
Joseph (Joe) N Wingfield (CO), Contract Officer
 
E-Mail Address
joseph.wingfield@va.gov
(joseph.wingfield@va.gov)
 
Awardee
null
 
Description
Questions and Answers for Replace 4th Floor Flooring project The plan shows a starc wall requirement with doors. Is this provided by the VA? In lieu of the starc wall system, can contractor build a temp plastic framed wall with door? The VA will provide STARK walls with door for entrance to construction area. Plastic may be used to reinforce infection control barriers. The plan shows doors to remain closed during construction (rooms along the hallway). Are these occupied? Are we required to seal/tape these doors during construction to make sure dust and fumes don t penetrate these rooms? Doors to the rooms along the hallway will remain open to be occupied during construction. Plastic with zipper will be required to seal rooms from construction site. Barricades, ICRA containment provisions shall be arranged to allow patients and staff unimpeded access (including wheelchairs and patient beds where applicable) to services and resources within the facility. IF the rooms along the hallway are occupied during construction, will the VA allow doing these in phases where personnel can be relocated for a certain period during construction of identified phase? The VA will allow phases to minimize conflict with services, but personnel will not be relocated during construction. With the exception of room 4021 and 4022. Flooring materials has a Leadtime of 4 weeks at the minimum according to our suppliers. Will the VA consider increasing the period of performance to 90 days to cover for submittal and long lead items? Or an administrative NTP of at least 45 days? The VA will consider an admin notice to proceed. All material must be on site so construction progress without gaps. Final method of period of performance with be determined by CO. Please confirm if asbestos is not present underneath the existing flooring. Is there an asbestos report that the bidders can verify? Yes, ACM report identifies asbestos in rooms 4021 and 4022 and tile that was under carpet in the hallway wasn t tested. ACM report will be provided for bidder s verification. Is there any noise restriction during demolition/grinding of flooring? Is the VA looking into weekend work for demolition/grinding? Noise restrictions for grinding will restrict schedule for grinding between the hours of 4:30PM to 8PM M-F and Saturday/Sunday work between 8am and 8pm.    Please confirm that rooms 4021 and 4022 will be empty ready for flooring demo and installation of new flooring. Hauling, relocation and reinstall of existing furniture, movable or fixed furniture is excluded from this scope of work. Yes Rooms 4021 and 4022 will be empty and ready for flooring demo and installation. VA will relocate existing furniture. During removal of existing rubber base, there is tendency to damage the existing wall paint. Please confirm incidental repairs of this nature is included in the scope of work for damaged portions only for repairs. Preconstruction inspection will be documented with photos to record existing conditions of space. All other damage afterward with be the responsibility of the contractor. If upon removal of existing flooring, the contractor found out that existing floor require repair/leveling of considerable amount, please confirm that this may be evaluated as a change order. No, see spec section 09 65 16 part 3.1, E. actual conditions will be discussed when discovered. Please advise orientation or layout of new LVT flooring in the hallways and the 2 rooms. LVT flooring shall have wood grain running parallel with hallway, and in the 2 rooms. Spec section 09 56 16 Part 2 2.1.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/54b716b5430340aeb630a6e4b18c7c28/view)
 
Record
SN06247185-F 20220220/220218230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.