SOLICITATION NOTICE
Z -- PROJECT: 676-20-004 REPLACE CHEMISTRY ANALYZER
- Notice Date
- 2/25/2022 3:49:46 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252) MILWAUKEE WI 53214 USA
- ZIP Code
- 53214
- Solicitation Number
- 36C25222B0011
- Response Due
- 3/3/2022 11:00:00 AM
- Archive Date
- 04/02/2022
- Point of Contact
- Donita L Grace, Contractor
- E-Mail Address
-
donita.grace@va.gov
(donita.grace@va.gov)
- Awardee
- null
- Description
- SOLICITATION 36C25221B0017 AMENDMENT A0001 February 14, 2022 Project: Replace Chemistry Analyzer Project Number: 676-20-004 Location: Tomah VA Medical Center, Tomah, WI Amendment 0003 hereby incorporates the following clarifications/change(s) into the solicitation package. Solicitation RFI s/Questions and Answers Q1. There are three sections in Div. 27. None of them address the type of cable, jacks, patch panels, faceplates etc. that we are to provide. R1. Use the electrical and low voltage drawings together. If the low voltage sub only looks at the two low voltage sheets, they will be missing information. Q2. There is no spec provided for the controls on this project. Can you please ask who is responsible for controls and what they are, JCI? If we need to include them, can they provide specs and information about whether or not the temporary RTU is to be tied into the BAS controls? R2. The existing control system is JCI. The intent is for the temporary unit to run continuously with its packaged controls to maintain a constant discharge temperature (50F match existing system). The unit should only be operational as long as necessary to replace the coil component of the existing air handling unit (expecting days, not weeks). All efforts should be made to minimize the use of the temporary unit. Q3. There is a 10 exhaust duct connection to existing duct in phase 2 at location D.5/x3.2, which drops down below an existing 34x10 SA duct. There is no indication if this exhaust duct is going to a hood or grille. The phase 2 demo plan shows that it is deleted from a nearby location, but again doesn t state what it is going to. R3. The duct in question serves an existing fume hood. The fume hood is temporarily relocated in Phase 1 near E/2.1. In Phase 2 the unit is relocated to its final location near D/3.4. B. Bid Schedule BID Opening DATE / TIME: Thursday, March 3, 2022 at 1:00 p.m. CST. LOCATION: Honey Creek Business Park 115 S. 84th Street - Suite 101 Milwaukee, WI 53214-1476. ALL QUESTIONS REGARDING THIS SOLICITATION SHALL BE SENT TO THE FOLLOWING INDIVIDUALS: Donita Grace -- Donita.Grace@va.gov Kristi Kluck --- Kristi.Kluck3@va.gov This solicitation can be monitored at https://beta.sam.gov/opp/a8d8f6ac82824111870acc5a792b45e2/view?keywords=36C25220B0011&sort=-relevance&index=&is_active=true&page=1&refresh=y Contractors shall ensure all amendments are acknowledged on Page 2 of the SF-1442.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/97e3acf256ae48208428f3ab21664860/view)
- Record
- SN06251259-F 20220227/220225230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |