Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 02, 2022 SAM #7397
SOLICITATION NOTICE

99 -- MOTOR UNIT ASSEMBLY

Notice Date
2/28/2022 9:11:02 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038322QP269
 
Response Due
3/13/2022 10:00:00 PM
 
Archive Date
03/29/2022
 
Point of Contact
Telephone: 2156973528
 
E-Mail Address
ANGELICA.RISMAN@NAVY.MIL
(ANGELICA.RISMAN@NAVY.MIL)
 
Description
CONTACT INFORMATION|4|N791.04|ANGIE MARKLE|215-697-3528|ANGELICA.MARKLE@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and receiving report (combo) type |N/A|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.3 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.4 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.5 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.6 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.7 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.8 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;623619-1; , Revision ;E; and all details and specifications referenced therein. 1.9 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.10 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=A422494 |80020| B| |C| | | | DRAWING DATA=B401506 |80020| T| |C| | | | DRAWING DATA=MPR 1221 |80020| R| |A| | | | DRAWING DATA=NAWCADLKE-MISC-48J100-0005 |80020| -| |A| | | | DRAWING DATA=422221 |80020| E| |C| | | | DRAWING DATA=422394 |80020| E| |C| | | | DRAWING DATA=425797 |80020| E| |C| | | | DRAWING DATA=516390 |80020| J| |C| | | | DRAWING DATA=516489 |80020| D| |C| | | | DRAWING DATA=516496 |80020| E| |C| | | | DRAWING DATA=516571 |80020| G| |C| | | | DRAWING DATA=516572 |80020| B| |C| | | | DRAWING DATA=516821 |80020| F| |C| | | | DRAWING DATA=516879 |80020| E| |C| | | | DRAWING DATA=516883 |80020| E| |C| | | | DRAWING DATA=518395 |80020| L| |C| | | | DRAWING DATA=519015 |80020| C| |C| | | | DRAWING DATA=614958 |80020| H| |C| | | | DRAWING DATA=623619 |80020| E| |C| | | | 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term ""contract"" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MOTOR UNIT ASSEMBLY ;623619-1; P/N, ;6105-01-303-8396; NSN, ;REV E; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the ""prime contractor"" or the ""actual manufacturer"" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the ""Government Designated Agency"" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. MOTOR UNIT ASSEMBLY ;LIMITORQUE CORP; Company Name , ;LYNCHBURG, VA 24502-2248; Address , ;52374; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF ANY MAJOR, CRITICAL AND MINOR CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT./; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES.; ) SURFACE INSPECTION ( ;APPLIES; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ;APPLIES; ) HIGH SHOCK TEST ( ;APPLIES; ) MECHANICAL VIBRATION TEST 4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA REP AT FAX (732) 323-1381; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.4 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY QA REP AT FAX (732) 323-1381; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ;THE CONTRACTOR SHALL ASSIST ON THE CONDUCT OF THE INTERIM INSPECTIONS AS DESCRIBED HEREIN. CONTRACTOR SHALL PROVIDE ADEQUATE FACILITIES, INSPECTION EQUIPMENT,AND SKILLED PERSONNEL, TO SUPPORT THE NAVAIR INSPECTOR IN THE CONDUCT OF THE INTERIM INSPECTIONS. THE CONTRACTOR SHALL PROVIDE GAUGES, TOOLS,FIXTURES, AND JIGS NECESSARY TO PERFORM THE INSPECTIONS. THE CONTRACTOR SHALL ALSO PROVIDE SUFFIENT RIGGING/MATERIAL HANDLING SERVICES AND MANPOWER TO SETUP/CONFIGURE/OPERATE EQUIPMENT & MACHINES USED TO ACCOMPLISH THE INSPECTION TASK.THIS CONTRACTOR ASSIST REQUIREMENT SHALL BE APPLICABLE TO 100% OF THE PRODUCTION AND AS A MINIMUM, INCLUDING INSPECTION OF ALL (100%) IMTERIM INSPECTION REQUIREMENTS IDENTIFIED ABOVE.; ;iii. Dimensional and Functional Inspection per Drawing 518395 prior to next assembly iv. C1 thru C7 prior to installation of Coupling 425797-1 and Counter 518395-2 per Drawing 623619.; ; ; ; ; ; ; ; ; 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (21-10039):PROCUREMENT TDR THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS""CRITICAL"" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED REQUESTS FOR SOURCE APPROVAL AND BEEN. APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY NOT PREVIOUSLY APPROVED MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED LATER IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ block 6: forward additional copy to aso code cited in block 10.A on page 1. Production and RECEIPT INSPECTION REPORT Data Requirements (As required based on repair or overhaul process/procedure) a. Copies of all approved requests for variations. b. Material and mill certifications per Drawing 623619, 519015, 518395, 516883,516390, 516489, B401506, 516496, A422494, 516572, 516571, 422221, and 425797. c. Dimensional Inspection per Drawing 623619, 519015, 518395, 516821, 422394, 5516489, B401506, 516496, A422494, 516572, 516571, 422221, and 425797. d. MotorUnit Shock Tested IAW Note 1E and 12 per Drawing 623619. e. Identification per Drawing 623619, 519015, 518395, 516883, 516821, 422394, 5516489, A422494, 516572, 516571, 422221, and 425797. f. Torque Switch set to 20 FT-LBS. g. Protective coating per Drawing 623619, 519015, and 518395. h. Counter P/N 518395-2 shall be mounted IAW notes 16 and 17 per Drawing 623619 i. All threads and bearing surfaces coated prior to torque application per Draw j. Motor Unit Assy shall meet the requirements of note 1 A, B, C, D, F, G,H, a623619. k. Welding and Inspection IAW NAVSEA S9074-AR-GIB-010/278 per drawing 519015, 5and 516572. l. Construction of the counter IAW 518395. m. Shock and Vibration tested IAW note 2 per Drawing 518395. n. Torque to rotate shaft IAW note 9 per Drawing 518395. o. Shaft to withstand 10 IN-LBs IAW note 10 per Drawing 518395. p. Gearing and rotation IAW note 5 per Drawing 518395. q. Bearings permanently lubricated IAW note 6 per Drawing 518395. r. Assembly per Drawing 623619, 516572, and 516879. s. Performance requirements IAW note 1 per Drawing 422394. t. Drum dynamically balanced IAW note 5 per Drawing 516390. u. Heat Treat per Drawing 516390, B401506, v. Penetrant inspection per Drawing 516390. w. Magnetic particle inspection per Drawing B401506. x. Clips and Insulators cemented per Drawing 516572.c y. Lining Bond tested per Drawing 516572. z. 100% inspect, and record the readings for the pitch and functional diameters the inspection results are acceptable and are IAW System 22 of FED-STD-H28/20 per drawing 623619, 516489, 519015623619, 516489, 519015 Receipt inspection and Certification of Sub-Components: a. P/N 518395-1 shall be certified at the time of interim inspection. Parts be certified and marked as directed by NAWCADLKE prior to assembly. Contractor Assist and Marking as specified below applies b. Upon successful review of the data, NAWCADLKE will reinstate or provide (as applicable) a MIC number. The Supplier shall reapply the MIC Mark to the part upon receipt of the MIC from NAWCADLKE. MIC marks shall be located near, and in the method of part marking indicated on the applicable drawing. In cases where the drawing specifies an ink stamp and stencil the MIC mark shall be metal stamp, laser etch, vibro etch, or chemical etch unless the use of such marking methods will cause damage to the functionality of the part. Deviation from any of these methods shall require prior NAWCADLKE approval. DCMA shall verify this MIC number is proprly marked on the part. c. Suppliers shall provide all remaining data to NAWCADLKE along with evidence Government representative. The request shall include the following information:number, Contract number, Point of Contact, Part Nomenclature, Part Number, Seril Number (NIIN) (if applicable), and that the CSI part is eligible for certification by NAWCADLKE. ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ Receipt Inspection and Certification of the Top Assembly: a. The receipt Inspection and Certification of the Top Assembly shall occur during the final inspection. Contractor Assist and Part Marking as specified below applies. ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ Contractor Assist and Part Marking: The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection personnel,tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficientrigging/material handling services and manpower to setup to support the NAWCADLKE Inspector in the conduct of the interim setup/configure/operate equipment & machines used to accomplish The conrigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplishthe inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process,the NAWCADLKE QA representative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI). DATE OF FIRST SUBMISSION=ASREQ Inspection Hold Points for Quality Assurance Report 4The performing contractor or activity shall provide a step by step overhaul/repprocedure for disassembly and reassembly. This procedure shall be subject to NAWCADLKE approval prior to commencing overhaul/repair. The procedure shall include SUGGESTED quality assurance ""hold points"" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at final assembly are accessible for proper interim inspection. DATE OF FIRST SUBMISSION=ASREQ Block 6: Forward additonal copy to ASO code cited in block 10.A on page 1. WELD PROCEDURE REPORT /Data Requirements (As required based on repair or overhaul process/procedure) a. Weld procedure IAW NAVSEA S9074-AR-GIB-010/278^ para 4.2 per Drawing519015, 516489, and 516572. DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ Welding Procedure Qualification Report a. The Weld Procedure Qualification Test Report, including all supporting test documentation, IAW NAVSEA S9074-AQ-GIB-010/248^ para 4.2.3 and 4.6 Drawing 519015, 516489, and 516572 DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/267039d9fa9c41059efcedfcb4d62794/view)
 
Record
SN06252925-F 20220302/220228230103 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.