Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 04, 2022 SAM #7399
SOLICITATION NOTICE

Z -- West 388th/419th Fighter Wing Apron at Hill AFB

Notice Date
3/2/2022 2:42:58 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123822R0008
 
Response Due
4/4/2022 10:00:00 AM
 
Archive Date
04/19/2022
 
Point of Contact
John Wysocki, Deanna C. Zemovich
 
E-Mail Address
John.Wysocki@usace.army.mil, deanna.c.zemovich@usace.army.mil
(John.Wysocki@usace.army.mil, deanna.c.zemovich@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a design-build contract therefore the awarded contractor�is required to perform design work prior to construction. The awarded contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents. Scope of Work: This Design Build project will remove and replace the West portion of the 388th/419th Fighter Wing F-35 Apron. The existing sunshade shelters located on the apron will also be removed and replaced. The majority of the pavement is identified in the latest Pavement Evaluation as A17B. The existing pavement is approximately 40 years old and has exceeded its design life. The existing panels are oversized and will be replaced with appropriately sized panels. The project will consist of removing the exiting 12� PCC and replacing with 15� PCC. The new pavement section will incorporate a stabilized drainage layer and new subbase course material. In addition to new PCC parking apron and ACC shoulders, the sunshades will be dismantled, recycled and new sunshades installed. Existing crew shacks will be removed and relocated. One additional crew shack will be provided so that each parking row will have a crew shack. As part of this project, the apron will be re-marked. Contractor shall perform work as stated in this Attachment 1 Summary of Work, Attachment 2 �Concept Design�Drawings, Attachment 3 Supplemental Contract Requirements. The project shall be designed within the criteria prescribed, as well as other codes and standards specified in the contract.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1978044b4acb4af2884cec85cd78c635/view)
 
Place of Performance
Address: Hill AFB, UT 84056, USA
Zip Code: 84056
Country: USA
 
Record
SN06254967-F 20220304/220303211709 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.