SOLICITATION NOTICE
Y -- Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RPR) Phase V, Capital Power Plant
- Notice Date
- 3/8/2022 5:51:01 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- ACQUISITION & MATERIAL MAN. DIV. Washington DC 20515 USA
- ZIP Code
- 20515
- Solicitation Number
- AOCACB22R0043
- Response Due
- 3/25/2022 1:00:00 PM
- Archive Date
- 04/09/2022
- Point of Contact
- Darwin Thomas, Phone: 202-227-7234
- E-Mail Address
-
darwin.thomasjr@aoc.gov
(darwin.thomasjr@aoc.gov)
- Description
- This is the Soliciation for the Architect of the Capitol has a requirement for Construction Services for Piping Replacement and Egress Improvements, Refrigeration Plant Revitalization (RFP) Phase V, Capital Power Plant (CPP) (Project Number PP 08001J) � Construction Services involves the revitalization of the West Refrigeration Plant (WRP) and limited work in the West Refrigeration Plant Expansion (WRPE). All work will occur within an existing and fully operational plant. The project, including Base Bid and all Options is expected to be $10M and above. This phase shall include the following: Base Bid: Demolition and replacement of Chilled Water Piping in the WRP basement. Work will include piping 42� diameter and below, to include insulation, jacketing, and miscellaneous devices and valves as described in construction documents. 1. Sub-Option A: Condenser Water piping (Basement). This sub-option includes the demolition and new work construction of the condenser water piping in the Basement Level of the WRP only. 2. Sub-Option B: Condenser Water piping (First Floor). This sub-option includes the demolition and new work construction of the condenser water piping on the First Floor of the WRP only. 3. Sub-Option C: WRP condenser water filtration system. This sub-option includes the new work construction of the condenser water traveling screen filtration system located in the Basement Level of the WRP only. 4. Sub-Option D: WRPE condenser water filtration system. This sub-option includes the new work and limited demolition construction of the condenser water traveling screen filtration system located in the Basement Level of the WRPE only. 5. Sub-Option E: WRP/WRPE ball cleaner system. This sub-option includes the new work and limited demolition construction of the ball cleaner system located on the First Floors of the WRP and WRPE. 6. Sub-Option F: WRPE Electro Cell Particle Precipitator Filter. This sub-option includes the demolition and new work construction of the electro cell particle precipitator filter system for the condenser water located in the Basement Levels of the WRP and WRPE. 7. Sub-Option G: WRPE Piping Seismic Supports. This sub-option includes the new work construction costs to install seismic supports to the existing chilled water and condenser water piping on the WRPE�s Basement Level and First Floor. Construction Duration � Base Bid: The construction duration for completion of the base bid shall be no more than 548 calendar days (18 months) from the Notice to Proceed (NTP). Bid Options will be awarded within one calendar year from Base Bid NTP. Project duration for bid options varies depending on timing of award, not to exceed 912 calendar days (30 months) from Base Bid if awarded one year from Base Bid NTP.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/cd0960d41f604dd8b52eac5f7344e0a7/view)
- Place of Performance
- Address: Washington, DC 20515, USA
- Zip Code: 20515
- Country: USA
- Zip Code: 20515
- Record
- SN06260230-F 20220310/220308230100 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |