AWARD
Z -- Simplified Acquisition of Base Engineering Requirements (SABER)
- Notice Date
- 3/31/2022 4:16:39 PM
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- FA8201 OL H PZIO HILL AFB UT 84056-5805 USA
- ZIP Code
- 84056-5805
- Solicitation Number
- FA8201-22-D-0003
- Archive Date
- 04/15/2022
- Point of Contact
- Angie Poll, Joe Laing
- E-Mail Address
-
angela.poll@us.af.mil, joseph.laing@us.af.mil
(angela.poll@us.af.mil, joseph.laing@us.af.mil)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Award Number
- FA8201-22-D-0003
- Award Date
- 03/31/2022
- Awardee
- SHOFAR COMMUNICATIONS LLC UT 84015-8573 USA
- Award Amount
- 270000000.00
- Description
- This posting is to provide notice of contract award for the Simplified Acquisition of Base Engineering Requirements III (SABER III) effort. The following information is provided IAW FAR 5.201 and FAR 5.3: 1.� Action Code: Contract Award 2.� Date: March 31, 2022 3.� Year: 2022 4.� Contracting Office Zip Code: 84056 5.� Product or Service Code: Z2JZ � Repair or Alteration of Miscellaneous Buildings 6.� Contracting Office Address: 6038 Aspen Ave., Bldg. 1289NE, Hill AFB, UT 84056 7.� Subject: Simplified Acquisition of Base Engineering Requirements III (SABER III) 8.� Proposed Solicitation Number: FA8201-21-R-0007 9.� Closing Response Date: March 11, 2021 10.� Contact Point or Contracting Officer: Emily J. McCollaum 11.� Contract Award Number: FA8201-22-D-0003 12.� Contract Award Dollar Amount: (IDIQ Estimated Maximum Amount $270M) 13.� Line Item Number: 0001 - SABER Construction Projects: Offeror shall perform multiple disciplines in construction to include maintenance, repair, and alteration of real property and facilities as specified on the attached SABER Statement of Work (SOW). Individual projects will be further defined in each individual Task Order. 0002 � Post Award Conference: Contractor shall attend a Post Award Conference and submit its Safety Plan. 1001 - ** 6 Month Option to Extend Ordering Period**� SABER Construction Projects: Offeror shall perform multiple disciplines in construction to include maintenance, repair, and alteration of real property and facilities as specified on the attached SABER Statement of Work (SOW). Individual projects will be further defined in each individual Task Order. 14.� Contract Award Date: March 31, 2022 15.� Contractor: Shofar Communications, LLC DBA Kudu Construction 16.� Description: The purpose of this contract is to support the Hill AFB and Utah Air National Guard infrastructures. The SABER III contract is required to provide base engineering and construction requirements to support and sustain a broad range of maintenance, repair and minor construction work on various real property facilities at Hill AFB and it�s tenant units, including design and engineering services incidental to construction. 17.� Place of Contract Performance: Hill AFB, Utah, and tenant unit locations 18.� Set-aside Status: 8(a)
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c6e7748bc27d457387146b1d81585875/view)
- Place of Performance
- Address: Hill AFB, UT 84056, USA
- Zip Code: 84056
- Country: USA
- Zip Code: 84056
- Record
- SN06284836-F 20220402/220331230100 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |