N -- Gifford Pinchot NF Mt. Adams RD Tree Cooler Cover Replacement

Notice Date
3/31/2022 11:23:29 AM
 
Notice Type
Solicitation
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
USDA-FS, CSA NORTHWEST 2 Portland OR 972042829 USA
 
ZIP Code
972042829
 
Solicitation Number
1240BD22Q0072
 
Response Due
4/12/2022 12:00:00 PM
 
Archive Date
04/27/2022
 
Point of Contact
Mindy Hickman, Phone: 5036681601
 
E-Mail Address
mindy.hickman@usda.gov
(mindy.hickman@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This contract involves the removal, disposal, and replacement of TWO cover structures over both the seed cooler and tree cooler. �New cooler covers shall be made up of 14 gauge tube steel, vertical A frame construction, and be 15 feet wide by 38 feet long, each. � The seed cooler�(building 2608) shall have a 9 foot high clearance (clearance to lowest underside roof� structure/truss/angled support brackets), and the tree cooler (building 2609) shall have 11 foot high clearance. �Roofing panels shall be 29 gauge coated metal. �The roofing color and trim is to be dark or medium brown. �If pandemic supply issues make brown roofing unavailable or cost prohibitive, green is the alternate color choice. �There will be two separate structures/covers: one over each refrigeration unit. �Roofing must have a 6:12 pitch and any ribs in the roofing panel must run vertically so as to naturally shed water and snow (perpendicular to the ridgeline or more commonly referred to as A Frame Vertical). �Covers shall be properly anchored into the ground surface in accordance with manufacturers recommendations. �All roofing screws shall be gasketed and applied with an approved metal roofing sealant on top of the screws after installation. � The refrigeration units are sitting on separate concrete pads and the covers shall be securely anchored to the ground surface outside/adjacent to the concrete pads. �The ground surface is a mix of dirt, rock, and gravel. �Demolition and subsequent new construction will have to be worked around the existing coolers. �At no time will the power to the coolers be interrupted. �All precautions must be taken to ensure no damage occurs to the coolers during this work. �The old cooler cover structures can be removed up to 3 days before the installation of the new cover structures. �If measurable precipitation is predicted between the time of the cover removal and the start of the new cover installation, then the units must be covered. �Covers shall be waterproof, secured in place so as not to be blown off by wind or allow rainwater to fall directly onto any electrical components. �Covers cannot interfere with the cooling fans located at the back of the units. � �note: current aerial electrical connections (as depicted in the project photos) will be moved to underground trenches prior to structure replacement.� � PROJECT LOCATION Mt. Adams Ranger District (MARD): The address for this work is as follows:� 2455 HWY 141, Trout Lake, WA 98650�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b1e6228918e84fb0abfb911f10e69383/view)
 
Place of Performance
Address: WA 98650, USA
Zip Code: 98650
Country: USA
 
Record
SN06285494-F 20220402/220331230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.