SOLICITATION NOTICE

65 -- Ceiling Mounted Patient Lifts with Online reporting system RFQ Amendment 1

Notice Date
3/31/2022 1:23:52 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
339112 — Surgical and Medical Instrument Manufacturing
 
Contracting Office
245-NETWORK CONTRACT OFFICE 5 (36C245) LINTHICUM MD 21090 USA
 
ZIP Code
21090
 
Solicitation Number
36C24522Q0219
 
Response Due
4/12/2022 10:00:00 AM
 
Archive Date
04/22/2022
 
Point of Contact
stephanie.henderson3@va.gov, stephanie.henderson3@va.gov, Phone: stephanie.henderson3@va.gov
 
E-Mail Address
stephanie.henderson3@va.gov
(stephanie.henderson3@va.gov)
 
Awardee
null
 
Description
The Purpose of Amendment #1 is to answer questions, revise RFQ/SOW, and extend close date. See- (1) Answers to questions below. Q.1 What is the current manufacture of the patient lifts? Arjo-Huntleigh (Now Arjo) Q.2 What are the issues of the existing lifts? The current units are beyond their life expediency. There are no significant issues with these lifts. There have been a lot of battery replacements in the past 2 years and at least 10 charging issues within the rail systems. Q.3 Can plans be provided for the areas that will be receiving the new lifts? Yes, See Patient Lift Plan Portfolio attachment Q.4 Can the rooms that will be receiving lifts be identified by room number in plan? Yes, See Patient Lift Plan Portfolio attachment Q.5 Will a site visit be allowed? No. See Patient Lift Plan Portfolio attachment Q.6 Can VA provide the descriptions and dimensions of the track layouts, per line item? Yes, the current track lengths are 13 Q.7 When and will team meeting be scheduled? Yes, after contract award. Q.8 Do you require job to be OSHA certified? Yes. OSHA 30 is required. Q.9 Do you required a certified OEM/manufacturer installation technician? Yes. Q.10 Do you require certification for install? Yes, see specification number 11 and 26. Q.11 Will the HVAC system need to be isolated in any of the rooms? Yes, see specification number 25. Q.12 If current power receptacles are not in an appropriate location, will contractor be responsible for the relocation of power to support the lift system? No Q.13 Will VA be responsible for electrical and HVAC portions? Yes. Any necessary site-prep that is required will be handled through a separate site prep contract that the VA will put in place once the vendor is selected, and the site prep needs (if any) are clearly identified. Q.14 Do you fixed tracks? In the basement to provide maintenance/testing on overhead lifts, and in outpatient PT Q.15 Do you need linear tracks? In engineering, and outpatient PT Q.16 Do you need U tracks? In outpatient PT. Q.17 Will contractor shall be responsible for the repair (patch/paint) of all hard ceilings that are affected during the installation/deinstallation of ceiling mounted patient lifts? Yes, see specification number 15. Q.18 Is there XY or H Track Configuration with continuous charge requirement? All overhead lifts are requested to be charging on the rails. Close date is extended to close 4/12/22 EST @1300
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b540acb75a3a45ad97256580deffa618/view)
 
Place of Performance
Address: Department of Veterans Affairs Huntington VAMC Warehouse 1540 Spring Valley Dr, Huntington, WV 25704, USA
Zip Code: 25704
Country: USA
 
Record
SN06286568-F 20220402/220331230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.