Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 02, 2022 SAM #7428
SOURCES SOUGHT

Y -- CA FTNP MOJA 12(1) CIMA ROAD

Notice Date
3/31/2022 12:33:28 PM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22SS0018
 
Response Due
4/15/2022 1:00:00 PM
 
Point of Contact
Ryan Phillips
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Ryan Phillips) for receipt by close of business (2 p.m. local Denver time) on April 15, 2022:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $35 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the CA FTNP MOJA 12(1) CIMA ROAD project in which you performed full depth reclamation, roadway excavation, placement of asphalt concrete pavement and rip rap. �DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ CA FTNP MOJA 12(1) CIMA ROAD PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 17.1 miles of Cima Road in San Bernardino County, California.� The project also includes installation of low water crossings/shoulder stabilization areas along Cima Road with spot locations on Kelbaker Road, Lanfair Road, and Cedar Canyon Road.� The project is located in a remote area approximately 75 miles from Las Vegas, NV, the closest major metropolitan area. The Cima Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment in select areas, reinforcing low water crossings, and improving safety with longitudinal and transverse rumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with rip rap revetment. The Kelbaker Road improvements consist of a rip rap shoulder stabilization area and four shoulder asphalt patching locations.� Lanfair and Cedar Canyon Roads consist of two low water crossings and a roadway slope stabilization area. The anticipated advertisement date for the project is October 2022 with construction commencement in December.� Construction duration is estimated at 12-18 months. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations.� Principle work items include: 17.1 miles of full depth reclamation, method 2, 6-inch depth 19,000 cubic yards of roadway excavation 25,000 cubic yards of roadway aggregate, method 2 49,000 tons of asphalt concrete pavement 5,000 cubic yards of rip rap 3,800 linear feet of concrete barrier (low water crossings), 60 linear feet of precast reinforced concrete box culvert (7�span by 5� rise) 52,800 linear feet of fence, tortoise barrier 6 miles of mumble strips The estimated price range of the project work is between $25,000,000 and $35,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/eb2aa4aca7884cbdb331dfc7efc2f00b/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN06286836-F 20220402/220331230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.