SOURCES SOUGHT
20 -- COLUMBIA Class Ropeguard Production
- Notice Date
- 4/5/2022 12:45:41 PM
- Notice Type
- Sources Sought
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- NSWC CARDEROCK BETHESDA MD 20817-5700 USA
- ZIP Code
- 20817-5700
- Solicitation Number
- N00167-22-RFI-CLBRopeguard
- Response Due
- 4/28/2022 2:00:00 PM
- Point of Contact
- Douglas Riedel, Abeer J. Ameer
- E-Mail Address
-
douglas.a.riedel.civ@us.navy.mil, abeer.j.ameer.civ@us.navy.mil
(douglas.a.riedel.civ@us.navy.mil, abeer.j.ameer.civ@us.navy.mil)
- Description
- �Request for Information (RFI): COLUMBIA Class Ropeguard Production� This is not a Request for Proposal (RFP) and award of a contract will not be made as a result of this questionnaire.� Naval Surface Warfare Center, Carderock Division (NSWCCD) requests assistance from industry for conducting market research for the manufacturing of nine (9) CLB Ropeguards on a future production contract for COLUMBIA Class submarine propulsor hardware. The purpose of this RFI is to conduct market research by soliciting industry comments and feedback. Market Research will determine potential socio-economic small and large businesses interested in, and capable of, providing the support services identified herein.� This posting is issued in accordance with the requirements of Federal Acquisition Regulation (FAR) Parts 10. Responses should include the following: 1. Cover letter, not to exceed one (1) page that includes: Organization name, CAGE Code, and address Point of contact name and contact information Size and type of organization, including if applicable U.S. small business or other status Brief statement of interest that indicates the organization�s interest in applying as a prime or subcontractor. 2.� Response to NSWCCD questions shall not exceed 25 pages. Interested parties shall provide a response to the following questions: The Government would like to gauge industry interest in producing COLUMBIA class propulsor ropeguards.� The ropeguard design is defined by attachment (1) and its references.� The ropeguard assembly is currently undergoing a prototype manufacturing demonstration and the drawings are anticipated to be revised with lessons learned before the production contract RFP is released. If your company is interested, please answer the following questions; The first planned order CLB ropeguard is going to require delivery 21 months after award, and each subsequent ropeguard is going to require delivery 15 months after award.� Is this delivery cadence expected to result in any issues? The planned ordering cadence is planned to result in up to four ropeguards in production at the same time with up to two ropeguards requiring �the same delivery date.� Is this ordering cadence expected to result in any issues? In order to be eligible to submit a technically acceptable bid for the upcoming ropeguard production contract, the Government requires interested parties to become qualified to produce the ropeguard at their own private expense.� The COLUMBIA class propulsor ropeguard is defined in a specification drawing format without specific composite materials or processes defined.� In order to demonstrate that a given vendor�s proposed combination of materials and manufacturing processes is adequate to meet the ropeguard�s functional requirements, qualification of processes is required.� The specific qualifications that must be completed by prospective offerors in advance of contract award are defined in attachments (2)-(5).� Any other qualifications required to support a successful bid will be defined in the solicitation. The Government would like to understand if industry is capable and willing to become qualified to produce COLUMBIA class propulsor ropeguards at their own expense.� If yes, How long does it take to become qualified? What is your estimated cost to become qualified?� This is for planning purposes and the Government considers engineering rough order of magnitude (EROM) estimates to be the appropriate level of detail for this effort. Provide a summary of capabilities (equipment, facilities, and personnel qualifications) to manufacture nine� CLB Ropeguards and identify any capital/facility/equipment upgrades required. NSWCCD intends to fulfill this requirement via a Cost-Plus-Incentive-Fee (CPIF) single-award five-year contract with an anticipated award date of Third Quarter, Fiscal Year 2023.� The Government plans to use a 50/50 share line for both over and under runs. Within reason, and with supporting rationale, do you have any recommendations on the share-line? 3. ��������� Contracting Office Address: Naval Surface Warfare Center Carderock Division 9500 MacArthur Boulevard West Bethesda, MD 20817-5700 Questions may be submitted to: Doug Riedel� � � � � � � � � � � � � � � � � � � � � � � � Abeer Ameer Contract Specialist� � � � � � � � � � � � � � � � � � � Branch Head douglas.a.riedel.civ@us.navy.mil� � � � � � � � abeer.j.ameer.civ@us.navy.mil 301-227-2959� � � � � � � � � � � � � � � � � � � � � � � 301-275-4537 Attachments: C24536000 Rev A; CLB Class Ropeguard Kit 8752861A; Advanced Propulsor Material Qualification Specification C245Q0001A; CLB ICCP Bonding Qualification Specification C245Q0002A; CLB Ropeguard DTM Type-01 Material Qualification Specification C245Q0003A; CLB Ropeguard Material Fatigue Qualification Specification
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c7c02837609949d9814c42bf6e04fe70/view)
- Place of Performance
- Address: USA
- Country: USA
- Country: USA
- Record
- SN06290116-F 20220407/220405230100 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |