Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 15, 2022 SAM #7441
AWARD

Y -- EAST CAMPUS BUILDING 4 (ECB4), FORT GEORGE G. MEADE, MARYLAND

Notice Date
4/13/2022 2:49:41 PM
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR-22-C-0012
 
Archive Date
04/28/2022
 
Point of Contact
Erica A. Eaton, Contract Specialist, Patricia Morrow
 
E-Mail Address
Erica.A.Eaton@usace.army.mil, patricia.morrow@usace.army.mil
(Erica.A.Eaton@usace.army.mil, patricia.morrow@usace.army.mil)
 
Award Number
W912DR22C0012
 
Award Date
04/13/2022
 
Awardee
BALFOUR BEATTY CONSTRUCTION, LLC VA 22042-4516 USA
 
Award Amount
697844325.00
 
Description
Maryland Procurement Office (MPO) has requested the United States Army Corps of Engineers Baltimore District�s assistance in executing the design and construction of East Campus Building #4 (ECB4) located on Fort Meade in Maryland. The program�s mission is classified. The period of performance for this construction project is 48 months. The scope of this contract will include the design and construction of a new multi-story 858,000 square foot facility as well as a 1,186,000 square foot parking structure. The primary facility will be comprised of a multi-story structure with full basement. The facility includes open office areas, support areas, collaborative multi-discipline workspace, computer labs and virtual instruction/distance learning enabled classrooms. Amenity spaces include physical fitness space, food venues, and dining area. The construction will consist of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm, and suppression; information technology infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interior build out will provide raised access floor systems, acoustically rated interior partitions and ceiling, power, lighting, and environmental control. The primary facility is not a standard design. The entire structure will be built to Sensitive Compartmented Information Facility (SCIF). The project includes redundant primary power and Uninterruptable Power Supply�UPS) systems to ensure continuity of operations. The project requires comprehensive interior design (CID). The site infrastructure will include primary electrical services to the site, water, sewer, and telecommunications pathways. The supporting facility includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, patios, and roads. Utility site construction will provide emergency backup power generation and cooling equipment. Perimeter security construction will extend existing perimeter fence line and surveillance capabilities. The facility will be required to be LEED Silver certifiable and comply with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as appropriate.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2606ed4063bf42148ef1795d849152a3/view)
 
Place of Performance
Address: Fort George G Meade, MD 20755, USA
Zip Code: 20755
Country: USA
 
Record
SN06296511-F 20220415/220414232720 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.