Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 15, 2022 SAM #7441
SOLICITATION NOTICE

Y -- CA FTBL Dumont Dunes (1) Dumont Dunes Road

Notice Date
4/13/2022 12:26:17 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000013
 
Response Due
4/27/2022 1:00:00 PM
 
Point of Contact
CFL Acquisitions
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOTAVAILABLE. PROJECT NUMBER:� CA FTBL DUMONT DUNES (1) PROJECT NAME:� DUMONT DUNES ROAD PROJECT DESCRIPTION:� The project is located approximately 70 miles southwest of Las Vegas, Nevada in the California desert, and is on primarily level terrain. The general scope is considered 3R and provides improvements to Dumont Dunes Road starting from the intersection with State Highway 127 and continuing east for 3.9 miles. A new road template will be established, and aggregate road base and an asphalt concrete pavement surface added for 3.1 miles. The 0.1-mile Little Dumont Dunes Road will have similar improvements starting from the intersection with State Highway 127 (approximately 3 miles south of Dumont Dunes Road). The last 0.75 miles of Dumont Dunes Road will be improved with aggregate road base. An existing low water crossing of the Armargosa River will be reconstructed. Schedule A consists of the first 3.1 miles of Dumont Dunes including the low water crossing, and Little Dumont Dunes. Option X consists of adding surface aggregate to the Incident Command Center parking area. Option Y consists of resurfacing the remaining 0.75 miles of Dumont Dunes Road past the low water crossing. SIGNIFICANT QUANTITIES (Schedule A): Line Item ����������������������������������������������������� Unit ��������������� Estimated Quantity PLACED RIPRAP� � � � � � � � � � � � � � � � � � � � �CUYD� � � � � � � � � � 500 ROADWAY AGGREGATE� � � � � � � � � � � � � � �TON� � � � � � � � � � �3,000 ROADBED RECONDITIONING� � � � � � � � � � �LNFT� � � � � � � � � �500 FULL DEPTH RECLAMATION� � � � � � � � � � � MILE� � � � � � � � � � 3.11 ASPHALT CONCRETE PAVEMENT� � � � � � �TON� � � � � � � � � � �8,100 (Option X): ROADWAY AGGREGATE� � � � � � � � � � � � � � � TON� � � � � � � � � � �440 (Option Y): ROADWAY AGGREGATE� � � � � � � � � � � � � � � TON� � � � � � � � � � �5,000 ESTIMATE: The anticipated cost range is between $2 - $5 million CONSTRUCTION DURATION:� Construction duration is estimated at approximately 4 months, from June to October of 2022. ADDITIONAL INFORMATION FOR NOTICE Anticipated advertisement in April of 2022 Anticipated bid opening in May of 2022 Anticipated Award in May of 2022 Anticipated Notice to Proceed in June of 2022 Construction must occur outside of the peak usage of the BLM property and start after Easter and end before November.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2fe79bac10cb4a1687d98b7523922f4c/view)
 
Place of Performance
Address: Baker, CA 92309, USA
Zip Code: 92309
Country: USA
 
Record
SN06297155-F 20220415/220414232731 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.