Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 20, 2022 SAM #7446
SOLICITATION NOTICE

Z -- Z--CERC A3 Main Building Stabilization

Notice Date
4/18/2022 7:33:00 AM
 
Notice Type
Solicitation
 
NAICS
238190 — Other Foundation, Structure, and Building Exterior Contractors
 
Contracting Office
OFC OF ACQUSITION GRANTS-NATIONAL RESTON VA 20192 USA
 
ZIP Code
20192
 
Solicitation Number
140G0121R0030
 
Response Due
4/29/2022 3:00:00 PM
 
Archive Date
05/14/2022
 
Point of Contact
Schneider, Kimberly, Phone: 0000
 
E-Mail Address
krschneider@usgs.gov
(krschneider@usgs.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 006 posts Question and Answers Amendment 005 extends response date and provide site visit POC. Amendment 004 schedules site visit for March 23, 2022 at 9:30 AM. Email Kimberly Schneider, krschneider@usgs.gov, if you plan to attend. Amendment 003 removes the Small Business set-aside; this acquisition is Unrestricted. The U.S. Geological Survey Columbia Environmental Research Center (CERC) in Columbia, Missouri has a requirement to stabilize their A3 Main Building to correct and prevent further settling of the building due to foundation and expansive soil deficiencies. The scope of work includes but is not limited to: Adding steel helical piles to shore up the foundation along the length of North and East perimeter at the corner and basement columns. Removal of high plastic clay beneath the slab, re-preparing the subgrade soil by moisture conditioning and compacting and reconstructing the slab. Replacement of below-slab mechanical air duct system. Rebuilding top several courses of load-bearing CMU and brick masonry walls where misaligned. Re-anchoring masonry wall to precast concrete roof planks. Removal, re-anchoring and reinstallation of existing aluminum and glass windows. Removal and replacement of sections of foamed-in-place roofing system at perimeter of the building. Replacing metal copings and flashing. Replacing interior partitions with new metal stud partition walls. Replacing existing interior lighting, controls, power and data, new interior floor, wall and ceiling. Removal and replacement of portions of existing concrete walk affected by the work. Restoring site lawn areas affected by the work. The contractor shall provide all labor, material, tools, equipment, and supervision necessary. Delivery date is NTP +180 calendar days. The magnitude of construction is between $500,000 and $1,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/760d14bba4a04aa29ef18a2cc31f466f/view)
 
Record
SN06300712-F 20220420/220418230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.