SOLICITATION NOTICE
59 -- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF
- Notice Date
- 4/22/2022 3:46:35 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038322QA054
- Response Due
- 5/22/2022 10:00:00 PM
- Archive Date
- 06/07/2022
- Point of Contact
- Telephone: 2156973770
- E-Mail Address
-
HAYDEN.YOUNG@NAVY.MIL
(HAYDEN.YOUNG@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N723.07|B5G|215-697-2928|hayden.j.young3.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS AFTER DELIVERY OF UNIT|45 DAYS FROM DETECT WAS FOUND||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2022)|13|336413|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A7 |X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Governmentfor all assets within the RTATs established in this contract. Required RTAT: 65 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any assetreceived after this date in days is not authorized for repair withoutbi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. Early and incremental deliveries accepted. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CIRCUIT CARD ASSEMB ;5998-01-189-8910; NSN , ;153D8487G2; Part Number, Shall be performed IAW: CIRCUIT CARD ASSEMB ;Latest; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS CIRCUIT CARD ASSEMB , ;89954; , ;153D8487G2; , 7RH 5998-01-189-8910 GF 3.1 Applicable Documents 3.1.1 The contractor shall perform the necessary work to return the subject item to Ready-For-Issue (RFI) serviceable operating condition and insure compliance with the requirements of the following drawings and specifications: 1. CIRCUIT CARD ASSEMB Drawing ( ;89954; ) ;153D8487G2; Rev ;latest revision; . 2. All inspections, evaluations, repair/overhaul, and testing functions shall be in compliance with: ;meets the technical specification of the original report; 3.2 Work Requirements: 3.2.1 All units determined by the contractor to be beyond economical repair (cost of repair/rework not to exceed ;80%; of the original cost of the item) shall bear a confirmation by DCMC and shall accompany the contract evaluation and quote to the Contracting Officer. In the event that an item is received with one or more subassemblies missing, the contractor shall promptly obtain confirmation of such finding from the DCMC (QAR) and upon confirmation notify the PCO 3.2.2 Acceptance testing shall be conducted under the surveillance of the DCMC (QAR). These tests shall include all tests necessary to assure that the material serviced conforms to the performance required to provide Ready-For-Issue material. The DCMC shall retain the authority to conduct or reconduct any tests deemed necessary to insure compliance with the applicable documents and specifications that are cited in paragraph 1 of the requirements section. 3.2.3 A copy of the DD Form 250 shall be packed with each unit processed under this contract. One copy of the DD Form 250 shall be forwarded to the Procurement Contracting Officer. 3.2.4 The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. T&E shall be conducted in accordance with the repair manual or specifications stated in section 1 of this statement of work. Based on the results of the T&E, severity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR). The contractor shall not begin work before receiving approval from the DCMC (QAR). 3.2.5 Upon receiving DCMC (QAR) approval, the contractor shall overhaul or repair the subject item to a Ready-For-Issue (RFI), serviceable operating condition and insure compliance with the requirements of the documents and specifications listed in paragraph 1 of the requirement's section. 3.2.6 For the purpose of the statement of work, ""Overhaul"" is defined as follows: All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in section 1. The contractor shall inspect all components and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with documents and specifications listed in section 1 of this SOW. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts. 3.2.7 For the purposes of this statement of work, ""REPAIR"" is defined as follows: Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition. All work shall be performed as outlined in the documents and specifications listed in section 1 of this SOW. The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits specified in the documents and specifications listed in section 1 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in section 1. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items. 3.2.8 Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment. 3.2.9 ;applies; Service change bulletins or modifications, except as specified herein, shall not be incorporated by the contractor without prior approval from the contracting officer. 3.2.10 ; ; Change modifications ; ; shall be incorporated for the items under this contract. Reworked/upgraded items will be reidentified as follows: ; ; 3.3 In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973. 3.4 Quality Assurance: 3.4.1 During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with MIL-I-45208, or equivalent (e.g. ISO-9001, ISO-9002, MIL-Q-95208) 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/c520a96b24594af19639ac279957e47f/view)
- Record
- SN06305672-F 20220424/220422230110 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |