Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 28, 2022 SAM #7454
SOLICITATION NOTICE

99 -- CABLE,RADIO FREQUEN

Notice Date
4/26/2022 12:42:37 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
SPRMM1 DLA MECHANICSBURG MECHANICSBURG PA 17055-0788 USA
 
ZIP Code
17055-0788
 
Solicitation Number
SPRMM122QWL51
 
Response Due
5/25/2022 10:00:00 PM
 
Archive Date
06/10/2022
 
Point of Contact
Telephone: 6146929937
 
E-Mail Address
KADIJATU.YANNI@DLA.MIL
(KADIJATU.YANNI@DLA.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|MIL-I-45208| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT|N/A|TBA|SPRMM1|TBA|TBA|TBA|TBA|TBA|TBA|TBA|||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| Any questions regarding this solicitation should be submitted in writing to the Contract Specialist, Kadijatu Yanni at Kadijatu.yanni@dla.mil ALL QUOTATIONS MUST BE VALID FOR 60 DAYS STARTING FROM THE CLOSING OF THE SOLICITATION DATE. See Section H for traceability remarks. Offerors must be registered in the System for Award Management (SAM). No awards will be made to offerors not registered. Registration can be accomplished through the following web link: http://www.sam.gov PLEASE PROVIDE EMAIL ADDRESS FOR FOLLOW UP COMMUNICATIONS __________________. RFID is only required if the ship to code identified above is listed at the website within DFARS 252.211-7006 PASSIVE RFID, at the time of shipment. Currently there are no locations listed that require passive RFID tagging. Inspection of material will be at: _____________________________________________________________________ Inspection of packaging and final acceptance of material will be at: ______________________________________________________________________ Any order resulting from this Request for Quotation will require electronic submittal of Receiving Reports and Invoices through PIEE-WAWF. Required Delivery is 491 days After Date of Contract. Quoted delivery is ____ days ADC. IF SUPPLIES WILL BE PACKAGED AT A LOCATION DIFFERENT FROM THE OFFEROR ADDRESS, THE OFFEROR SHALL PROVIDE THE NAME, STREET ADDR ESS, AND CAGE CODE OF THE PACKAGING FACILITY IF YOU ARE NOT THE MANUFACTURER OF THE MATERIAL YOU ARE OFFERING, YOU MUST STATE WHO THE MANUFACTURER IS (NAME & CAGE CODE) AND BE ABLE TO PROVIDE TRACEABILITY INFORMATION IF REQUESTED All contractual documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders and Modifications) related to the instant procurement are considered to be ""Issued"" by the Government when copies are either deposited in the mail, transmitted by Facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""Issue"" contractual documents as detailed herein. WHEN SUBMITTING QUOTES VIA EDI, MAKE SURE YOU SPECIFY ANY EXCEPTIONS (I.E. MIL SPECS/STANDARDS, PACKAGING, I&A, PACKAGING HOUSES, ETC.) OR FOLLOW UP WITH A HARDCOPY OF THE EXCEPTIONS. IF NOTHING IS INDICATED OR RECEIVED, AWARD WILL BE BASED UPON SOLICITATION REQUIREMENTS. CHANGES OR REQUESTS FOR CHANGES AFTER AWARD WILL HAVE CONSIDERATION COSTS DEDUCTED FROM UNIT PRICE 1. It is recommended that vendors provide contact information to NAVSUP WSS Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts / modifications are issued by DLA Maritime Mechanicsburg and posted on EDA. To receive these notifications, contact: NAVSUP WSS Code 025, Procurement Systems Design and Contract Support Division via email at NAVSUPWSSITIMPHelpDesk@navy.mil. Please include the following information with your request: CAGE code, company name and address and POC with phone number and email address. 2. Contractors can view their orders, contracts and modifications at the Electronic Document Access (EDA) web tool. This web tool is located at the Procurement Integrated Enterprise Environments web site. It is recommended that contractors register for EDA and Wide Area Work Flow at: https://wawf.eb.mil/piee-landing/. Click on New User and Registration. NOTICE TO SURPLUS SUPPLIERS: SUBMISSION OF YOUR QUOTE WITHOUT A SURPLUS CERTIFICATE WILL NULL AND VOID YOUR QUOTE. A SURPLUS MATERIAL CERTIFICATE MUST ACCOMPANY ALL QUOTES FOR SURPLUS MATERIAL. IF SUMBITTING QUOTE VIA EDI, PLEASE EMAIL A COPY OF THE COMPLETED SURPLUS CERTIFICATE TO THE BUYER POC LISTED ON THE SOLICITATION.//Drawings for this solicitation can be accessed via the website, www.SAM.gov. Click the Search button and type the solicitation number in the box and hit enter. Links to the solicitation should follow on the right. Click the BLUE LINK with the name of the item that is identified as the ""Updated Solicitation"". Click to the left on ""Attachments/Links"" which will take you to the link to request access to the drawings. Drawing access request should be submitted by the Data Custodian listed on your approved DD2345. Only the data custodian will be granted access to the controlled drawings. If there are problems accessing the drawings, please contact the buyer listed. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;Cable, RF Coaxial Electrical Outboard (Bulk), Type RG-293U; for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.1.2 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The ""Document Changes"" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-DTL-17J | | | |190222|A|2 | | DOCUMENT REF DATA=MIL-STD-973 | | | |000930|A| |04| DOCUMENT REF DATA=MIL-STD-130N | | | |121116|A| |01| DOCUMENT REF DATA=ISO 10012 | | | |030415|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |951103|A|2 | | DOCUMENT REF DATA=MIL-C-23020/1A | | | |680603|A| | | DOCUMENT REF DATA=MIL-DTL-23020 | | |C |051117|A| | | DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | DOCUMENT CHANGE DATA=MIL-C-23020 |MIL-DTL-23020 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;Cable, RF Coaxial Electrical Outboard (Bulk), Type RG-293U; furnished under this contract/purchase order shall meet the material, watertight, dielectric, electrical and physical requirements as specified in Military Specifications MIL-DTL-23020, MIL-C-23020/1A and MIL-DTL-17 including associated specifications mentioned in this procurement.; 3.1.1 ;Cables furnished under Military Specification MIL-DTL-17 shall be products which are qualified for listing on the applicable qualified products lists at the time set for opening of bids as required by MIL-DTL-17. Any changes in materials and construction (including requalification) of the applicable cable, which have been qualified, require written approval of NAVSUP WSS.; 3.1.2 ;The unit of product shall be 1000 feet of cable having the same type designation as defined in MIL-DTL-23020.; 3.2 ;Marking Requirements - The supplier shall permanently mark (identification) each production cable outer jacket surface lengths as specified in MIL-DTL-17. In addition, the supplier shall permanently ink mark (white ink) the production cable outer jacket surface lengths with ""FOR SUBMARINE USE-SQ/DCMA (QA)"" and shall be continuous for the full length of the cable and repeated at intervals not exceeding one foot per MIL-STD-130. The character types shall be block and have a height not to exceed 1/8 of an inch.; 3.3 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email matthew.ogilvie@navy.mil, Code 242MO after award of contract.; 3.3.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.4 Configuration Control - MIL-STD-973 entitled ""Configuration Management"", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.4.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.5 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a ""Warning Plate"" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier's written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110; 4.5 ;Finish - There shall be no marks or imperfections on the dielectric core which would prevent proper sealing with an O-ring as required by MIL-DTL-23020. ; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials as ordered for production units.; 4.7 ;Production Lot; 4.7.1 ;Quality Conformance Inspection - The supplier shall perform quality conformance examination, inspection and test on all completed production units cable in accordance with the requirements of MIL-DTL-17 (Groups A, B and C) as required by MIL-DTL-23020, and record all examination, inspection and test actual measurements and results. The supplier shall perform lot sample inspection on completed cable as defined in MIL-DTL-17. The sampling plan for the required number of samples for Groups A, B and C examination, inspection and test shall be selected in accordance with Lot Sampling Plans of MIL-DTL-17.; 4.7.2 ;The supplier shall perform 100% examination, inspection and test on all completed production units cable in accordance with the requirements of MIL-DTL-23020 and MIL-C-23020/1A, and record all inspection, examination and test actual measurements and results. ; 4.7.3 ;Visual and Mechanical Examination - The supplier shall monitor the diameters and out-of-roundness of the core and jacket on a continuous production basis by a suitable technique as specified in MIL-DTL-23020. The technique use including the detector, recorder, and associated units shall meet the requirements of MIL-DTL-23020. A two-pen strip chart recorder as required MIL-DTL-23020 shall permanently record the results. Each recording shall be identified as to the reel of cable to which it applies, and each recording shall be identified to within +/-2 feet of the corresponding point on the cable being measured as defined in MIL-DTL-23020. The dimensional recordings shall be individual identified and include all the required information as specified in MIL-DTL-23020.; 4.8 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ; 4.9 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR. NSWCPD shall either issue Specific Government Inspection Instructions or Inspection Hold Points based on whether DCMA or NSWCPD will be performing the required Inspections/Tests. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.10 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the construction and fabrication of ;Cable, RF Coaxial Electrical Outboard (Bulk), Type RG-293U;. Records shall be traceable by cable type and size, lot or batch, contract, manufacturer's QPL and reel number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.10.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the contract, manufacturer's QPL, cable lot or batch, reel number. Supplier format is acceptable for the below listed CDRLs. a. Certified Examination, Inspection and Test Reports for (Bulk Cable, Type RG-293U) shall be in accordance with the applicable requirements listed in specifications MIL-DTL-23020, MIL-C-23020/1A and MIL-DTL-17 (Conformance Inspection - Groups A, B and C). The reports shall show all the characteristics, the actual measurement and results of each examination, inspection and test including contract number, manufacturer's QPL number, name of supplier, specification number/date, cable type, lot or batch, reel number, test start and stop times, gauge serial number, gauge calibrated date/due date of finished bulk cable, item nomenclature and inspector's acceptance signature and date. CDRL: CERTIFIED EXAMINATION, INSPECTION & TEST REPORT per DI-NDTI-80809B b. Certificate of Compliance for the materials used in the construction and fabrication the completed cable in accordance with MIL-DTL-23020, MIL-C-23020/1A and MIL-DTL-17. CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-80678 c. Mercury Exclusion Certification (Representing the contract units shipment). CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-80678; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a ""Distribution Statement"" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.2 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for ""Official Use Only"" and ""NOFORN"" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. P/N: MIL-C-23020 TYPE RG 293U DATE OF FIRST SUBMISSION=ASREQ ;APPROVAL OF THE QUALITY INSPECTION PLAN BY NSWC PHILADELPHIADIVISION IS REQUIRED PRIOR TO PRODUCTION.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A001.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;REPORT SHALL BE IN ACCORDANCE WITH MIL-DTL-23020, MIL-C-23020/1A AND MIL-DTL-17.; ;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;CERTIFICATION SHALL BE IN ACCORDANCE WITH MIL-DTL-23020, MIL-C-23020/1A AND MIL-DTL-17.; ;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".; DATE OF FIRST SUBMISSION=ASREQ ;SUPPLIER FORMAT IS ACCEPTABLE.; ;APPROVAL OF THE CERTIFICATION BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004. NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS ""N64498"".;
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/48e5c48b2ea54d7fb2c30d9707e3694a/view)
 
Record
SN06308775-F 20220428/220426230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.