SOURCES SOUGHT
Z -- DLA � Energy (DLA-E) Okinawa Japan contingency plan which outlines how to offload fuel/distribute the fuel to warfighters/other customers in event of catastrophic failures of DLA � E offload systems, valve boxes, and pipelines, under various scenarios.
- Notice Date
- 4/27/2022 6:35:51 AM
- Notice Type
- Sources Sought
- NAICS
- 541330
— Engineering Services
- Contracting Office
- FA8903 772 ESS PK JBSA LACKLAND TX 78236-9861 USA
- ZIP Code
- 78236-9861
- Solicitation Number
- FA8903-22-SS-27042022
- Response Due
- 5/11/2022 12:00:00 PM
- Archive Date
- 05/12/2022
- Point of Contact
- Nicholas Madrid, Eva Garcia
- E-Mail Address
-
nicholas.madrid.3@us.af.mil, eva.garcia.2@us.af.mil
(nicholas.madrid.3@us.af.mil, eva.garcia.2@us.af.mil)
- Description
- DLA Energy Okinawa operates two major offload buoys system at Kin Bay, six tank farms and over 72 miles of fuel pipelines to accomplish the bulk fuels mission. The 72 miles of cross-country pipelines are interconnected by 63 valve boxes dispersed around the island of Okinawa, Japan. Jet Propellent 5 and 8 (JP-5 and JP-8) fuel are offloaded from Tengan Ocean Terminal Support via ocean tankers to various tank farms. DLA � E operates five tank farms, Chimuwan Tank Farm 1, 2, and 3, and Kuwae 1 and 2, are interconnected and the flow of fuel can interchange between these 5 tank farm terminals. The sixth tank farm is located at White Beach and is an isolated system. White Beach Tank Farm stores F-76 Diesel and offloads fuel via two fuel pier. The contractor shall provide all labor, materials, equipment, tools, transportation, supervision, and any other items necessary to conduct this contingency plan investigation. Contractor shall have the appropriate level of security clearance (TBD), licenses, certifications, tools, and expertise to perform duties as required. Major Task of this requirement are listed below: TASK 1: Failure of both Single Point Mooring (SPM)/Multi-Buoy-Mooring (MBM) contingency plan TASK 2: Failure of one offload system, SPM/MBM contingency plan TASK 3: SPM/MBM mitigation plan TASK 4: Sandtrap, Pipe Pit (PPIT), and Valve Box (VB) 1 TASK 5: Valve Box Contingency Plan TASK 6: White Beach (WB) Pier Contingency Plan TASK 7: White Beach Valve Box and Manifold Contingency Plan TASK 8: Chimuwan Tank Farm 1 TASK 9: Chimuwan Tank Farm 2 TASK 10: Chimuwan Tank Farm 3 TASK 11: Kuwae Tank Farm 1 TASK 12 Kuwae Tank Farm 2 All task details are included in the attached Draft PWS
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/2d1ac8804bb04b9987c25824dfcbc012/view)
- Place of Performance
- Address: Okinawa , JPN
- Country: JPN
- Country: JPN
- Record
- SN06310357-F 20220429/220427230104 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |