SOLICITATION NOTICE
Y -- COARNG - National Guard Readiness Center - 100th Missile Defense Brigade - PN080295 - Amendment 01
- Notice Date
- 4/29/2022 3:46:33 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- W7MY USPFO ACTIVITY CO ARNG AURORA CO 80011-9551 USA
- ZIP Code
- 80011-9551
- Solicitation Number
- W912LC-22-B-0001
- Response Due
- 4/29/2022 12:00:00 PM
- Archive Date
- 05/14/2022
- Point of Contact
- Sabrina M. DeRamus, Phone: 7202504031, James S. Rawlings, Phone: 7202504034
- E-Mail Address
-
sabrina.m.deramus.civ@army.mil, james.s.rawlings.civ@army.mil
(sabrina.m.deramus.civ@army.mil, james.s.rawlings.civ@army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- 29 April 2022 - Mod 6 - Updated to add the Abstract of Offers Construction OF 1419 and Bid Opening Attendance Roster. ___________________________________________________________________ 28 April 2022 - Mod 5 - Clarification on Conflicting Language for the SSHO and QCM Positions Spec Section 01 00 00 and Section 01 35 26 1.6.1.1.1 _____________________________________________________________________ 27 April 2022 - Mod 4 - Clarification on RFI Response #32 and Windows on A-652 ____________________________________________________________________________________________________ 26 April 2022 - Mod 3 - The purpose of this posting is to add three clarifying RFIs as well as the associated drawings and specs under A-201, A-202, A-653, and M-641. _____________________________________________________________________________________________________ 22 April 2022 - Mod 2 - Amendment 01 issued -�The purpose of this amendment is adjust the number of days for acceptance of offers and to issue an addendum in response to Requests for Information (RFI) received. 1. Block 13, paragraph D. has been changed from 180 days to 60 days for the acceptance of offers 2. Addendum 01 has been added that does the following: � �a. Added Bidder RFI Responses to all questions received - 72 questions total � �b. Incorporates Project Manuals Revisions � �c. Incorporates Draw ing Revisions 3. Add paragraph 6.3 to ""Instructions to Bidders"", Section 00100, for information to register/access Buckley Space Force Base for the Bid Opening. All other terms and conditions remain unchanged. __________________________________________________________________________________ 7 April 2022 - Mod 1 - Updated to add Pre-Bid/Site Visit slides and attendance sign in sheets. ___________________________________________________________________________________ The United States Property and Fiscal Office for Colorado located in Aurora, Colorado is issuing an Invitation for Bid (IFB) W912LC-22-B-0001, to award a single firm fixed-price (FFP) construction contract for non-personal services, to provide all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete the construction of a new National Guard Readiness Center for the Missile Defense Brigade on Peterson Space Force Base, Colorado. DESCRIPTION OF PROJECT: In general, the scope of the project consists of the full development of the <2-acre Readiness Center site will include an 33,338 square foot primary facility that will contain office space, OCIE storage, a secure area, specialized network server room, breakroom, and restrooms. The facility is designed to a minimum life of 50 years IAW UFC 1-200-02 and will be in compliance with DoD Minimum Antiterrorism (AT/FP) building standards, UFC 4-010-01 and UFC 4-010-02. The facility structure will be constructed as steel-framed, non-rated construction, Type IIB per IBC 602.2 and Tables 601/602. Construction consists of a two story building, steel structure consisting of columns, beams, and bar joists with concrete topped decking system for the second floor. Perimeter walls will comprise of light gauge steel infill, with selective locations strap braced for lateral resistance. The roof will be bar joists with a steel roof deck to support mechanical rooftop equipment and future rooftop solar collectors. The roof system has open web steel joists spanning between the wide flange beams. On top of the joists will be a light gauge steel decking attached to the joist to resist wind uplift loads and transmit lateral loads as a diaphragm system. The project includes concrete floors, specialty finishes, energy efficient mechanical and electrical equipment with automated HVAC and building controls; the buildings will be constructed to support a future renewable-energy source that would be installed under a separate project (rooftop solar collectors), and will be constructed to obtain a LEED certified Silver rating in accordance with USGBC LEED certification. Supporting facilities include, but are not limited to all required utility services, all site work, fire detection and alarm systems, emergency generator, potential for electric (photovoltaic), potential geothermal heating, access roads/sidewalks/curb & gutter, storm drainage, POV parking, landscaping, lightning� sediment and erosion control, storm water management, and any needed site improvements. The project also includes security access, signage, electrical power, lighting and lighting controls systems, telecommunications infrastructure, plumbing systems, fire suppression and fire alarm/mass notification systems as shown in the contract documents. The grading around the new facility will provide positive drainage away from the building with accessible sidewalk for building access.� All site development and utilities shall be in accordance with Peterson Space Force Base CE (Civil Engineering) and IBC requirements. Foundations for the 100th MDB RC building are shallow foundations under gravity columns with square foundation pads. Including ground floors with cast in place concrete slab-on-grade over reconditioned soil in accordance with the geotechnical recommendations. The project is located on a <2-acre site near Patrick Street and Peterson Boulevard at Peterson Space Force Base, Colorado Springs, Colorado. OPTION(S): 1. Entry and Common Space Enhancements, 2. Envelope Enhancements, 3. Landscape Enhancements, 4. POV Parking Lot Expansion, 5. Additional Excavation and Structural Fill, and 6. Upgraded Mechanical Equipment. BRAND NAME: This project requires the use of some brand name specific products. The justifications are posted to the solicitation. Brand name products for this acquisition will include: 1. Best Lock Cores � Door lock hardware 2. CommScope � CommScope Cabling Products 3. Johnson Controls � Energy Management Control System (EMCS) and Building Control System (BCS) 4. Edwards Systems Technology (EST), Model EST3 panel - Fire Alarm System 5. AMAG Access Control System and Intrusion Detection System 6. American Power Conversion � Uninterrupted Power Supply (UPS) CONSTRUCTION MAGNITUDE: Construction magnitude of the project is between $10,000,000 and $25,000,000.00 in accordance with FAR 36.204. PERIOD OF PERFORMANCE: Construction/contract completion time is anticipated to take up to 540 calendar days after notice to proceed, to include inspection and punch list. TYPE OF CONTRACT AND NAICS: This IFB will be for one (1) FFP construction contract. The North American Industry Classification System (NAICS) code for this work is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This action is being procured on a TOTAL SMALL BUSINESS SET ASIDE basis. The small business size standard is $39.5 million. LIMITATIONS ON SUBCONTRACTING: Your attention is directed to FAR clause 52.219-14 (e)(3) (DEVIATION 2021-O0008, LIMITATIONS ON SUBCONTRACTING, which states ""By submission of an offer and execution of a contract, the Offeror /Contractor agrees in performance of the contract in the case of a contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded�, applies to this project. Interested offerors are encouraged to attend the Pre-Bid Conference. A site visit will follow the conference. Date, time, and instructions to attend the pre-bid conference/site visit can be found in Section 00100-Instructions to Bidders, of the Solicitation document. Interested contractors are highly encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. All questions for the pre-bid conference must be submitted by March 30, 2022 via email to james.s.rawlings.civ@army.mil and Sabrina.m.deramus.civ@army.mil. All questions for proposal submission will be due no later than April 15, 2022 by 11:00 am MT. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.sam.gov. You will need your DUNS number register. Instructions for registering are on the web page (there is no fee for registration). Please note that due to recent fraudulent activity, the process for fully activating a registration at SAM has changed, and now requires the submission of a notarized letter to GSA. See the following link for additional information and the latest updates to this process: https://www.gsa.gov/samupdate. PLAN ACCORDINGLY! The bid opening is scheduled for April 29, 2022. Actual dates and times are identified in the solicitation as well as the location on Buckley Space Force Base. Interested offerors must be registered in the System for Award Management (SAM). To register go to www.sam.gov. Instructions for registering are on the web page (there is no fee for registration). The solicitation and associated information and the plans and specifications will be available only from the Contract Opportunities page at SAM.gov. Plans and Specifications will be available as a ""controlled� package. These type of attachments require special handling due to the information they contain. You are not allowed to access controlled attachments unless your account is associated with an entity that has been certified by the Joint Certification Program. You will not immediately be permitted to view the document. Your entity�s Data Custodian is the only individual authorized to access to the attachment(s). Your entity is responsible for managing the documents in accordance with prescribed directives. If your entity is not certified by the Joint Certification Program, you can go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/ to enroll. There is a link for completing DD Form 2345. Please note that the form must be mailed along with additional information, and approval can take several weeks, please start the process now! � DISCLAIMER: The official plans and specifications are located on the official government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror�s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror�s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/152709aab3bc43ff9bcc6f29ef105692/view)
- Place of Performance
- Address: Colorado Springs, CO 80914, USA
- Zip Code: 80914
- Country: USA
- Zip Code: 80914
- Record
- SN06312694-F 20220501/220429230058 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |