SOLICITATION NOTICE
Y -- AZ NP GRCA 272(1) Mather Point Campground Loops
- Notice Date
- 5/5/2022 10:24:52 AM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF22B000017
- Archive Date
- 05/25/2022
- Point of Contact
- Leslie Karsten, Sheri Walsh
- E-Mail Address
-
CflContracts@dot.gov, CflContracts@dot.gov
(CflContracts@dot.gov, CflContracts@dot.gov)
- Small Business Set-Aside
- HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- Description
- THIS IS NOT A REQUEST FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT IS BEING ADVERTISED AS A HUB-ZONE SET ASIDE. PROJECT NUMBER:� AZ NP GRCA 272(1) PROJECT NAME: �Mather Point Campground Loops PROJECT DESCRIPTION:� The AZ NP GRCA 272(1), Mather Point Campground Loops project is located in Grand Canyon Village approximately 22 miles west of the Grand Canyon East Entrance in Coconino County, AZ. The project is proposing to rehabilitate (3R) campground roads and campsite parking stalls at the Mather Point Campground within the South Rim of the Grand Canyon National Park. The project is broken up into one schedule with two options, described below. SCOPE OF THE WORK:� The project is proposing to rehabilitate (3R) approximately 2.37 miles of campground roads along with several campsite parking stalls. The roads and parking stalls need rehabilitation due to deterioration that is typical of aging pavements. The existing pavement within the Mather Point Campground is paved and in poor condition with roadway cracking and aggregate surfacing. Schedule A work for this project includes Juniper Loops 1 & 2, Maple Loop, and Oak Loops 1 & 2, for an approximate length of 1.51 miles. Option Y includes Pine Loop for an approximate length of 0.47 miles. Option Z includes Sage Loops 1, 2, 3, & 4 for an approximate length of 0.39 miles. PRINCIPAL WORK ITEMS: Schedule A: 30202-2000 Roadway Aggregate, Method 2: 1,200 TON 30402-1000 Full Depth Reclamation, Method 1: 25,000 SQYD 40301-0100 Asphalt Concrete Pavement, Type 1: 5,500 TON Option Y: 30202-2000 Roadway Aggregate, Method 2: 350 TON 30402-1000 Full Depth Reclamation, Method 1: 7,500 SQYD 40301-0100 Asphalt Concrete Pavement, Type 1: 2,000 TON Option Z: 30202-2000 Roadway Aggregate, Method 2: 210 TON 30402-1000 Full Depth Reclamation, Method 1: 4,600 SQYD 40301-0100 Asphalt Concrete Pavement, Type 1: 1,000 TON ANTICIPATED SCHEDULE:� Advertisement: May 2022 Contract Award: July 2022 Notice to Proceed: August 2022 Construction Complete: November 2022 ESTIMATED COST RANGE:� The proposed project is estimated at a cost between $2 million and $5 million. FUNDING SOURCE:� Park Service Interagency Agreement MISCELLANEOUS: Roadway closures are permitted with 7 days advance notice, and each loop will be closed sequentially. Only one loop can be closed at a time, unless otherwise allowed by the CO and the NPS. The mainline road and all other loops will remain open during construction of each loop. Weekend work on roads will not be allowed after June 1, 2022. Weekend work may be requested for periods of light visitation through June 1, 2022. Request the allowance of weekend operations at least 3 days in advance to schedule inspection services. Requests with less than 3 days of notice may be disallowed.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/48e73b1cb87a4f6c8ec7ad12248fee9c/view)
- Place of Performance
- Address: Grand Canyon, AZ, USA
- Country: USA
- Country: USA
- Record
- SN06318462-F 20220507/220505230103 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |