Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 25, 2022 SAM #7481
SOURCES SOUGHT

Y -- CA FTFW SOBO TRAIL (1) ROCK HILL TRAIL

Notice Date
5/23/2022 8:51:39 AM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22SS0024
 
Response Due
6/1/2022 1:00:00 PM
 
Point of Contact
Sheri Walsh, Phone: 7209633500, Sheri Walsh, Phone: 7209633500
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman Owned Small Business concerns, 8(a) Small Businesses, or Service-Disabled Veteran-Owned Small Businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Contractors MUST submit the following by e-mail to CFLContracts@dot.gov (Attn: Kelly Palmer) for receipt by close of business (2 p.m. local Denver time) on June 1, 2022:� The subject line must have the Notice ID 6982AF22SS0024 and Project Name CA FTFW SOBO TRAIL (1) ROCK HILL TRAIL (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) �A copy of the letter from SBA stating date of HUBZone Small Business certification or acceptance to the 8(a) Small Business program. In the case of a Service-Disabled Veteran Owned Small Business, you must provide eligibility (DD Form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility. � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $2 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of trail construction projects of equal or greater value and scope to the CA FTFW SOBO TRAIL(1) �project in which you performed (as the prime contractor) work in areas of public access and in natural resource sensitive areas.? Experience in construction phasing, public access control, and timely completion of construction is required.?State whether your firm was the prime contractor or subcontractor on the project.? DO NOT SEND INFORMATION ON PROJECTS THAT�DO NOT INCLUDE THE ABOVE WORK.�� The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at lease 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone prime contractor may not however subcontract more than 50% of the coast of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT NUMBER: CA FTFW SOBO TRAIL (1) PROJECT NAME:� ROCK HILL TRAIL The project is located in the Sonny Bono Salton Sea National Wildlife Refuge in California�s Imperial Valley, approximately 90 miles southeast of Palm Springs, CA on the south side of the Salton Sea.� The project consists of rehabilitation of approximately one mile of the existing, natural surface Rock Hill Trail to provide Architectural Barriers Act (ABA) compliant access.� Selective clearing of Salt Cedars will occur along portions of the trail and a new overlook will be constructed at the base of Rock Hill.� Trail rehabilitation is included at two additional sites along with parking lot improvements including new sidewalk and ABA parking.� Construction improvements will also include clearing and grubbing, trail and parking lot signage, benches. PRINCIPAL WORK ITEMS INCLUDE: Roadway Aggregate Method 2� � � � � � � � � � � � � � � � � � � �2,200 TON Roadway Reconditioning� � � � � � � � � � � � � � � � � � � � � � � � 8,000 SQYD Selective Clearing and Grubbing� � � � � � � � � � � � � � � � � � �2.5 ACRE Embankment Construction� � � � � � � � � � � � � � � � � � � � � � � 500 CUYD Separation-Stabilization Geotextile, Class 1, Type A� � � �8,100 SQYD Accessibility Ramp, Timber� � � � � � � � � � � � � � � � � � � � � � � 1 EACH Work along this route will take place within environmentally sensitive areas and will require interactions with the US Fish and Wildlife Service (USFWS). Trails can be closed during construction if construction activities do not occur during peak visitation season which is from November to March. The anticipated advertisement date for the project is August 2022 with construction anticipated from March 2023 to July 2023.� The proposed project is estimated at a cost between $700,000 and $2,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c7931e6772c640feadd2784dbc493617/view)
 
Place of Performance
Address: Calipatria, CA 92233, USA
Zip Code: 92233
Country: USA
 
Record
SN06335887-F 20220525/220523230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.