SPECIAL NOTICE
Y -- Manhattan Balance of Work VAMC Manhattan NY
- Notice Date
- 5/24/2022 1:32:59 PM
- Notice Type
- Special Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) WASHINGTON DC 20420 USA
- ZIP Code
- 20420
- Solicitation Number
- 36C10F22R0049
- Archive Date
- 07/23/2022
- Point of Contact
- Miranda Butzlaff, Contracting Specialist, Phone: 202-400-5639
- E-Mail Address
-
miranda.butzlaff@va.gov
(miranda.butzlaff@va.gov)
- Awardee
- null
- Description
- Dear Prospective Contractor: This is a Special Notice and preliminary notice for the Industry Day Forum for the forthcoming RFP (Request for Proposal) for a Design-Bid-Build Construction Contract to construct the Manhattan Hurricane Sandy Recovery Program Balance of Work at the VAMC Manhattan Campus, NY. VA will host an Industry Day Forum to discuss the upcoming procurement. This Industry Day Forum will be used for market research to give Office of Construction and Facilities Management (CFM) the opportunity to engage with contractors to determine overall interest in the project, experience with design-bid-build construction, capacity to successfully accomplish the work, and small business participation. Project Description: VA has a requirement to construct the Manhattan VAMC, Hurricane Sandy Recovery Program Balance of Work at the VAMC Manhattan Campus of the VA NY Healthcare System as summarized herein and further defined in the future bid documents and General Requirements. All work is located on the campus of the fully operational Manhattan VA Medical Center at 423 E. 23rd Street, Manhattan, NY. The approximate period of performance is 5 years. The General Scope of Work (SOW) includes, but is not limited to, providing all labor, materials, and equipment for the following tasks per Construction Documents (CDs): Relocate all essential electrical equipment and systems prone to damage by flooding on the ground floor of Buildings 1, 2, 3 and 6 to the first floor to include interrupter switches, transformers, switchgear, and distribution branch circuit panel boards. Construct new elevated steel-frame generator platform with enclosure built on auger-cast piles to meet VA Physical Security Design Manual. Procure and install new generators and associated underground fuel tanks Construct steel frame electrical distribution substation vault for Building 1 on structural concrete mat slab and pile caps on existing structural pilings. Construct and complete electrical rooms on the first floor of Buildings 1 and 6. Complete electrical cutovers and tie-ins from existing building distribution system to new equipment in Substation 6 Make new electrical cutovers and tie-ins to new Substation 1 and generator platform equipment. Complete final renovations to ground floor to include updates to warehouse and loading dock, creation of office space, locker room and restroom facilities, egress corridor and updates of life-safety systems. Replace third floor kitchen walk-in refrigerators and freezers. Mitigate Asbestos Containing Material (ACM) and HazMat in interior and exterior construction areas. Remove contaminated soils and dewater and treated contaminated groundwater. Construct new in-ground lift-type security vehicle barrier. Install Variable Refrigerant Flow (VRF) HVAC system on the Ground Floor of Building 2 Add wet fire suppression protection system on the first and second floors of Building 2 Remove non-compliant door entering directly into a Stair from room 124A in Building 2. Stair #2 Complete installation of HVAC system at Telecom rooms TR-C, TR-D and TR-E. Build-out staff Locker Rooms, Break Room and Break Room Unisex Toilets within space of the existing switchgear room G502 Remove existing domestic water pumps in Room G0175S and install raised triplex pump skid. Build out new public Women s Toilet Room at the existing electrical / former fire command center room G383/0275N. Build out new Mechanical rooms in the Building Support and future Sim Lab and install HVAC systems for the Pharmacy Cache G951, Building Support G953, and shell space for the Future Sim Center G614 and Future Conference Center G613. Complete work at the under-side of Stair 1-1 to restrict VAMC s non-code compliant storage under an egress stair and install a 2-hour rated horizontal partition assembly to isolate the remaining systems that could not be relocated. Modify the existing GF2B area to correct life safety issues. These include the following: Corridor G113 unlevel landing / tripping hazard at egress door from Stair 121W. Corridor G113 wire mesh partition installation to prevent access to fall hazard at the air intake well to Mechanical Room G500A. Stair 1121W door swing with the revised direction of exit access. Stair 1121W partition demolition to remove an existing reduction in egress width violation. Shaft 715; replacement / installation of a rated door and associated hardware. Perform existing MRI electrical cut-over to Vault 6 Substation Provide electrical cutovers and relocate equipment for existing Hybrid OR. All construction work to be done according to approved Phasing Plan. Work activities will require off-hour working schedules including evenings and weekends based on hospital operations. An ""Industry Day"" has been scheduled for June 9, 2022 at 10:00 a.m. Local time at VAMC Manhattan Campus, NY first floor Atrium (Auditorium) located at: 423 E 23rd St, New York, NY 10010 This event will provide background and more specific information on the project. This Industry Day Forum will be used for market research to give CFM the opportunity to engage with contractors to determine overall interest in the project, experience with design-bid-build construction, capacity to successfully accomplish the work, and small business participation. Please respond with your intent to attend to Miranda Butzlaff, Contract Specialist at miranda.butzlaff@va.gov. Immediately following the industry day, CFM will provide contractors the ability to meet with contracting and project management staff for one-on-one exchanges. All interested contractors shall submit via email a request for one-on-one exchanges to Miranda Butzlaff, Contract Specialist at miranda.butzlaff@va.gov no later than June 6, 2022, 10:00 a.m. ET. All questions and presentations from the Industry day will be made available through an amendment to this notice that will be posted on www.FBO.gov.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/b81c5125f22e4dc7bfa695ca11332483/view)
- Record
- SN06336298-F 20220526/220524230119 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)