SOLICITATION NOTICE
Y -- Minot AFB Helo Ops Facility
- Notice Date
- 6/2/2022 12:17:49 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
- ZIP Code
- 68102-4901
- Solicitation Number
- W9128F22R0048
- Response Due
- 6/16/2022 12:00:00 PM
- Archive Date
- 07/01/2022
- Point of Contact
- Shawn Adkins, Glenda Canty
- E-Mail Address
-
shawn.a.adkins@usace.army.mil, glenda.a.canty@usace.army.mil
(shawn.a.adkins@usace.army.mil, glenda.a.canty@usace.army.mil)
- Description
- AMENDMENT 0002: 02 June 2022 Solicitation No. W9128F22R0048 Date of Issue: 15 APR 2022 Date of Receiving Proposals: 16 JUN 2022 SUBJECT: Amendment No. 0002 to Request for Proposal Solicitation Package for Construction of�Consolidated Helo/TRF/OPS AMU & Alert Facility TO: Prospective Offerors and Others Concerned 1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly). a. Specifications. (Descriptive Changes.) (1) Section 21 13 13.00 10 Paragraph 1.4, Delete �21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS.� (2) Section 21 13 17.00 10 Paragraph 1.4, Delete �21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS.� (3) Section 21 13 18.00 10 Paragraph 1.2, Subpart b. � add the following sentence: �Provide as many pre-action zones as required in the hangar bays to meet NFPA requirements on water delivery times and system volume requirements.� (4) Section 21 13 18.00 10 Paragraph 1.2, Remove �.2 gpm/square foot� and replace with �.3 gpm/square foot�. Remove �5,000 square feet� and replace with �4,600 square feet�. (5) Section 21 13 18.00 10 Paragraph 1.4, Delete �21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS.� (6) Section 21 30 00. Paragraph 1.2.1, Remove �to 185 psi� and replace with �10 psi below system pressure and�. Remove �or HEF system.� (7) Section 21 30 00. Paragraph 1.2.2, Remove �to 190 psi� and replace with �5 psi below system pressure.� Remove �210 psi� and replace with �5 psi above system pressure.� (8) Section 21 30 00. Paragraph 1.4, Delete �21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS.� (9) Section 28 31 76. Paragraph 1.1, Removed �Section 21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS� (10) Section 28 31 76. Paragraph 1.3, Revised the long-form reference for �UFC 4-211-01�: �(2017; with change 3, 2021) Aircraft Maintenance Hangars� (11) Section 28 31 76. Paragraph 1.7, Removed �21 13 23 HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS� (12) �Section 28 31 76. Paragraph 1.7, SUBMITTALS: SD-02 Shop Drawings - Removed �Emergency� Foam/Water System Shutdown Signs; G, RO� (13) �Section 28 31 76. Paragraph 1.7, SUBMITTALS: SD-03 Product Data - Removed �Manual Foam Start� Stations; G, DO�, ��Manual Foam Stop Stations; G, DO�, ��Foam Discharge Visual Notification� Appliances; G, DO�, and ��Rotating Beacon Contactor; G, DO� (14) �Section 28 31 76. Paragraph 2.1.2, Removed �Foam Beacon Lighting Contactor� (15) �Section 28 31 76. Paragraph 2.3.1, Item c, removed �and foam release beacons� (16) �Section 28 31 76. Paragraph 2.3.3, Section removed in its entirety. �Title replaced with �� to avoid renumbering of subsequent subparts. (17) �Section 28 31 76. Paragraph 2.3.4, Removed �Actuation of the foam/water riser shall not� activate the preaction system.� (18) �Section 28 31 76. Paragraph 2.4.1, Removed �and high expansion foam�, ��The high expansion� foam riser tamper switches shall produce a distinct ""FOAM SYSTEM DISABLED"" supervisory signal.�,� and ��The high expansion foam riser(s) water flow/pressure switches shall be monitored by the� FACP.� (19) �Section 28 31 76. Paragraph 2.5.3, Item f, revised �cubicle� to �ceiling� (20) �Section 28 31 76. Paragraph 2.7, Removed �Install releasing modules and monitor modules� integral to the release of the foam system in a conditioned space within the building.� (21) �Section 28 31 76. Paragraph 2.8, Removed �Install releasing modules and monitor modules� integral to the release of the foam system in a conditioned space within the building.� (22) �Section 28 31 76. Paragraph 2.9, Removed �Install releasing modules and monitor modules� integral to the release of the foam system in a conditioned space within the building.� (23) �Section 28 31 76. Paragraph 2.16.5.2, Item b(2), removed �FOAM/�. Item I, changed �four� to� �for�. (24) �Section 28 31 76. Paragraph 2.17, First paragraph removed �foam/water and�. Last� paragraph/last sentence, removed �foam agent� (25) �Section 28 31 76. Paragraph 2.22, Removed �Manual fire alarm stations and manual foam start� stations shall be separated by a minimum of 5 feet and shall be located on opposite sides of the� doors except where indicated on the FA drawings.� (26) �Section 28 31 76. Paragraph 2.22.2, Section removed in its entirety. �Title replaced with �� to avoid� renumbering of subsequent subparts. (27) �Section 28 31 76. Paragraph 2.22.3, Section removed in its entirety. �Title replaced with �� to avoid renumbering of subsequent subparts. (28) �Section 28 31 76. Paragraph 2.23, Removed �Foam beacons and� (29) �Section 28 31 76. Paragraph 2.23.5, Section removed in its entirety. �Title replaced with �� to avoid renumbering of subsequent subparts. (30) �Section 28 31 76. Paragraph 2.32, Removed �Any two optical flame detectors in alarm� simultaneously shall result in a foam suppression release.� and �With the exception of a manual� foam release station, the cross-zoning of two optical flame detectors in the hangar bay shall be� required to release the foam suppression system.� (31) �Section 28 31 76. Paragraph 2.33, First paragraph removed two instances of �foam/water�.� Second paragraph revised first sentence to read as follows: �Locate the disconnect switch in Fire� Suppression Equipment Rooms in readily accessible locations near the solenoid/control valve.�.� Second paragraph, removed ��DISABLE FOAM SYSTEM� or� (32) �Section 28 31 76. Paragraph 3.6, Removed �Foam: Blue� (33) �Section 28 31 76. Paragraph 3.7, Section removed in its entirety. �Title replaced with �� to avoid renumbering of subsequent subparts. (34) �Section 28 31 76. Paragraph 3.84, First paragraph removed �AND FOAM/WATER�. First paragraph� removed �FLOW OF FOAM IS NOT REQUIRED AND VALVES MAY BE CLOSED AHEAD OF THE SOLENOID TO BLOCK THE� FLOW OF FOAM. �WATER SHALL FLOW THROUGH THE FOAM TEST HEADER.�. Second paragraph, removed �21 13 23� HIGH EXPANSION FOAM (HEF) FIRE SUPPRESSION SYSTEMS,� b. � Specifications �(New �and/or �Revised �and �Reissued). � Delete �and substitute or add� specification pages or sections as noted below. The substituted pages or sections are revised and� reissued with this amendment. �For convenience, on the revised specification pages, changes have� been identified by �[*Am- 2]�(underlining of added text and/or strikeout of deleted text). Pages or Sections Deleted � � � �Pages or Sections Substituted or Added 00 22 00 � � � � � � � � � � � � �00 22 00* REGISTER � � � � � � � � � � � � REGISTER* ND20220031 � � � � � � � � � � � ND20220031* ND20220043 � � � � � � � � � � � ND20220043* ND20220054 � � � � � � � � � � � ND20220054* 21 13 23 � � � � � � � � � � � � ** ** ** c. �Drawings (Reissued). �The following drawings are revised with latest revision date indicated on� each sheet and reissued with this amendment. (1) � Sheet FA001, FIRE ALARM GENERAL NOTES AND SUPPLEMENTAL LEGEND (2) � Sheet FA002, FIRE ALARM KEYED NOTES (3) � Sheet FA111, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA A (BASIC) (4) � Sheet FA112, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA B (5) � Sheet FA113, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA C (6) � Sheet FA114, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA D (7) � Sheet FA115, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA E (8) � Sheet FA116, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA F (9) � Sheet FA117, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA G (10) �Sheet FA118, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � AREA H (11) �Sheet FA119A, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � HANGAR BID OPTION �WEST� (12) �Sheet FA119B, FIRE ALARM INITIATION AND CONTROL PLAN FIRST FLOOR � HANGAR BID OPTION �EAST� (13) �Sheet FA211, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA A (BASIC) (14) �Sheet FA212, FIRE PLAN VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA B (15) �Sheet FA213, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA C (16) �Sheet FA214, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA D (17) �Sheet FA216, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA F (18) �Sheet FA217, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA G (19) �Sheet FA218, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � AREA H (20) �Sheet FA219A, FIRE ALARM VISUAL NOTIFICATION PLAN FIRST FLOOR � HANGAR BID OPTION �WEST� (21) �Sheet FA219B, FIRE ALARM NOTIFICATION PLAN FIRST FLOOR � HANGAR BID OPTION �EAST� (22) �Sheet FA310, FIRE ALARM AUDIBLE NOTIFICATION LEGEND (23) �Sheet FA400, ENLARGED FIRE ALARM PLANS (24) �Sheet FA501, FIRE ALARM AND FOAM SYSTEM DETAILS (25) �Sheet FA601, FIRE ALARM CONTROL PANEL (FACP) MATRIX PART 1 (26) �Sheet FA602, FIRE ALARM CONTROL PANEL (FACP) MATRIX PART 2 (27) �Sheet FA603, FIRE ALARM CONTROL PANEL (FACP) MATRIX PART 3 (28) �Sheet FA604, FIRE ALARM CONTROL PANEL (FACP) MATRIX PART 4 (29) �Sheet FA605, RELEASING SERVICE CONTROL PANEL (RSCP) MATRIX � RSCP040 (30) �Sheet FA606, RELEASING SERVICE CONTROL PANEL (RSCP) MATRIX � RSCP070 (31) �Sheet FA610, RISER DIAGRAM NOTES FIRE ALARM AND ASSOCIATED SYSTEMS (32) �Sheet FA611, RISER DIAGRAM FIRE ALARM, MASS NOTIFICATION, AND (PARTIAL) PUBLIC ADDRESS� SYSTEMS (33) �Sheet FA612, RISER DIAGRAM RELEASING, CONTAINMENT, AND CLEAN AGENT SYSTEMS (34) �Sheet FA620, VISUAL NOTIFICATION ZONES DISTRIBUTION MATRIX (35) �Sheet �FA621, �VISUAL �NOTIFICATION �TRANSMISSION �PRIORITY MATRICES (36) �Sheet FX110, COMPOSITE FIRST FLOOR FIRE PROTECTION PLAN (37) �Sheet FX111, FIRST FLOOR FIRE PROTECTION PLAN � AREA �A� (38) �Sheet FX112, FIRST FLOOR FIRE PROTECTION PLAN � AREA �B� (39) �Sheet FX113, FIRST FLOOR FIRE PROTECTION PLAN � AREA �C� (40) �Sheet FX114, FIRST FLOOR FIRE PROTECTION PLAN � AREA �D� (41) �Sheet FX115, FIRST FLOOR FIRE PROTECTION PLAN � AREA �E� (42) �Sheet FX116, FIRST FLOOR FIRE PROTECTION PLAN � AREA �F� (43) �Sheet FX117, FIRST FLOOR FIRE PROTECTION PLAN � AREA �G� (44) �Sheet FX118, FIRST FLOOR FIRE PROTECTION PLAN � AREA �H� (45) �Sheet FX119A, FIRST FLOOR FIRE PROTECTION PLAN HANGAR BITD OPTION �WEST� (46) �Sheet FX119B, FIRST FLOOR FIRE PROTECTION PLAN HANGAR BID OPTION �EAST� (47) �Sheet FX120, COMPOSITE SECOND FLOOR FIRE PROTECTION PLAN (48) �Sheet FX125, SECOND FLOOR FIRE PROTECTION PLAN � AREA �E� (49) �Sheet FX126, SECOND FLOOR FIRE PROTECTION PLAN � AREA �F� (50) �Sheet FX301, FIRE PROTECTION SECTIONS (51) �Sheet FX302, FIRE PROTECTION SECTIONS (52) �Sheet FX601, FIRE SUPPRESSION SCHEDULES (53) �Sheet �EL501, �LIGHTING �DETAILS �AND �LINE-VOLTAGE �LIGHTING CONTROLS (54) �Sheet EP112, POWER PLAN � FIRST FLOOR AREA B: RECEPTACLES (55) �Sheet EP116, POWER PLAN � FIRST FLOOR AREA F: RECEPTACLES (56) �Sheet EP216, POWER PLAN � FIRST FLOOR AREA F: EQUIPMENT (57) �Sheet EP400, ENLARGED POWER PLANS (58) �Sheet EP401, ENLARGED POWER PLANS (59) �Sheet EP601, ELECTRICAL ONE-LINE DIAGRAM NORMAL POWER (60) �Sheet EP602, ELECTRICAL ONE-LINE DIAGRAM GENERATION POWER (61) �Sheet EP611, EQUIPMENT ELECTRICAL CONNECTION SCHEDULE CF/CI: PART 1 (62) �Sheet EP613, EQUIPMENT ELECTRICAL CONNECTION SCHEDULE CF/CI: PART 3 (63) �Sheet EP614, EQUIPMENT ELECTRICAL CONNECTION SCHEDULE CF/CI: PART 4 (64) �Sheet EP621, PANEL SCHEDULES (65) �Sheet EP644, PANEL SCHEDULES (66) �Sheet EP650, PANEL SCHEDULES (67) �Sheet EP654, PANEL SCHEDULES 2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All� other conditions and requirements of the request for proposal�remain unchanged. 3. � Electronic Proposal/Email. � See section 00 22 00 for how to submit electronic proposals. 4. � Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals,� 16 JUN 2022, as stated in the Request For Proposal. Attachments: Spec Pages listed in 1.a. and 1.b. above Dwgs. listed in 1.c. above U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 1 JUN 2022 jmh/2181 � ********************************************************************************************************************************************** AMENDMENT 0001: 3 MAY 2022 Solicitation No. W9128F22R0048 Date of Issue: 15 APR 2022 Date of Receiving Proposals: 16 JUNE 2022 SUBJECT: �Amendment No. 0001 to Request for Proposal Solicitation Package for Construction of Consolidated Helo/TRF/OPS AMU & Alert Facility TO: � � � Prospective Offerors and Others Concerned 1. � The specifications and drawings for subject project are hereby modified as follows (revise all� specification indices, attachment lists, and drawing indices accordingly). a. � �Drawings �(Reissued). �This �amendment �reissues �the �entire advertised drawings set in� three volumes (Volume 2 Parts 1, 2, and 3) b.� �Proposal due date is adjusted from 30 May 2022 to 16 June 2022. 2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All� other conditions and requirements of the request for proposal remain unchanged. 3. � Electronic Proposal/Email. � See section 00 22 00 for how to submit electronic proposals. 4. � Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals,� 16 JUNE 2022, as stated in the Request For Proposal. **************************************************************************************************************************************************** This project involves the construction of a new, 135,000 sf hangar at Minot AFB, ND to include Helicopter Squadron Operations, Tactical Response Force (TRF) Alert Crew Facility, Alert Aircraft Shelter, Aircraft Maintenance Unit (AMU), Aircraft Maintenance Shelter, Aircraft Simulator complex utilizing conventional design and construction methods to accommodate MMIII ICBM weapons system mission requirements. This facility will become the main control point for all unit flight and flying training tasks including planning, briefing, administration, alert response, life support system, maintenance, crew equipment storage and issue. Complex must provide collocation of the squadron operations facility and alert crew sleeping quarters with the aircraft to minimize crew response times and enhance rescue/security team effectiveness. Sustainability and energy enhancement measures are included. Associated site improvements shall include new taxiways, runway, heli-pads and associated airfield lighting. The North American Industry Classification System (NAICS) code for these services is 236220 Commercial and Institutional Building Construction with a size standard of $36.5M.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/38dcb72d3f334526a4048f6f224e263f/view)
- Place of Performance
- Address: Minot AFB, ND 58704, USA
- Zip Code: 58704
- Country: USA
- Zip Code: 58704
- Record
- SN06345538-F 20220604/220602230109 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |