SOLICITATION NOTICE
Z -- Electrical Power Resiliency - Bldgs. 57 and 58 at DDJC
- Notice Date
- 6/9/2022 8:23:28 AM
- Notice Type
- Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- DLA DISTRIBUTION NEW CUMBERLAND PA 17070-5008 USA
- ZIP Code
- 17070-5008
- Solicitation Number
- SP330022B0001
- Response Due
- 6/22/2022 10:00:00 AM
- Archive Date
- 12/30/2022
- Point of Contact
- Paul J. Holbert, Phone: 7177707492, Joshua L. Woodworth, Phone: (717) 770-4192
- E-Mail Address
-
paul.holbert@dla.mil, joshua.woodworth@dla.mil
(paul.holbert@dla.mil, joshua.woodworth@dla.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- A0002 **Amendment SP330022B00010002 is attached with a Revised Attachment 3.��Amendment 0002 is issued�to provide a revised Attachment 3 and to answer more Vendor questions. A0001 *Amendment SP330022B00010001 is attached with a Revised Attachment 4.��Amendment 0001 is issued to extend the Bid date, to provide a revised Attachment 4, and to answer Vendor questions. Please take note of the postponed Bid Date. See Full Solicitation # SP330022B0001 attached, for SIte Visit Date and Time, Questions Submittal Date, and extensive Electronic Bidding Process, as well as Due Date and Time. PROJECT DESCRIPTION:� � This project will provide construction services to include all labor, management, supervision, tools, materials, equipment, and transportation to Design and Construct an Electric Power Resiliency Bldgs. 57 and 58 project. This project will consist of providing all labor, supervision, materials, tools, and equipment to �Design and Construct roof mounted 500 KW solar photovoltaic system for building 57 and Design and Construct roof mounted 300 KW solar photovoltaic system for building 58�. The project includes the following work: Project Description: Contractor is to provide all labor, supervision, materials, tools, and equipment design and install roof mounted 500 KW solar photovoltaic system for building 57 and 300 KW solar photovoltaic system for building 58. 2. PV electrical output will be interconnected with the existing electric service to each building. 3. All PV generated will be used to displace ""behind-the-meter"" retail electric consumption. 4. The PV solar panels� layout of the rooftop PV system shall be designed so as not to interfere with the servicing of existing mechanical equipment, roof drains, or other roof equipment that requires regular servicing. Access aisles will be provided on the rooftop and appropriate clearances to maintain roof top mechanical equipment. 5. PV system shall meet 85 mph 3 second gush wind load. 6. Use maximum ballasts for PV panel anchoring. Repair, seal, weather tight all roof penetration. Coordinate with the roof manufacturer to provide certificate of roof warranty not invalidated by solar PV installation. 7. Output from the PV panels will be converted to AC through inverter mounted on solar panels and then interconnected to the main electrical switchgear. The new PV systems will tie in with the existing Base-wide electrical distribution system. 8. PV system design include appropriate disconnects and grounding systems to safely interface with the government's distribution. All work shall be performed complete and in accordance with the Specifications including Scope of Work and Drawings. SCOPE OF WORK:� Attachment 2 SPECIFICATIONS: Attachment 3 DRAWING NO(S): Attachment 4 APPLICABLE SUBMITTAL REGISTERS: Attachment 5 PRE-CONSTRUCTION MEETING AND INITIAL and FINAL SUBMITTALS: SECTION F
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/bf63f365a6474588ba5ef9adc12dfb97/view)
- Place of Performance
- Address: Tracy, CA 95304, USA
- Zip Code: 95304
- Country: USA
- Zip Code: 95304
- Record
- SN06353018-F 20220611/220609230103 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |